ML022940485
| ML022940485 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/09/2002 |
| From: | Ide W Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 035-00714-WEI/SMM | |
| Download: ML022940485 (4) | |
Text
William E. Ide Palo Verde Nuclear Vice President TEL (623) 393-6116 Generating Station Nuclear Production,
FAX (623) 393-6077 Geneatlg~tt.o,
t 035-00714-WEI/SMM October 9, 2002
"..'.2
,?
.? ;
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Mait Station 7602 P.O Box 52034 Phoenix, AZ 85072-2034
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/5291530 Monthly Operating Reports for SEPTEMBER 2002
- -t~ L.
i Enclosed are the Monthly Operating Reports for SEPTEMBER 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Sue Meyer at (602) 250-3078.
--Sincerely, WEI/SMM/cj
Enclosures:
SEPTEMBER 2002 Monthly Operating Reports cc:
E. W. Merschoff PVNGS Resident Inspector INPO Records Center Utility Data Institute (all w/enclosures)
LAW
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Reporting Period:
50-528 PVNGS-1 10/08/02 S. M. Meyer (602) 250-3078 September 2002
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243
- 4.
- 5.
6.
UNIT SHUTDOWNS Outage Duration Type 1 Hours S
72 Reason 2 C
Method of Shutting Down Reactor3 1
Cause and Corrective Action to Prevent Occurrence Manually tripped RX at 23% power to begin U1RI0 refueling outage.
_...Reason:...
3Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
1 -
Unit I Generating Statistics This Month Yr. to Date Cumulative "Hours'Rea4ctorwa0sCritical 6--
6,480.0 1 1-427I--T Hours Generator was On-Line 648.0 6,480.0 111,367.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 801,128 8,117,508 134,081,066 No.
02-01 Date 9/28
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-529 UNIT NAME:
PVNGS-2 DATE:
10108/02 COMPLETED BY:
S. M. Meyer TELEPHONE:
(602) 250-3078 Reporting Period:
September 2002
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243 Unit 2 Generating Statistics This Month Yr. To Date Cumulative
---3.-- Hours Reactor was Critical 720?0 5,802.0-
_11-1703.5
- 4.
Hours Generator was On-Line 720.0 5,773.6 110,371.6
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 904,101 7,220,548 134,145,059 UNIT SHUTDOWNS Outage Method of Duration Shutting Down No.
Date Type 1 Hours Reason 2 Reactor3 No reactor shutdowns occurred during the month of September 2002.
Cause and Corrective Action to Prevent Occurrence 1F-Force.... 2-Reason:
3Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-530 UNIT NAME:
PVNGS-3 DATE:
10/08/02 COMPLETED BY:
S. M. Meyer TELEPHONE:
(602) 250-3078 Reporting Period:
September 2002
- 1.
Design Electrical Rating (Net MWe):
1269
- 2.
Maximum Dependable Capacity (Net MWe):
1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative 3.-
Hours Reactor was Critical._720.0 6,552.0-1T07,975.7
- 4.
Hours Generator was On-Line 720.0 6,552.0 106,987.9
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 910,181 8,324,750 130,694,200 UNIT SHUTDOWNS Outage Method of Duration Shutting Down No.
Date TypeI Hours Reason2 Reactor 3 No reactor shutdowns occurred during the month of September 2002.
Cause and Corrective Action to Prevent Occurrence 2 Reason:
A.-Equiprmrýent -F llur-e(Ex-pla-in-)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
S 3 Method:.
1-Manual 2-Manual Trip I Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- 1F-Forced S-Scheduled