September 20, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4158, MB4159, AND MB4160)

Dear Mr. Overbeck:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating licenses for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, (Palo Verde) to require compliance with the specified interim safeguards and security compensatory measures.

The NRCs letter dated May 14, 2002, addressed your two earlier responses dated March 15, 2002 (102-04666 and 102-04667) to the Order and granted, in response to your request, an extension of time until June 20, 2002 for your submission of the required responses to interim compensatory measures (ICMs) B.2.a(1) and B.2.a(2).

The NRC staff has reviewed your responses to ICMs B.2.a(1) and B.2.a(2), which were submitted in your letter dated June 18, 2002 (102-04809), and finds that you have satisfied the current reporting requirements of the Order.

In your letter of August 30, 2002, (102-04832), you reported that Palo Verde is in full compliance with the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.

This closes out the staffs work for TAC Nos. MB4158, MB4159, and MB4160. If you have any other questions on these issues, contact Jack Donohew, Project Manager for Palo Verde, at 301-415-1307.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528, STN 50-529, and STN 50-530 cc: See next page

September 20, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4158, MB4159, AND MB4160)

Dear Mr. Overbeck:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating licenses for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, (Palo Verde) to require compliance with the specified interim safeguards and security compensatory measures.

The NRCs letter dated May 14, 2002, addressed your two earlier responses dated March 15, 2002 (102-04666 and 102-04667) to the Order and granted, in response to your request, an extension of time until June 20, 2002 for your submission of the required responses to interim compensatory measures (ICMs) B.2.a(1) and B.2.a(2).

The NRC staff has reviewed your responses to ICMs B.2.a(1) and B.2.a(2), which were submitted in your letter dated June 18, 2002 (102-04809), and finds that you have satisfied the current reporting requirements of the Order.

In your letter of August 30, 2002, (102-04832), you reported that Palo Verde is in full compliance with the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.

This closes out the staffs work for TAC Nos. MB4158, MB4159, and MB4160. If you have any other questions on these issues, contact Jack Donohew, Project Manager for Palo Verde, at 301-415-1307.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528, STN 50-529, DISTRIBUTION:

and STN 50-530 PUBLIC GTracy JDonohew cc: See next page PDIV-2 Reading RSullivan TMarsh SCollins/JJohnson JBelanger MMcAllister BSheron VOrdaz SMorris VDricks RAlbert OGC RPalla ACRS/ACNW RCrlenjak SECY LSmith, Region IV GHill(6)

WRuland RMartin RBorchardt

  • See previous concurrence Accession No.: ML022670391 NRR-106 OFFICE DLPM/PM PDIV-2/PM PDIV-1/LA PDIV-2/SC PDIV/PD NSIR DLPM/D NAME RMartin*

JDonohew MMcAllister*

SDembek WRuland RSkelton for AMadison*

JZwolinski DATE 09/16/02 9/17/02 09/16/02 9/17/02 9/17/02 09/16/02 9/18/02 DOCUMENT NAME: G:\\PDIV-2\\PaloVerde\\SecurityOrderCloseOut-MB4158.pv.wpd OFFICIAL RECORD COPY

April 2002 Palo Verde Generating Station, Units 1, 2, and 3 cc:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, #1206 Albuquerque, NM 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Terry Bassham, Esq.

General Counsel El Paso Electric Company 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326