Notification of Duke Energy Corporation Implementation of NRC Order for Interim Safeguards & Security Compensatory Measures Issued on 02/25/2002
ML022610301
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  
Issue date: 09/06/2002
From: Tuckman M
Duke Energy Corp, Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022610301 (5)


Text

kDuke Duke Power 526 South Church St. EC07H Charlotte, NC 28202 A Duke EnergV Company P.O. Box 1006 EC07H Charlotte, NC 28201-1006 M. S. Tuckman (704) 382-2200 OFFICE Executve Vice President (704) 382-4360 FAX Nuclear Generation September 6, 2002 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001

SUBJECT:

DUKE ENERGY CORPORATION IMPLEMENTATION OF NRC ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES Oconee Nuclear Station, Docket Nos. 50-269, -270, -287 McGuire Nuclear Station, Docket Nos. 50-369, -370 Catawba Nuclear Station, Docket Nos. 50-413, -414 This letter serves as required notification pursuant to section III.C.2. of Nuclear Regulatory Commission Orders for Interim Safeguards and Security compensatory measures issued on February 25, 2002. These Orders amended the licenses of Oconee, McGuire and Catawba Nuclear Stations by adding certain specific requirements associated with physical security and safeguards.'

The Orders were effective immediately and specified a number of actions to be taken with a schedule requirement for completion of implementation no later than August 31, 2002. In accordance with the Orders, Duke Energy previously provided responses specifying the actions to be taken by Duke Energy to comply with the Order requirements. 2 As necessary those responses were supplemented with additional information describing Duke Energy actions to achieve compliance.3 The Nuclear Energy Institute and the Nuclear Regulatory Commission issued implementation guidance documents that Duke used in implementing Order requirements.

Duke Energy has conducted an internal assessment reviewing the effectiveness of implementation of the Orders. This assessment was conducted in separate weeks at Catawba, McGuire and Oconee Nuclear Station from July 28, 2002 until August 15, 2002. The results of the assessment have been evaluated and reviewed with management.

Duke Energy management has determined that the requirements of the Orders have been implemented at all three Duke Energy Nuclear Sites. In making this determination, Duke considered the stated Order requirements, Duke responses to the Order and the published guidance regarding the Order. Any questions on this correspondence can be addressed to Michael T. Cash, Manager of Regulatory and Industry Affairs (704.382.5826, mtcash@duke-energy.com).

M. S. Tuckman

U.S. Nuclear Regulatory Commission

  • September 6, 2002 Page 2

"ý--*blae of Relevant Correspondenice6

-(Footnoted References within Cover Letter) 1 Letters, Samuel J. Collins, NRC ONRR, to Michael S. Tuckman, Executive VP Nuclear Generation, Duke Energy Corporation, dated February 25, 2002,

Subject:

Issuance of Order for Interim Safeguards and Security Compensatory Measures for Catawba, McGuire, and Oconee Nuclear Stations; 2 Letters, Duke Energy Corporation, Catawba, McGuire, and Oconee Nuclear Stations, to U.S. NRC Document Control Desk, dated March 18, 2002,

Subject:

Response to Commission Order to Modify License for Interim Safeguards and Security Compensatory Measures Letter, Duke Energy Corporation, McGuire Nuclear Station, to U.S. NRC Document Control Desk, dated March 18, 2002,

Subject:

Request for Extension of Time to Submit an Answer and Request a Hearing; Letter, Duke Energy Corporation, McGuire Nuclear Station, to U.S. NRC Document Control Desk, dated April 30, 2002,

Subject:

Revised Response to Item 5.d. of the NRC Order for Interim Safeguards and Security Compensatory Measures for McGuire Nuclear Station dated February 25, 2002 Letter, Duke Energy Corporation, McGuire Nuclear Station, to U.S. NRC Document Control Desk, dated July 28, 2002,

Subject:

Updated Response to ICM B.1.c. of the NRC Order for Interim Safeguards and Security Compensatory Measures dated February 25, 2002 Letter, Duke Energy Corporation, McGuire Nuclear Station, to U.S. NRC Document Control Desk, dated September 4, 2002,

Subject:

