October 8, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RESCHEDULING OF QUAD CITIES MAINTENANCE RULE INSPECTION
Dear Mr. Skolds:
As per your request, we have rescheduled the upcoming Quad Cities Maintenance Rule inspection. The original date of the inspection was October 21-25, 2002. The new date for the inspection is January 13 - 17, 2003.
The change in schedule was discussed during a phone call between Mr. Z. Falevits of my staff and Mr. T. Fuhs of your Quad Cities staff on October 1, 2002.
If you have questions regarding the schedule change discussed above, please contact Mr. Ronald Gardner at 630-829-9751.
In accordance with 10 CFR 2.790 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ronald N. Gardner Chief, Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution
J. Skolds cc:
Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leach, Manager of Nuclear MidAmerican Energy Company
Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RESCHEDULING OF QUAD CITIES MAINTENANCE RULE INSPECTION
Dear Mr. Skolds:
As per your request, we have rescheduled the upcoming Quad Cities Maintenance Rule inspection. The original date of the inspection was October 21-25, 2002. The new date for the inspection is January 13 - 17, 2003.
The change in schedule was discussed during a phone call between Mr. Z. Falevits of my staff and Mr. T. Fuhs of your Quad Cities staff on October 1, 2002.
If you have questions regarding the schedule change discussed above, please contact Mr. Ronald Gardner at 630-829-9751.
In accordance with 10 CFR 2.790 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ronald N. Gardner Chief, Electrical Engineering Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML022830293.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME ZFalevits:sd MRing RGardner DATE 10/08/02 10/08/02 10/08/02 OFFICIAL RECORD COPY
J. Skolds cc:
Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leach, Manager of Nuclear MidAmerican Energy Company ADAMS Distribution AJM DFT CFL RidsNrrDipmIipb GEG HBC KKB DRPIII DRSIII PLB1 JRK1