ML022670125
| ML022670125 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 09/19/2002 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML022670125 (6) | |
Text
Tennessee Valley Authonty, Post Office Box 2000, Spnng City, Tennessee 37381-2000 SEP 1 9 2002 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No.
50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)
COMMITMENT
SUMMARY
REPORT The purpose of this letter is to provide the WBN Commitment Summary Report for the period of April 6, 2001 through September 20, 2002, as required by Nuclear Energy Institute's (NEI)
"Guidelines For Managing NRC Commitment Changes."
This report summarizes docketed commitments that TVA has evaluated and revised using administrative controls that incorporate the guidelines.
There are no regulatory commitments in this letter.
If you have any questions, please contact me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Licensing and Industry Affairs Enclosure CC: See Page 2 Pntad on recyced paper
U.S. Nuclear Regulatory Commission Page 2 SEP 1 9 2002 Enclosure cc (Enclosure)
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303
COMMITMENT
SUMMARY
REPORT Commitment Source Document Summary of Original Summary of Basis/Justification For Evaluation #/
Commitment Commitment Changes Commitment Changes Tracking #
2001-24 NC0920042448 GL 83-28 Procurement, installation, operation, testing Decommit Compliance with the Nuclear Quality and maintenance of the reactor trip breaker Assurance Plan (NQAP) is mandatory. No (RTB) shunt trip circuitry will be commitment is needed.
accomplished in accordance with TVAs approved Quality Assurance Plan.
NC0920053063 GL 83-28 Reactor trip system functional test procedures Decommit WBN Technical Specification Table 3.3.1-1 will be revised to reflect operability testing of Item 18 provides test requirements for RTB existing equipment.
undervoltage (UV) and shunt trip function.
2001-28 NC0920030212 GL 83-28 Participate in the Nuclear Plant Reliability Decommit This is included in the NQAP, Appendix B, Data System (NPRDS)
Page 8/23.
NC0920030375 GL 83-28 Update and enhance vendor information Decommit This is included in the NQAP, Appendix B, program.
Page 8/23.
NC0920030384 GL 83-28 Periodic maintenance and trending of Decommit Maintenance Rule 10 CFR 50.65 establishes NC0920030385 parameters program for reactor trip breakers.
requirements for effective maintenance and NC0920030568 WBN Technical Specification Table 3.3.1-1 establishes operability requirements.
NC0920030569 GL 83-28 Trip force, dropout voltage for UV trip and Decommit Operability of RTBs addressed by WBN NC0920030570 breaker insulation resistance will be measured Technical Specification Table 3.3. 1-1 Item 18.
in MI-85.6 and recorded in the electrical maintenance RTB trending log book. Breaker response time for UV trip will be measured in SI-3.1.29 and trending will be performed by I
Commitment Source Document Summary of Original Summary of Basis/Justification For Evaluation N/
Commitment Commitment Changes Commitment Changes Tracking H NC0920042117 NC0920042447 NC0920042741 NC0920042772 NC0920053069 NC0920053084 NC0920053071 GL 83-10 GL 83-28 GL 83-28 GL 83-28 GL 83-28 GL 83-28 instrument maintenance.
The RCP trip criterion being adopted in the Watts Bar-specific procedures not only assures RCP trip for all losses of primary coolant for which trip is considered necessary, but also permits RCP operation to continue during most non-LOCA accidents.
SI will be used to independently verify operability of the UV and shunt trip devices in response to an automatic reactor trip signal.
Procedures will be revised to require events resulting from inadequate or inaccurate vendor information be reported on nuclear network.
MI-85.6 outlines the periodic maintenance requirements for the RTBs.
Technical standard for RTBs will be issued and MI-99.1 will be written to reflect those recommendations.
Maintenance program will be established after life cycle testing of the shunt trip attachment and the UV trip attachment of the reactor trip switchgear information has been made available.
Decommit Decommit Decommit Decommit Decommit Decommit I _____________________
I ____________________________________________
Operability requirements for RTBs provided in WBN Technical Specification Table 3 3.1-1 Item 17.
SRs for RTBs are provided in WBN Technical Specification Table 3.3.1-1 Item 18.
Required by the NQAP Appendix B, page 8/23.
Operability of RTBs required by WBN Technical Specification Table 3.3.1 -1 Item 17.
10 CFR 50.65 establishes maintenance expectations and WBN Technical Specification Table 3.3.1-1 establishes operability for the RTBs.
Operability of RTB, UV, and ST Mechanism addressed by WBN Technical Specification Table 3.3.1-1 Items 17 and 18.
I
Commitment Source Document Summary of Original Summary of Basis/Justification For Evaluation H/
Commitment Commitment Changes Commitment Changes Tracking h#
NC0820253135 NUREG 0737 Develop procedures for use of the reactor Decommit NQAP section 6.1.1 requires procedures for coolant system vessel head vents, quality related activities.
NC0920030299 NUREG 0737 Procedures for functionally testing the PASS Decommit NQAP section 6.1.1 requires procedures for will be developed. The PASS will be tested quality related activities WBN Technical every six months.
Specification Section 5.7.2.6 provides provisions for maintenance of sampling equipment. Note: Subsequent to this revision the Technical Specification section was deleted by Amendment 34.
2001-30 NCO820253074 NUREG 0737 Implement a program to reduce leakage from Decommit This issue is addressed by WBN Technical systems outside containment that would or Specification Section 5.7.2.4.
could contain highly radioactive fluids.
NC0830138008 NUREG 0737 Detailed Instrument Maintenance Instruction Decommit WBN UFSAR Section 7.5.2.1.1 provides a NC0830138015 will be generated for calibration, hardware description of the SPDS and its reliability.
NCO830138016 operation and overall maintenance. The EOI NC0830138017 writer's guide will include reference to the need to verify the SPDS as part of any EOI revision. SPDS setpoints, logic flows, and display formats will be verified against control room instrumentation, operating procedures, and system/sensor characteristics, as applicable.
NCO890169010 NUREG 0737 Setpoints in the emergency procedures will be Decommit These issues previously implemented in site NCO890169011 revised to be more conservative. Procedures operating procedures. Future changes of these will be revised to direct the operator to observe procedures require an evaluation under 10 CFR
Commitment Source Document Summary of Original Summary of Basis/Justification For Evaluation #/
Commitment Commitment Changes Commitment Changes Tracking #
delta pressure indications and system flow.
50.59 which is an equivalent level of review to the UFSAR.
NC0920030830 NUREG 0737 Inventories of supplies and spare parts in the Decommit Operability requirements for essential control MCR supply cabinets will be conducted on a room equipment is controlled by Technical regular basis.
Specification/Technical Requirements Manual and other licensing basis documents. These documents provide an acceptable remedy should "supplied and spare parts" not be available.