MONTHYEARML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-02-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML18074A3642017-09-0707 September 2017 Draft Written Exam (Folder 2) ML18074A3652017-08-25025 August 2017 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML18074A3622017-06-27027 June 2017 Draft - Operating Outlines (Folder 2) ML18074A3632017-05-23023 May 2017 Draft - Written Outlines (Folder 2) ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17103A0402017-04-12012 April 2017 Senior Reactor and Reactor Operator Initial License Examinations - Millstone Power Station, Unit 3 ML17087A0862017-03-23023 March 2017 Final Qa/Related Forms (Folder 1) ML17087A0882017-03-10010 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17087A0872017-03-10010 March 2017 Miscellaneous (Folder 1) 2023-02-09
[Table view] |
Text
October 2, 2002 Mr. J. Alan Price, Vice President -
Nuclear Technical Services/Millstone c/o Mr. D. A. Smith, Manager -
Regulatory Affairs Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
SUBJECT:
MILLSTONE 3 SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 50-423/02-301
Dear Mr. Price:
This report transmits the results of the senior reactor operator (SRO) licensing examination conducted by the NRC during the period of Aug 12-15, 2002. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 8, Supplement 1).
Based on the results of the examination, all five Senior Reactor Operator applicants passed all portions of the examination. Examination results indicated that the applicants were well prepared for the examination.
Mr. DAntonio discussed performance insights observed during the examination with Mr. Dale Brodsky on August 15, 2002. On August 26, 2002, final examination results, including individual license numbers, were given during a telephone call between Mr. Brodsky and Mr.
DAntonio.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS ( SRO Written - Accession Number ML022550590; SRO Operating Section A - Accession Number ML022550625; SRO Operating Section B - Accession Number ML022550612; and SRO Operating Section C - Accession Number ML022550644). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html (the Public Electronic Reading Room).
Mr. J. Alan Price 2 Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49
Enclosure:
Initial Examination Report No. 50-423/02-301 cc w/encl:
D. A. Christian, Senior Vice President - Nuclear Operations and Chief Nuclear Officer W. R. Matthews, Vice President and Senior Nuclear Executive - Millstone S. E. Scace, Director, Nuclear Engineering G. D. Hicks, Director, Nuclear Station Safety and Licensing C. J. Schwarz, Director, Nuclear Station Operations and Maintenance P. J. Parulis, Manager, Nuclear Oversight D. A. Smith, Manager, Licensing L. M. Cuoco, Senior Nuclear Counsel N. Burton, Esquire V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)
J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company
Mr. J. Alan Price 3 Distribution w/encl: (VIA E-MAIL)
Region I Docket Room (with concurrences)
A. Cerne, SRI - NRC Resident Inspector H. Miller, ORA J. Wiggins, ORA S. Richards, NRR (ridsnrrdipmlpdi)
T. Madden, OCA H. Nieh, OEDO R. Ennis, PM, NRR G. Wunder, Backup PM, NRR V. Nerses, PM, NRR B. McDermott, RI K. Jenison, RI D. Screnci, PAO W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. DAntonio, Chief Examiner, DRS C. Buracker, DRS (Master Exam File)
DRS File DOCUMENT NAME:C:\ORPCheckout\FileNET\ML022750615.wpd ADAMS PACKAGE: ML020580355 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRP NAME CBuracker JDAntonio RJConte BMcDermott DATE 09/18/02 08/29/02 09/28/02 09/26/02 kmj for OFFICIAL RECORD COPY
U. S. NUCLEAR REGULATORY COMMISSION REGION I Docket No(s): 50-423 License No: NPF-49 Report No: 50-423/02-301 Licensee: Dominion Nuclear Facility: Millstone Unit 3 Dates: August 9, 2002 (Written Examination Administration)
August 12-15, 2002 (Operating Test Administration)
August 18-23, 2002 (Examination Grading)
Examiners: Joseph M. DAntonio, Operations Engineer (Chief Examiner)
Approved by: Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety
SUMMARY
OF FINDINGS IR 05000423/02-301; Aug 9-15, 2002; Millstone 3; Initial Operator Licensing Examination. Five of five applicants passed the examination (two SRO instants, and three SRO upgrades).
The written examinations were administered by the facility and the operating tests were administered by one NRC region-based examiner. There were no inspection findings of significance. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.
ii
Report Details
- 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination
- a. Scope of Review The NRC examiner reviewed the facility developed written and operating initial examinations and together with Millstone 3 training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 8, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Millstone 3 plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The NRC examiner administered the operating portion of the examination to all applicants from August 12-15, 2002. The written examination was previously administered by the Millstone 3 training staff on August 9, 2002.
- b. Findings Grading and Results All five SRO applicants passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Examination Administration and Performance One issue was identified concerning interpretation of Technical Specifications (TS). In a scenario involving loss of a reactor coolant pump, the SRO applicants stated they would consider instrumentation in the idled loop operable and would not place the associated reactor trip system bistables in the tripped condition. This was correct in accordance with facility procedures. However, the inspector considered this to be incorrect understanding of TS because loop delta T in the idle loop is no longer a valid reactor power indication and thus the overpower and overtemperature delta T trips from that loop are inoperable. The facility generated CR-02-08417 to document the issue. A subsequent condition report was generated to evaluate the operability of loop
2 temperature instruments for the low-low Tave interlock, P-12, during idle loop operations in hot standby. This was CR-02-10145.
4OA6 Exit Meeting Summary On August 26, 2002, the NRC provided conclusions and examination results to Millstone 3 management representatives via telephone. License numbers for five of six applicants were also provided during this time. License numbers for the remaining applicant was withheld pending completion of the required reactivity manipulations and time on shift in training. Mr.Brodsky was informed that when the NRC is notified, in writing, that these requirements has been completed by this individual, the license would be issued.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
3 KEY POINTS OF CONTACT LICENSEE Bob Royce Senior Instructor, Operator Training Steve Jackson Senior Instructor, Operator Training Dale Brodsky Supervisor, Initial Operator Training Joe Bergin Acting Manager, Operator Training NRC Joseph DAntonio Operations Engineer LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED ITEM NUMBER TYPE DESCRIPTION NONE