FENOC FRrs*Et'er*" NiclarCean C a."
Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-02-104 October 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of September 2002.
Respectfully, M. B. Bezilla Vice-President DTJ/cmg Enclosures cc:
NRC Regional Office King of Prussia, PA
UNIT SHUTDOWNS REPORTING PERIOD:
September 2002 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-334 BVPS Unit #1 October 2, 2002 David T. Jones (724) 682-4962 No.
Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 -Other (Explain)
F - Administratve G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
SEPTEMBER 2002 DESIGN ELECTRICAL RATING (Net MWe):
MAX.
DEPENDABLE CAPACITY (Net MWe):
50-334 BVPS UNIT #1 10/01/02 DAVID T.
JONES (724) 682-4962
- Notes: Rated thermal power at
- BVPS-l was uprated from 2652 MWt*
- to 2689 MWt on 10/20/01.
Net
- MDC was also uprated from
- 810 MWe to 821 MWe.
835 821 3a.
HOURS IN REPORTING PERIOD:
- 3.
NO.
OF HRS.
REACTOR WAS CRITICAL:
- 4.
SERVICE HOURS GENERATOR ON LINE:
- 5.
UNIT RESERVE SHUTDOWN HOURS:
- 6.
NET ELECTRICAL ENERGY GEN.
(MWH):
- 7.
GROSS ELECT.
ENERGY GEN.
(MWH):
- 8.
GROSS THERMAL ENERGY GEN.
(MWH):
- 9.
UNIT AVAILABILITY FACTOR (M6):
- 10.
UNIT CAPACITY FACTOR (MDC)
(M):
II.
UNIT FORCED OUTAGE RATE (M):
THIS MONTH 720.0 720.0 720.0 0.0 593210.0 628400.0 1933446.0 100.0 100.4 0.0 YEAR TO DATE 6551.0 6551.0 6551.0 0.0 5388950.0 5705720.0 17479611.0 100.0 100.2 0.0 CUMULATIVE 231575.0 158633.4 156172.9 0.0 117055093.0 124972506.0 385114416.5 68.9 64.2 15.8 la.
- 1.
2.
UNIT SHUTDOWNS REPORTING PERIOD:
September 2002 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-412 BVPS Unit #2 October 2, 2002 David T. Jones (724) 682-4962 (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F - Administratve G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 9/20102 with the Main Unit Condenser parameters degrading due to suspected macro fouling, the Unit began to make incremental load reductions beginning at 0829 hours0.00959 days <br />0.23 hours <br />0.00137 weeks <br />3.154345e-4 months <br /> in order to prevent exceeding Condenser operating limits.
With load incrementally reduced approximately 19% throughout the day, the Unit began to reduce output an additional 13% at approximately 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 9/20/02 in order to clean the Main Unit Condenser. An output of approximately 68% was achieved at 0018 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> on 9/21/02. All four waterboxes of the Main Condenser were required to be cleaned due to the presence of Cooling Tower fill material which had migrated through a damaged basin screen and into the inlet side of the Condenser. While Condenser cleaning continued, the Unit raised output approximately 6% at 1520 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.7836e-4 months <br /> on 9/24/02 in an effort to reduce Turbine vibrations being experienced at the #3 Turbine Trip/Governor Valve.
Upon completion of cleaning all four Condenser waterboxes, the Unit commenced to return to full power at 0539 hours0.00624 days <br />0.15 hours <br />8.912037e-4 weeks <br />2.050895e-4 months <br /> on 9/25/02. A nominal value of 100% output was achieved at 0423 hours0.0049 days <br />0.118 hours <br />6.994048e-4 weeks <br />1.609515e-4 months <br /> on 9/26/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
SEPTEMBER 2002 DESIGN ELECTRICAL RATING (Net MWe):
MAX.
DEPENDABLE CAPACITY (Net MWe):
50-412 BVPS UNIT #2 10/01/02 DAVID T.
JONES (724) 682-4962
- Notes: Rated thermal power at
- BVPS-2 was uprated from 2652 MWt*
- to 2689 Mw1t on 10/30/01.
Net
- MDC was also uprated from
- 820 MWe to 831 MWe.
836 831 HOURS IN REPORTING PERIOD:
NO.
OF HRS.
REACTOR WAS CRITICAL:
SERVICE HOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH):
GROSS ELECT. ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (M}:
UNIT CAPACITY FACTOR (MDC) (M):
UNIT FORCED OUTAGE RATE (M):
THIS MONTH 720.0 720.0 720.0 0.0 561323.0 592063.0 1823375.0 100.0 93.8 0.0 YEAR TO DATE 6551.0 5991.6 5924.9 0.0 4747484.0 5009033.0 15295737.0 90.4 87.2 0.3 CUMULATIVE 130358.0 107346.1 106617.5 0.0 83325576.0 88083776.0 268703318.0 81.8 77.2 9.9 la.
- 1.
2.
3a.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
11.