ML022760494

From kanterella
Jump to navigation Jump to search
Transmittal of Inservice Testing Program for Fourth 10 Year Inspection Interval
ML022760494
Person / Time
Site: Oconee  
Issue date: 06/10/2002
From: Mccollum W
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022760494 (2)


Text

Duke Duke Energy Energy.

Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 W R. McCollum, Jr (864) 885-3107 OFFICE Vice President (864) 885-3564 rAx June 10, 2002 U.

S. Nuclear Regulatory Commission Attention: Document Control Desk 6

Washington, DC 20555

Subject:

Duke Power Company Oconee Nuclear Station Docket Nos.

50-269,

270, 287 Inservice Testing (IST) Program Fourth 10 Year Inspection Interval Pursuant to the 10CFR 50.55a(f),

attached for your information is the Inservice Testing (IST) Program for Pumps and Valves at Oconee Nuclear Station.

This revision (revision 26) reflects our IST Program for the Fourth Inservice Inspection Interval beginning July 1, 2002.

In accordance with 10CFR 50.55a(f) (4),

the IST Program has been updated to meet the provisions of the latest approved editions of the applicable ASME codes and standards.

In accordance with 10CFR 50.55a(f)(5),

the IST Program contains a listing of "test requirements determined to be impractical by the licensee" (i.e.

Relief Requests) and the basis for these determinations.

A summary of the major changes is provided to assist in identifying the changes made which vary from the current revision (revision 25) that was submitted to you on May 26, 1999.

This summary also indicates which of the Relief Requests were approved by the Staff for prior intervals, and which Relief Requests are new.

If there are any questions or further information-i7, needed you may contact R.

P.

Todd at (864) 885-3418.

Very truly yours, W. R. McCollum,

.i0 Site Vice Pre dent AL Attachment

U.

S. Nuclear Regulatory Commission June 10, 2002 Page 2 xc w/att:

L.

A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St.,

SWW, Suite 23T85 Atlanta, GA 30303 L.

N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, DC 20555-0001 xc(w/o attch):

M. E.

Shannon, NRC Senior Resident Inspector Oconee Nuclear Station Mr. Virgil Autrey Division of Radioactive Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environmental Control 2600 Bull St.
Columbia, SC 29201