Emergency Plan Implementing Procedures Manual Volume C, Revision 2002-10
ML022830220
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/07/2002
From: Mccollum W
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML022830220 (4)


Text

Duke Duke Energy Corporation Oconee Nuclear Station t

'kmnergy.

7800 Rochester Highway Seneca, SC 29672 (84 885-107 OFFICE W. R. McCollum, Jr.

885-FAX Vice

-ý-esdent(864) 885-3564 FAx Vice Presient October 7, 2002 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269,

-270,

-287 Emergency Plan Implementing Procedures Manual Volume C Revision 2002-10 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan: Volume C Revision 2002-10, October 2002.

This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

Any questions or concerns pertaining to this revision please call Rodney Brown, Emergency Planning Manager at 864-885-3301.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.

Very truly yours, W. R. McCo lum VP, Oconee Nuc ear Site xc:

(w/2 copies of attachments)

Mr. Luis Reyes, Regional Administrator, Region II U.

S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, GA 30303 w/copy of attachments Mr. Steven Baggett Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)

NRC Resident Inspector J.

R.

Brown, Manager, Emergency Planning

October 7, 2002 OCONEE NUCLEAR SITE INTRASITE LETTER

SUBJECT:

Emergency Plan Implementing Procedures Volume C, Revision 2002-10 Please make the following changes to the Emergency Plan Implementing Procedures Volume C by following the below instructions.

REMOVE ADD Cover Sheet -

Rev. 2002-09 Cover Sheet Rev. 2002-10 Table of Contents, Page 1 Table of Contents, Page 1 Note:

This revision is only for the correction of Table of Contents page 1 -

DUKE POWER EMERGENCY PLAN IMPLEMENTING PROCEDURES VOLUME C APPROVED:

W. W. Foster, Manager Safety Assurance 10/07/02 Date Approved 10/07/02 Effective Date VOLUME C REVISION 2002-10 October 2002

HP/O/BI1009/018 HP/O/B/1009/020 HP/O/B/1009/021 HP/O/B/1009/022 RP/0/B/1000/001 RP/0/)B/1000/002 RP/O/B/1000/003 A RP/O/B/1000/007 RP/0/B/1000/009 RP/O0B/1/000/010 RP/O/B/1000/015 A RP/0/B/1000/015 B RP/O/B/1000/015 C RP/O/B/1000/016 RP/0/B/1000/017 RP/0/B/1000/018 RP/0/B/1000/019 RPIO/B/1000/020 RPI0/B/1000/021 RP/O/B/1000/022 RPIO/B/1000/024 RPIO/B/1000/028 VOLUME C TABLE OF CONTENTS Off-Site Dose Projections Estimating Food Chain Doses Under Post Accident Conditions Source Term Assessment Of A Gaseous Release From Non-Routine Release Points On Shift Off-Site Dose Projections Emergency Classification Control Room Emergency Coordinator Procedure ERDS Operation Security Event Procedure For Site Assembly Procedure For Emergency Evacuation/Relocation Of Site Personnel Offsite Communications From The Control Room Offsite Communications From The Technical Support Center Offsite Communications From The Emergency Operations Facility Medical Response Spill Response Core Damage Assessment Technical Support Center Emergency Coordinator Procedure Emergency Operations Facility Director Procedure Operations Interface (EOF)

Procedure For Site Fire Damage Assessment And Repair Protective Action Recommendations Communications & Community Relations World Of Energy Emergency Response Plan Revision 2002-10 October 2002 I

08/29/02 10/09/98 12/01/97 08/15/02 06/19/02 08/29/02 12/03/98 08/29/02 02/19/02 04/24/01 12/11/01 12/11/01 12/11/01 09/12/02 05/29/02 09/30/97 05/20/02 08/29/02 04/30/01 07/16/02 11/10/99 02/17/97 I