Meeting Announcement - Meeting Category 1 - Licensee Presentation and Discussion of Root Cause Investigation Results for Degraded Mitigating Systems Cornerstone for Shearon Harris
ML023040201
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/2002
From: Brian Bonser
NRC/RGN-II/DRP/RPB4
To: Scarola J
Carolina Power & Light Co
References
Download: ML023040201 (4)


Text

October 31, 2002 Carolina Power & Light Company ATTN: Mr. James Scarola Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING ANNOUNCEMENT - MEETING CATEGORY 1 - LICENSEE PRESENTATION AND DISCUSSION OF ROOT CAUSE INVESTIGATION RESULTS FOR A DEGRADED MITIGATING SYSTEMS CORNERSTONE FOR SHEARON HARRIS - DOCKET NO. 50-400

Dear Mr. Scarola:

This letter confirms the telephone conversation between John Caves of your staff and George MacDonald of this office on October 8, 2002, concerning a Regulatory Performance Meeting, Public Meeting Category 1, which has been scheduled for November 14, 2002, from 11:00 a.m.

to 12:00 p.m. The purpose of this meeting is to discuss the two white performance issues in the Mitigating Systems Cornerstone which is considered a degraded cornerstone. Per our Reactor Oversight Process Action Matrix, a Regulatory Performance Meeting is required to discuss the performance issues, underlying causes, and planned licensee actions.

The location of the meeting will be at Harris Energy and Environmental Center Board Room, 3932 New Hill-Holleman Road, New Hill, NC 27562. This meeting is an open meeting as per "Staff Meetings Open to the Public; Final Policy Statement" (September 20, 2000; 65 FR 56964). This meeting is designated as a category 1 meeting in accordance with Commission Policy. As such, meetings in this category are typically held with one licensee to discuss particular regulatory issues regarding their specific facility. At this type of meeting, the NRC anticipates that the public would obtain factual information to assist in their understanding of the applicable regulatory issues and NRC actions.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

2 CP&L Should you have any questions concerning this meeting, please contact George MacDonald at 404 562-4543.

Sincerely,

/RA/ (G. T. MacDonald for)

Brian R. Bonser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-400 License No. NPF-63 cc: (See page 3)

3 CP&L cc:

Terry C. Morton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company Electronic Mail Distribution Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Benjamin C. Waldrep Plant General Manager--Harris Plant Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution James W. Holt, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution John R. Caves, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution William D. Johnson Vice President & Corporate Secretary Carolina Power & Light Company Electronic Mail Distribution John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Linda Coleman, Chairman Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Gary Phillips, Chairman Board of County Commissioners of Chatham County Electronic Mail Distribution Distribution: (See page 3)

4 CP&L Hard Paper Copy C. Carpenter, DISP/PIPB Region II Regional Coordinator OEDO (16E15)

RIDSNRRDIPMLIPB PUBLIC Email Meeting Announcement Coordinator, OADM/DFIPS (PMNS)

Region II Administrators Secretary DRP Division Secretaries Region II Division Directors and Deputies Regional Counsel Region II Public Affairs Officer Region II RMB Chief Region II Receptionist Headquarters Operations Officer PUBLIC OFFICE DRP/RII SIGNATURE gm NAME GMacDonald:vg DATE 10/31/2002 10/ /2002 10/ /2002 10/ /2002 10/ /2002 10/ /2002 10/ /2002 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML023040201.wpd