Letter Sequence Other |
---|
|
|
MONTHYEARML0227002192002-09-27027 September 2002 Notice of Consideration of Issuance of Amendment Related to Required Scope of Steam Generator or Tube Inspection Under Exigent Circumstances Project stage: Other ML0230101812002-10-25025 October 2002 Ngs, Unit 1-Review Related to Steam Generator Tube Inspection (Tac. No. MB6378) Project stage: Other ML0228405102002-10-25025 October 2002 (Units 1, 2 &3), Withholding from Public Disclosure, Steam Generator Tube Inspection, TAC No. MB6378 Project stage: Other ML0231104482002-11-0404 November 2002 NRC Staff'S Response to Request for Hearing and Petition for Leave to Intervene Filed by the National Environmental Protection Center and Notice of Appearance Filed by Sherwin E. Turk Project stage: Other ML0232503762002-11-22022 November 2002 Withdrawal of Amendment Request on the Steam Generator Tube Inspection (Tac. MB6378) Project stage: Withdrawal ML0234305442002-12-0404 December 2002 Withdrawal of Amendment Request Project stage: Withdrawal ML0309806852003-03-28028 March 2003 Steam Generator Tubesheet Inspection Information Project stage: Other 2002-11-04
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
October 25, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 - REVIEW RELATED TO STEAM GENERATOR TUBE INSPECTION (TAC NO. MB6378)
Dear Mr. Overbeck:
By letter dated September 26, 2002 (102-04844), as supplemented on October 23, 2002 (102-04856), you requested an amendment to the Technical Specifications (TSs) for the Palo Verde Nuclear Generating Station, Unit 1. The proposed amendment would revise the definition of steam generator tube inspection in TS Section 5.5.9, "Steam Generator (SG) Tube Surveillance Program." In your application, you also requested that the staff issue the amendment on an exigent basis before Unit 1 enters Mode 4 in the restart from the current refueling outage.
These letters provided your justification for the extent and method of the inspection of the SG tubes in the tubesheet region.
Based on our review of your letters, which contain the justification of your use of the plus point coil, we have no objection to your inspection of the SG tubes under the current TSs prior to restart of Unit 1 from the current refueling outage, although we may request further information from you later in order to complete our review of your amendment request. We have also concluded that the proposed amendment is not needed on an exigent basis prior to restart of the plant.
The appropriate use of probes in SG tube inspections, used to comply with TS 5.5.9, will be addressed on a generic basis, and may be the subject of future generic communications.
Sincerely,
/RA by William H. Ruland for/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528 cc: See next page
October 25, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 - REVIEW RELATED TO STEAM GENERATOR TUBE INSPECTION (TAC NO. MB6378)
Dear Mr. Overbeck:
By letter dated September 26, 2002 (102-04844), as supplemented on October 23, 2002 (102-04856), you requested an amendment to the Technical Specifications (TSs) for the Palo Verde Nuclear Generating Station, Unit 1. The proposed amendment would revise the definition of steam generator tube inspection in TS Section 5.5.9, "Steam Generator (SG) Tube Surveillance Program." In your application, you also requested that the staff issue the amendment on an exigent basis before Unit 1 enters Mode 4 in the restart from the current refueling outage.
These letters provided your justification for the extent and method of the inspection of the SG tubes in the tubesheet region.
Based on our review of your letters, which contain the justification of your use of the plus point coil, we have no objection to your inspection of the SG tubes under the current TSs prior to restart of Unit 1 from the current refueling outage, although we may request further information from you later in order to complete our review of your amendment request. We have also concluded that the proposed amendment is not needed on an exigent basis prior to restart of the plant.
The appropriate use of probes in SG tube inspections, used to comply with TS 5.5.9, will be addressed on a generic basis, and may be the subject of future generic communications.
Sincerely,
/RA by William H. Ruland for/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528 cc: See next page DISTRIBUTION PUBLIC PDIV-2 r/f RidsNrrDlpmLpdiv (WRuland) RidsNrrPMJDonohew RidsNrrLAMMcAllister RidsNrrDripRorp (RDennig)
RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter(L. Smith) WBateman ACCESSION NO: ML023010181 NRR-106 OFFICE PDIV-2/PM PDIV-2/SC PDIV/D DLPM/D OGC DE/D EMCB/BC NAME JDonohew WHRuland WRuland JZwolinski STurk RBarrett WBateman for SDembek DATE 10/25/02 10/25/02 10/25/02 10/25/02 10/25/02 10/25/02 10/25/02 OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML023010181.wpd
Palo Verde Generating Station, Units 1, 2, and 3 cc: Mr. Robert Henry Salt River Project Mr. Steve Olea 6504 East Thomas Road Arizona Corporation Commission Scottsdale, AZ 85251 1200 W. Washington Street Phoenix, AZ 85007 Terry Bassham, Esq.
General Counsel Douglas Kent Porter El Paso Electric Company Senior Counsel 123 W. Mills Southern California Edison Company El Paso, TX 79901 Law Department, Generation Resources P.O. Box 800 Mr. John Schumann Rosemead, CA 91770 Los Angeles Department of Water & Power Southern California Public Power Authority Senior Resident Inspector P.O. Box 51111, Room 1255-C U.S. Nuclear Regulatory Commission Los Angeles, CA 90051-0100 P.O. Box 40 Buckeye, AZ 85326 Brian Almon Public Utility Commission Regional Administrator, Region IV William B. Travis Building U.S. Nuclear Regulatory Commission P.O. Box 13326 Harris Tower & Pavillion 1701 North Congress Avenue 611 Ryan Plaza Drive, Suite 400 Austin, TX 78701-3326 Arlington, TX 76011-8064 Mr. Thomas Saporito Chairman National Environmental Protection Center Maricopa County Board of Supervisors P.O. Box 1234 301 W. Jefferson, 10th Floor Buckeye, Arizona 85326 Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, #1206 Albuquerque, NM 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN San Clemente, CA 92672