ML023010080

From kanterella
Jump to navigation Jump to search
Video Tapes
ML023010080
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/29/2002
From: Joseph Donoghue
Office of Nuclear Reactor Regulation
To:
Document Control Desk
Donoghue J, NRR/DLPM, 415-1131
References
Download: ML023010080 (2)


Text

October 29, 2002 MEMORANDUM TO: Document Processing Center FROM:

Joseph E. Donoghue /RA/

Davis-Besse Lessons Learned Task Force

SUBJECT:

DAVIS-BESSE VIDEO TAPES The following attached items should be made available through the Document Control Desk in the File Center:

Compact Disc:

Reactor Head Inspection, 12 RFO, 4/24/98 Video Tapes:

Davis-Besse Weep Hole Video Inspection, #7, 4/19/96 (DB #9607)

Weep Hole Cleaning Nozzle 67 and Mound of Boron, 12 RFO, 5/1/96 (DB #9228)

Davis-Besse Weep Hole Cleaning Nozzle 67, 10 RFO, 5/1/96 (DB #9627)

Davis-Besse Weep Hole Inspection, #6, 4/24/98 (DB #9806)

Reactor Head Cleaning/Inspection, 5/4/98 (DB #98AA)

Weep Hole Inspections, #6A, 4/24/98 (DB #9806A)

Davis-Besse Initial Inspection of CRDMs Flanges before Gasket Removal, 12 RFO, 4/15/00 (DB #0014)

CRD Nozzle Flanges, #22, D-10, F-10, 4/16/00 (DB #0022)

Davis-Besse CRD Nozzle Flange Inspections, #20, 12 RFO, 4/15/00 (DB #0020)

Davis-Besse Looking Down in Flange Holes for Boron, #37, 12 RFO, 4/26/00 (DB #9607)

Davis-Besse Flange Holes Boron Hunt, RFO 12, 4/26/00 (DB #0037)

Final Head Inspection, 12 RFO Boron Accumulated on top of 50'clock locations (Andrew

& Framatome), 4/17/00 (DB #00XX)

Framatome Rx Head Inspection for Boron Deposits Under Insulation Alloy 600, 12 RFO (DB #00X1)

Reactor Vessel Head Inspection, undated (DB #00X2)

Attachments: As stated

October 29, 2002 MEMORANDUM TO: Document Processing Center FROM:

Joseph E. Donoghue /RA/

Davis-Besse Lessons Learned Task Force

SUBJECT:

DAVIS-BESSE VIDEO TAPES The following attached items should be made available through the Document Control Desk in the File Center:

Compact Disc:

Reactor Head Inspection, 12 RFO, 4/24/98 Video Tapes:

Davis-Besse Weep Hole Video Inspection, #7, 4/19/96 (DB #9607)

Weep Hole Cleaning Nozzle 67 and Mound of Boron, 12 RFO, 5/1/96 (DB #9228)

Davis-Besse Weep Hole Cleaning Nozzle 67, 10 RFO, 5/1/96 (DB #9627)

Davis-Besse Weep Hole Inspection, #6, 4/24/98 (DB #9806)

Reactor Head Cleaning/Inspection, 5/4/98 (DB #98AA)

Weep Hole Inspections, #6A, 4/24/98 (DB #9806A)

Davis-Besse Initial Inspection of CRDMs Flanges before Gasket Removal, 12 RFO, 4/15/00 (DB #0014)

CRD Nozzle Flanges, #22, D-10, F-10, 4/16/00 (DB #0022)

Davis-Besse CRD Nozzle Flange Inspections, #20, 12 RFO, 4/15/00 (DB #0020)

Davis-Besse Looking Down in Flange Holes for Boron, #37, 12 RFO, 4/26/00 (DB #9607)

Davis-Besse Flange Holes Boron Hunt, RFO 12, 4/26/00 (DB #0037)

Final Head Inspection, 12 RFO Boron Accumulated on top of 50'clock locations (Andrew

& Framatome), 4/17/00 (DB #00XX)

Framatome Rx Head Inspection for Boron Deposits Under Insulation Alloy 600, 12 RFO (DB #00X1)

Reactor Vessel Head Inspection, undated (DB #00X2)

Attachments: As stated DISTRIBUTION:

PUBLIC ADAMS ACCESSION NO. ML023010080 To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE NRR RES NAME J. Donoghue E. Hackett DATE 10/ 29/02 10/29/02 OFFICIAL RECORD COPY