0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 October 14, 2002 L-2002-206 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operatinq Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the September 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.
Please ntact us should there be any questions regarding this information.
ery t ly yours, Donald E. Jernigan Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I October 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: September 2002
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH)_
830 839 MONTH 696 696 0.0 563075
-YTD 6527 6527 0.0 5545237 CUMULATIVE 183127.5 181314 0.0 148221976
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I October 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH : September 2002 Unit I operated at essentially full power through September 27. At 20:00 on September 27, the unit began to reduce power to 45% for scheduled maintenance. On September 28, Unit 1 held power at 45% while performing maintenance on the 1A main feed pump and main steam safety valve (MSSV) testing. On September 29, Unit I commenced reducing power to begin the refueling outage. On September 30, at 00:01, Unit I was removed from service for maintenance and refueling.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I October 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: September 2002 3
Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor3 Prevent Recurrence 1
9/27102 S
0.0 C
5 Unit 1 began downpower for maintenance and refueling.
2 9/28/02 S
0.0 B
5 Unit I held at approximately 45% power for feed pump maintenance and MSSV testing.
3 9/29/02 S
0.0 C
5 Unit 1 commenced downpower for maintenance and refueling.
4 9/30/02 S
24.0 C
1 Unit 1 offline for maintenance and refueling.
2 F Forced S Scheduled I
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 October 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: September 2002
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH).
830 839 MONTH 720 720 0.0 607520
-YTD 6536.4 6533.6 0.0 5553607 CUMULATIVE 146549.6 144791.3 0.0 119284253
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 October 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: September 2002 Unit 2 operated at essentially full power through the entire month of September.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 October 2, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH: September 2002 3
Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of September.
2 F Forced S Scheduled 1