Scenario Outline, VC Summer Scenario No. 1 Plant Operating at 90% Power B Train Equipment in Service
ML022630061
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/16/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2002-0371
Download: ML022630061 (12)


Text

Scenario Outline 0 Form ES-D-1

^----*,.,,,-I;v r*

  • P Scenario Outline 9 Form ES-D-1 VCSUMMER _ Scenario No.: 1 Op-Test No.: _99-1 Facility:

Operators:

Examiners: ..J..G. HOPPER__

._._L. MELLEN_ __

SSYKES_:.

Objectives:

HAS Initial Conditions: PLANT OPERATING AT 90% POWER. 'B' TRAIN EQUIPMENT IN SERVICE. PCV-445A HI/LO ANNUNCIATOR JUST ALARMED.

BEEN ISOLATED DUE EXTERNAL LEAKAGE. 'C' ACCUM PRESS HEAVY THUNDERSTORMS IN THE AREA.

OOS SERVICE Turnover: PCV-4448 HAS MINOR SEAT LEAKAGE. 'A'TRAIN COMPONENT COOLING PUMP FOR MAINTENANCE (CLEARING TAGS). 30 GPD LEAKAGE ON 'A S/G.

Event Malf. No. Event Event No. Type* Description 1 N-RO RAISE 'C' ACCUMULATOR PRESSURE 2 PRS-001A I-RO PZR PRESSURE CONTROL CHANNEL PT-444 FAILS HI (SEVERITY=2500, RAMP=-15)

PRS-004B PCV-444B STICKS OPEN (SEVERITY=50%, RAMP-5. DELAY=5, TRIGGER-JMLPRSIA)

I-BOP 3 MSS-009E 'C' STEAMLINE FLOW XMITTER FT-494 FAILS LO (SEVERITY=O, RAMP=10) 4 CCW-007B C-8OP LOSS OF OPERATING COMPONEIT COOLING WATER TRAIN 51--- N-RO REALIGN LETDOWN TO DEMINERALIZERS 6 CVC-004A C-RO RCP 'A' #1 SEAL FAILURE (SEVERITY =7.5, RAMP=120) 7 R-ALL SRO DIRECTS POWER REDUCTION TO <38% @ 3%/MINUTE 8 CVC-004A M-ALL RCP 'A' #1 SEAL FAILURE (SEVERITY 100, RAMP=30)

RCS-006A RCP SEAL LOCA (SEVERITY=300, RAMP=180, DELAY=60)

LOA-EPS-138 'B' TRAIN EQUIPMENT FAILS TO AUTO SI. MANUALLY ACTUATE 'B' TRAIN ECCS EQUIPMENT (SELECT=OPEN,TRIGGER=JPPLSI(1))

PMP-CS004S 'A' CHARGING PUMP SHEARED SHAFT MSS-008B FAIL BANK 1 STEAM DUMP VALVE OPEN (SEVERITY=100, RAMP=IO, DELAY=5, TRIGGER--JPPLSI(1))

I_ _ _ _ I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • (N)ormal, (R)eactivity, (I)nstrument, kL,)ompornent, %1wv0u'JT

A A Appendix D " Operator Actions 1W Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 1 Page 1 of 1 Event

Description:

Raise 'C' Safety Injection Accumulator Pressure

[Time Position Applicants Actions or Behavior RO Ensure the Accumulator Nitrogen Vent, HCV-936, is closed.

Open Nitrogen Supply, PVT-8880.

Open Nitrogen Supply to 'C' Accumulator, PVT-8875C.

Monitor Accumulator 'C' Pressure Indication.

When Accumulator Pressure is between 600 PSIG and 656 PSIG, close Nitrogen Supply to 'C' Accumulator, PVT-8875C.

Place Control Switch for PVT-8880 to CLOSE/AUTO to close PVT 8880.

Appendix D 1W Operator Actions Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 2 Page 1 of 1 Event

Description:

Pressurizer Pressure Control Channel PT-444 Fails High Pressurizer PORV, PCV-444B, Sticks Open

[-Time Position Applicants Actions or Behavior RO Operator verifies failed Control Channel

"* PI-444 indicates HI

"* PZR CNTRL PRESS HI Annunciator

"* PZR PRESS HI/LO Annunciator

"* PZR PRESS HI Annunciator Checks position of Pressurizer PORV's and places PCV-444B control switch to CLOSE.

uts Valve MVG-8000B, Block Valve for PCV-444B.

Compare Control Channel Indications to Protection Channel PI-455, 456, and 457. This may have been done in Step 1.

' Close the Pressuorzer Spray Valves PCV-444C and PCV-444D.

, Control the PZR PRESS Master Control in Manual.

Operate Pressurizer Heaters and Spray Valves in Manual to control RCS pressure between 2220 PSIG and 2250 PSIG.

Verify PI-445, CNTRL CHAN PRESS PSIG, Indication is Normal.

