FENOC Perry Nuclear Power Plant 10 Center Road S~PO Box 97 FirstEnergy Nuclear Operating Company Perry, OhBo 44081 October 14, 2002 PY-CEI/NRR-2668L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the September 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
1017/02 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: September 2002 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 505.7 505.7 0.0 594.819.0 Yr-to-Date 6,179.7 6,096.2 0.0 7.393.519.0 Cumulative 102,7649 100,169 2 0.0 113.993.921.0
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 8.
- 9.
- 10.
11.
Page 1 594819.0 7393519.0 I
I I I I
UNIT SHUTDOWNS REPORT MONTH - September 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/07/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3 02-02 9/22/02 F
214.3 A
3 On 9/22/02 at 0141, there was a turbine trip, followed by a reactor scram. The plant remained off line through the end of the month. The trip occurred during the weekly turbine overspeed test.
The forced outage extended into October 2002. The duration hours is just for the month of September.
SUMMARY
- The Perry Plant was on line until 9/22/02 at 0141 when the plant had a main turbine tnp. The plant remained off line through the end of the month of September, 2002.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2