CPSES-200203288, August 2002 Monthly Operating Report for Comanche Peak Unit 1 & 2
ML022680113 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 09/16/2002 |
From: | Walker R TXU Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
10010.2 (RP-84), CPSES-200203288, TXX-02161 | |
Download: ML022680113 (10) | |
Text
TXU TXU Energy C. Lance Terry Comanche Peak Steam Senior Vice President &
Electric Station Principal Nuclear Officer P.O Box 1002 (E01)
Glen Rose, TX 76043 Tel 254 897 8920 Fax: 254 897 6652 lance terry@txu.com Ref: #10CFR50.36 CPSES-200203288 Log # TXX-02161 File # 10010.2 (RP-84)
September 16, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR AUGUST 2002 Gentlemen:
Attached is the Monthly Operating Report for August 2002, prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License, Nos. NPF-87 and NPF-89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.
A member of the STARS (Strategic Teaming and Resource Shanng) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project 9 Wolf Creek
- TXU TXX-02161 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas W. Snow at (254) 897-8448.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By:
Regulatory Affairs Manager DWS/dws Attachment cc - Mr. E.W. Merschoff, Region IV Mr. W.D. Johnson, Region IV Mr. D.H. Jaffe, NRR Resident Inspectors
CPSES-200203288 Attachment to TXX-02161 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 OPERATING STATUS
- 1. REPORTING PERIOD: AUGUST 2002 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150*
DESIGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,831.0 93,065
- 6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2,871
- 7. HOURS GENERATOR ON LINE 744.0 5,831.0 92,279
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,531,416 19,858,922 305,841,052
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 844,024 6,704,224 102,470,845
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 808,994 6,438,392 98,012,297
- 12. REACTOR SERVICE FACTOR 100.0 100.0 88.1
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.8
- 14. UNIT SERVICE FACTOR 100.0 100.0 87.4
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 87.4
- 16. UNIT CAPACITY FACTOR (USING MDC) 94.6 96.0 80.7
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 94.6 96.0 80.7
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 2.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: Ref. SECY-99-034
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813
- ESTIMATED
CPSES-200203288
.Attachment to TXX-02161 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 MONTH: AUGUST 2002 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY Mwe-Net DAY MWe-Net 1 1091 17 1091 2 1091 18 1091 3 1090 19 1091 4 1089 20 1091 5 1087 21 1092 6 1088 22 1091 7 1088 23 1091 8 1087 24 1090 9 1070 25 1088 10 1050 26 1088 11 1089 27 1087 12 1088 28 1090 13 1086 29 1090 14 1088 30 1090 15 1088 31 1089 16 1089
CPSES-200203288 Attachment to TXX-02161 Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 MONTH: AUGUST 2002 DAY TIME REMARK/MODE 08/01 0000 Unit began the month 100% power.
08/31 2400 Unit ended the month 100% power.
CPSES-200203288 Attachment to TXX-02161 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 REPORT MONTH: AUGUST 2002 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION* THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTION/COMMENTS NONE NONE
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- INDICATES SHUTDOWN HOURS/OTHERWISE "NA" FOR NOT APPLICABLE
CPSES-200203288
.Attachment to TXX-02161 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 OPERATING STATUS
- 1. REPORTING PERIOD: AUGUST 2002 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3458** MAX. DEPEND. CAPACITY (MWe-Net): 1150*
DESIGN ELECTRICAL RATING (MWe-Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,020.8 70,524
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,366
- 7. HOURS GENERATOR ON LINE 744.0 4,960.4 70,049
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,542,003 16,685,568 232,276,333
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 861,089 5,690,131 78,838,990
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 828,063 5,467,325 75,605,418
- 12. REACTOR SERVICE FACTOR 100.0 86.1 88.6
- 13. REACTOR AVAILABILITY FACTOR 100.0 86.1 91.6
- 14. UNIT SERVICE FACTOR 100.0 85.1 88.0
- 15. UNIT AVAILABILITY FACTOR 100.0 85.1 88.0
- 16. UNIT CAPACITY FACTOR (USING MDC) 96.8 81.5 82.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.8 81.5 82.6
- 18. UNIT FORCED OUTAGE RATE 0.0 0.6 2.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: Ref. SECY-99-034
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803
- ESTIMATED **Tech Spec Amendment 89 and TRM revision 38 for the 0.4% uprate for a total 1.4% uprate.
CPSES-200203288
,Attachment to TXX-02161 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 MONTH: AUGUST 2002 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY MWe-Net DAY Mwe-Net 1 1025 17 1116 2 1114 18 1116 3 1115 19 1119 4 1113 20 1119 5 1115 21 1120 6 1116 22 1118 7 1115 23 1116 8 1115 24 1115 9 1114 25 1116 10 1114 26 1115 11 1115 27 1117 12 1116 28 1117 13 1116 29 1117 14 1116 30 1116 15 1116 31 1115 16 1116
CPSES;200203288 Attachment to TXX-02161 Page 7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 MONTH: AUGUST 2002 DAY TIME REMARK/MODE 08/01 0000 Unit began the month at 74% power with condenser repairs in progress.
0341 Unit commenced ramp to full power, condenser repairs complete.
1030 Unit at full power.
08/31 2400 Unit ended the month at full power.
It CPSES-200203288 J Attachment to TXX-02161 !
Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 09/16/2002 COMPLETED BY: Herb Kenyon TELEPHONE: 254-897-6382 REPORT MONTH: AUGUST 2002 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION* THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTION/COMMENTS 4b 020801 F B I On July 29, 2002 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, unit began reducing power due to sodium levels in steam generators, resulting from leaking tubes in the condenser. On July 30, at 0023 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br />, unit at 80%
power for condenser repairs. Unit ended the month at 74%
power, condenser repairs in progress. Condenser repairs were completed and the unit ramped to full power on 08/01/2002.
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- INDICATES SHUTDOWN HOURS/OTHERWISE "NA" FOR NOT APPLICABLE