Ensure Rod CNTRL BANK SEL Switch is in AUTO.

Maintain RCS Pressure between 2220 PSIG and 2250 PSIG.

_ __ I I1 I 4

_____ I ________

A Appendix D IRW Operator Actions Form ES-D-2 Op-Test No.: 99-1 Scenario No.: I Event No.: 3 Page 1 of 1 Event

Description:

'C' Steamline Flow Transmitter FT-494 Fails Low

[ Time Position Applicants Actions or Behavior 14I BOP Operator recognizes indications for failed FT-494 "zo 0 FI-494 indicates LOW 0 SG C FWF > STF Mismatch Annunciator Takes Manual Control bf FCV-498, 'C' Feed Control Valve.

Operator adjusts FCV-498 so Feedflow > Steamflow on FI-495.

Operator selects operable Steam Flow Channel FY495A.

Operator selects matching Feed Flow Channel FY496A.

Operator controls FCV-498 to restore 'C' Steam Generator level to

=61%.

Operator verifies Feedwater Speed Control is operating properly.

Operator verifies all Steam Generator water levels are normal.

Operator places FCV-498 Control in AUTO.

I4 4

I 4 4

I 4

____ J. 4

____ J._______ +/-

  • b, Aft Appendix D 1W Operator Actions W Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 4 Page 1 of 2 Event

Description:

Loss of Operating Component Cooling Water Train

[Time Position Applicants Actions or Behavior

,,t.50 BOP Operator recognizes indications for a trip of'B' CCW Pump

", CCP B/C Trip Fail Annunciator

"* 'B' CCW Pump Amps reading 0

"* CCW Loop B PP DISCH PRESS LO Annunciator Within one minute the operator should 7' & Start '(F' CCW Pump on 'A' Train

  • Start 'A' Charging Pump a Stop 'B' Charging Pump Operator should establish 'A' CCW Train and the Active Train O Start MVB-9503A, CC to RHR HX A, stroking in the Closed direction
  • When flow on FI-7034 is between 5000 GPM and 4000 GPM rapidly

- Open MVB-9687A/9525A

- Open MVB-9524A/9526A

- Close MVB-9524B/9526B

- Close MVB-9687B/9525B

- Open MVB-9503B

  • Have Auxiliary Building operator verify sample flow to RML2A is greater than one GPM
  • Ensure the following Valves have not closed on High Flow

- MVG-9625

- MVG-9626

- MVG-9583

- MVT-9593A/B/C

Appendix D Operator Actions Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 4 Page 2 of 2 Event

Description:

Loss of Operating Component Cooling Water Train Time I Position T Applicants Actions or Behavior

  • Ensure 'B' CCW Pump Switch is in NORMAL-AFTER STOP or PTL
  • If 'B' Charging Pump Switch is not placed in PTL, the pump will restart on a Safety Injection signal and must be secured.
  • Operator may notify CRS that the LCO for two trains of CCW is not met.

Onerator Actions w Form E-D-2 AppendixD v

Form ES-D-2 Derator Actions Scenario No.: 1 Event No.: 5 Page 1 of 1 Op-Test No.: 99-1 Event

Description:

Realign Letdown to Demineralizers Time Position Applicants Actions or Behavior RO Operator verifies conditions are met to restore Letdown Demin Flow

"* Annunciator XCP-613 (1-2), DEMIN FLO DIVERT TEMP HI, clear

"* Letdown temperature on TI-143 less than 135°F Operator places TCV-143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO.

Appendix D w Operator Actions Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 6 Page 1 of I Event

Description:

Reactor Coolant Pump 'A' Number One Seal Failure

-im Position Applicants Actions or Behavior RO Operator recognizes indications of abnormal leakoff from 'A' RCP #1

_____ *Seal a RCP A #1 SL LKOFF FLO HI/LO Annunciator Operator breaks out ARP XCP-617 (2-1) and monitors Seal Leakoff Flow on FR-154B.

Operator ensures Seal Injection Flow to 'A' RCP is greater than 8 GPM on FI-130A.

Operator ensures CCW Flow to 'A' RCP Thermal Barrier is between 35 GPM and 60 GPM on FM-7138.

Operator monitors lower Seal Water Bearing temperature on T0417A.

Operator monitors #f1 Seal Leakoff temperature on T0181A.

Operator determines that #1 Seal Leakoff Flow is greater than 6 GPM by monitoring FR-154A, RCP SL LKOFF HI RANGE.

Commence plant power reduction to allow securing 'A' RCP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

After the subsequent Safety Injection, the operator should secure 'A' RCP.

Within three to five minutes after 'A' RCP is secured, close RCP 'A' Seal Leakoff PVT-8141A.

w ,-'

V orm I-iJ-L 1-' C Th -

Appendix D 1W Operator Actions NL-- I*rOl1n -L -

Onerator Actions Op-Test No.: 99-1 Scenario No.: 1 Event No.: 7 Page 1 of 1 Event

Description:

Power Reduction to < 38% (@3%/Min.

