ML022600251
| ML022600251 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/11/2002 |
| From: | Donohew J NRC/NRR/DLPM/LPD4 |
| To: | |
| Donohew J N, NRR/DLPM,415-1307 | |
| Shared Package | |
| ML022600454 | List: |
| References | |
| Download: ML022600251 (1) | |
Text
Containment Penetrations 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 APPLICABILITY:
The containment penetrations shall be in the following status:
- a.
The equipment hatch closed and held in place by four bolts, or if open. capable of being closed:
- b.
One door in each air lock is capable of being closed; and
- c.
Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:
- 1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or
- 2.
capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System.
NOTE---
Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere may be unisolated under administrative controls.
During CORE ALTERATIONS.
During movement of irradiated fuel assemblies within containment.
ACTI ONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Suspend CORE Immediately containment ALTERATIONS.
penetrations not in required status.
AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.
AMENDMENT NO. 4-17 143 144 I
PALO VERDE UNITS 1,2,3 3.9.3-1