AmerGen.S An Exelon/Brltlsh Energy Company AmerGen Energy Company, LLC Oyster Creek US Route 9 South PO Box 388 Forked River, NJ 08731-0388 October 10, 2002 2130-02-20296 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - September 2002 Enclosed is the September 2002 Monthly Operating Report for the Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.
Very truly yours, RJD/JJR Enclosure cc:
Administrator, Region I NRC Senior Project Manager Senior Resident Inspector
Docket No:
Date:
Completed By:
Telephone:
50-219 10/05/02 Roger Gayley (609) 971-4406 APPENDIX A Operating Data Report Reporting Period:
September 2002 YEAR TO MONTH DATE CUMULATIVE
- 1.
DESIGN ELECTRICAL RATING (MWe NET).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
650
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWe NET).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal 619 conditions minus the normal station service loads.
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL.
The total number of hours during the gross hours of the reporting period that the reactor was critical 720 6551 208,237.7
- 4.
HOURS GENERATOR ON LINE.
(Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of the hours that the generator 720 6551 208,237.7 was on line plus the total outage hours should equal the gross hours in the reporting period
- 5.
UNIT RESERVE SHUTDOWN HOURS.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or 0
0 918.2 similar reasons but was available for operation.
- 6.
NET ELECTRICAL ENERGY (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine generator minus the normal station service 426,571 4,009,709 116,116,866 loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
Design values have no "Year to Date" or "Cumulative" significance.
Appendix B Unit Shutdowns Docket No:
Date:
Completed By:
Telephone:
50-219 10/5/02 Roger Gayley (609) 971-4406 Reporting Period:
F Forced S Scheduled I
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
September 2002 2
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
Summary:
During September, Oyster Creek generated 426,571 net MWh electric, which was 95.7% of its MDC rating.
No.
Date Type*
Duration Reason' Method of Cause & Corrective Action to (Hours)
Shutting Down Prevent Recurrence Reactor2 None
1.
L L
L