STime Position Applicants Actions or Behavior SRO CRS directs power reduction at 3%/min.

BOP Reduces Turbine Load

  • Deenergizes LOAD LMT circuit
  • Energizes DEC LOAD RATE circuit
  • Selects 3%/min. on LOAD RATE LMT - %
  • Depress DECREASE pushbutton to reduce LOAD SET to value directed by CRS RO Monitors control rods to ensure TAvE is decreasing with automatic inward rod motion.

Opens MVG-8 104 as necessary to minimize TAVE - TREF mismatch.

RO BOP Secure one MFP per SOP-210 when directed by CRS 0 Open MFP Turbine Drain Valve MOV-1-5 0 Place MFP recirculation in Manual 0 Decrease MFP speed controller output to 0 0 Trip the MFP using the FWP PP TRIP/RESET switch at the MCB 0 Dispatches operator to verify HP & LP Stop Valves have closed 0 Ensures MFP turbine is on turning gear when speed is 0.

BOP Secures one MFBP when directed by CRS.

Appendix D Operator Actions Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 8 Page 1 of 3 Event

Description:

RCP Seal LOCA

'B' Train ESFLS Failure, 'A' Charging Pump Broken Gear Box Bank 1 Steam Dump Fails Open Time Position Applicants Actions or Behavior RO Recognizes increase in 'A' RCP #1 Seal Failure/Seal LOCA 0 RCP Seal Bearing temperature increasing

  • PZR level decreasing
  • Charging flow increasing iROBOP Trips the reactor when directed by CRS or when S OP- 10 1 RCP trip TO/B OP criteria are met.

('OR BtOP . SI's when directed by CRS or after automatic SI.

SRO Secures 'A' RCP after the reactor trip.

S,90/ Performs Immediate Actions of EOP-1.0

- Verifies turbine trip 0 Verifies ESF buses energized BOP Recognizes failure of 'B' Train ESFLS to sequence and informs RO/CRS 0 Recognizes 'A' Charging Pump low amps and informs CRS. Calls AB operator to investigate.

- '0 Closes PVT-814aA, 3-5 minutes after securing 'A' RCP.

"- RO Directs TB operator to ra0k up 'C' Charging Pump on 'A' Train and rack down 'A' Charging Pump.

Appendix D 19W Operator Actions . Form ES-D-2 Op-Test No.: 99-1 Scenario No.: 1 Event No.: 8 Page 2 of 3 Event

Description:

RCP Seal LOCA

'B' Train ESFLS Failure, 'A' Charging Pump Broken Gear Box Bank 1 Steam Dump Fails Open

[ Time 1, 4Positin Applicants Actions or Behavior OP Crew should NOT secure 'B' & 'C' RCPs when RCS pressure decreases < 1400 psig until SI flow is established from 'C' Charging Pump.

RO During i, iffal check after Immediate Actions:

.7* Recognizes 'B' RHR failed to start and manually starts it

  • Recognizes one 'B' Train RBCU failed to start and manually

/ starts it 7 *Recognizes 'B' SWBP did not start and manually starts it.

BOP Performs Attachment 3 of EOP-1.0 to verify proper operation of all ESF equipment (If not already performed by the NROATC).

  • Recognizes 'B' RHR failed to start and manually starts it.
  • Recognizes one 'B' Train RBCU did not start and manually starts it
  • Recognizes 'B' SWBP did not start and manually starts it.

BOP/RO Recognizes failure of one Bank 1 Steam Dump and attempts to manually close with the steam dump controller BOP/RO Dispatches an operator to locally close or isolate the failed open steam dump.

SRO,/ Transitions to EOP-2.0, Loss of Reactor on Secondary Coolant.

/  !? Resets SI, Phase A Isolation, Phase B Isolation.

BOP Resets ESF Loading Sequencers.

Ash Auk Appendix D Operator Actions Form ES-D-2 O Op-Test No.: 99-1 Scenario No.: 1 Event No.: 8 Page 3 . of 3 Event

Description:

RCP Seal LOCA

'B' Train ESFLS Failure, 'A' Charging Pump Broken Gear Box Bank 1 Steam Dump Fails Open

[ Time Position I Applicants Actions or Behavior RO Establishes Instrument Air to RB 0 Opens PVA-2659

  • Opens PVT-2660 0 Directs TB AO to reset 'A' IA Compressor RO Secures RHR Pumps when directed by CRS.

SRO Transitions to EOP-2.1, Post-LOCA Cooldown and Depressurization.

BOP Initiates RCS Cooldown BOP 0 Places both STM DUMP INTERLOCK switches to BYP INTLK RO 0 Places both STMLN SI TRAIN switches to BLOCK BOP 0 Places Steam Dumps in STM PRESS mode BOP 0 Adjusts Steam Dump controller to establish cooldown rate <

100°F/hr.