Supplemental Response to NRC Order for Interim Safeguards and Security Compensatory Measures for McGuire Nuclear Station dated February 25, 2002; Letter, Duke Energy Corporation, Catawba Nuclear Station, to U.S. NRC, Document Control Desk, dated May 1, 2002,

Subject:

Revised Response to NRC Order for Interim Safeguards and Security Compensatory Measures for Catawba Nuclear Station dated February 25, 2002; Letter, Duke Energy Corporation, Catawba Nuclear Station, to U.S. NRC, Document Control Desk, dated August 27, 2002,

Subject:

Supplemental Response to NRC Order for Interim Safeguards and Security Compensatory Measures for Catawba Nuclear Station dated February 25, 2002; Letter, Duke Energy Corporation, Oconee Nuclear Station, to U.S. NRC, Document Control Desk, dated May 01,2002,

Subject:

Supplementa! response to NRC Order for Interim Safeguards & Security Compensatory Measures for Oconee Nuclear Station dated February 25,2002 Letter, Duke Energy Corporation, Oconee Nuclear Station, to U.S. NRC, Document Control Desk, dated September 5, 2002,

Subject:

Supplemental Response to NRC Order for Interim Safeguards & Security Compensatory Measures for Oconee Nuclear Station dated February 25, 2002 4 Letter, Ralph Beedle, NEI, to Chief Nuclear Officers, dated March 8, 2002,

Subject:

Security Order Guidance; Letter, Samuel Collins, NRC ONRR, to Chief Nuclear Officers, dated March 11, 2002,

Subject:

Review of Industry Guidance Related to Interim Safeguards and Security Compensatory Measures; Letter, Ralph Beedle, NEI, to Chief Nuclear Officers, dated March 11, 2002,

Subject:

NRC Letter Endorsing Security Order Guidance; Letter, Roy Zimmerman, NRC ONSIR, to Ralph Beedle, NEI, dated July 26,

Subject:

Review of Revised Industry Guidance Related to Interim Safeguards and Security Compensatory Measures

U.S. Nuclear Regulatory Commission September 6, 2002 Page 3 M. S. Tuckman, affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

M. S. Tuckman, Executive Vice President Subscribed and sworn to me:

(Date)

Qvk-Notary Public My Commission Expires:

SEAL 47 ut ey 2Z7j 3

(Date)

MICHAEL T. CASH Notary Public Lincoln County, North Carolina Commission Expires January 22, 2003

U.S. Nuclear Regulatory Commission September 6, 2002 Page 4 cc:

L. A. Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center, Suite 23T85 61 Forsyth Street, S.W.

Atlanta. GA 30303-3415 C. P. Patel (Addressee Only)

NRC Senior Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, D. C. 20555-0001 R. E. Martin NRC Senior Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, D. C. 20555-0001 L. N. Olshan NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, D. C. 20555-0001 M. C. Shannon Senior Resident Inspector Oconee Nuclear Station (ON01 NC)

S. M. Shaeffer Senior Resident Inspector McGuire Nuclear Station (MG01VP)

D. J. Roberts Senior Resident Inspector Catawba Nuclear Station (CN01 RC)

U.S. Nuclear Regulatory Commission September 6, 2002 Page 5 bcc:

T. W. King (ON01SC)

W. A. Evans (MG01SC)

W. T. Byers (CN01SC)

W. R. McCollum (ON01VP)

H. B. Barron, Jr. (MGOIVP)

G. R. Peterson (CN01VP)

M. T. Cash (ECO50)

B. J. Dolan (MGOIVP)

R. L. Sweigart (CN01VP)

W. W. Foster (ON01VP)

L. E. Nicholson (ON01 RC)

C. J. Thomas (MG01 RC)

G. D. Gilbert (CN01 RC)

R. L. Gill (EC12R)

L. F. Vaughn (ECI 1X)

T.W. Keener (EC050)

T. R. Puryear (N. C. Electric Membership Corp.)

NC Municipal Power Agency No. 1 Piedmont Municipal Power Agency Saluda River Electric Corporation NRIA File/ELL (EC050)

Oconee Master File ON03DM McGuire Master File MG01 DM Catawba Master File CN04DM T r,