ML022590341

From kanterella
Jump to navigation Jump to search

Biweekly Notice Memo, Notice of Issuance, Emergency Diesel Generator Allowed Outage Time
ML022590341
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/25/2002
From: Michael Webb
NRC/NRR/DLPM/LPD4
To:
Office of Nuclear Reactor Regulation
Webb M, NRR/DLPM, 415-1347
References
TAC MB3041
Download: ML022590341 (2)


Text

September 25, 2002 MEMORANDUM TO: Biweekly Notice Coordinator FROM:

Michael K. Webb, Project Manager, Section 1

/RA/

Project Directorate IV Division of Licensing Project Management

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE (TAC NO. MB3041)

Entergy Gulf States, Inc., and Entergy Operations, Inc., Docket No. 50-458, River Bend Station, Unit 1, West Feliciana Parish, Louisiana Date of amendment request: September 24, 2001, as supplemented by letters dated April 22 and July 29, 2002.

Brief description of amendment: The amendment extends the allowed outage time for a Division I or Division II Emergency Diesel Generator (EDG) from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days. The changes are intended to provide flexibility in scheduling EDG maintenance activities, reduce refueling outage duration, and improve EDG availability during plant shutdowns.

Date of issuance: September 25, 2002 Effective date: As of the date of issuance and shall be implemented 60 days from the date of issuance.

Amendment No.: 125 Facility Operating License No. NPF-47: The amendment revised the Technical Specifications.

Date of initial notice in FEDERAL REGISTER: December 12, 2001 (66 FR 64292)

The April 22 and July 29, 2002, supplemental letters provided clarifying information that did not change the scope of the original Federal Register notice or the original no significant hazards consideration determination.

The Commissions related evaluation of the amendment is contained in a Safety Evaluation dated September 25, 2002.

No significant hazards consideration comments received: No.

September 25, 2002 MEMORANDUM TO: Biweekly Notice Coordinator FROM:

Michael K. Webb, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE (TAC NO. MB3041)

Entergy Gulf States, Inc., and Entergy Operations, Inc., Docket No. 50-458, River Bend Station, Unit 1, West Feliciana Parish, Louisiana Date of amendment request: September 24, 2001, as supplemented by letters dated April 22 and July 29, 2002.

Brief description of amendment: The amendment extends the allowed outage time for a Division I or Division II Emergency Diesel Generator (EDG) from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days. The changes are intended to provide flexibility in scheduling EDG maintenance activities, reduce refueling outage duration, and improve EDG availability during plant shutdowns.

Date of issuance: September 25, 2002 Effective date: As of the date of issuance and shall be implemented 60 days from the date of issuance.

Amendment No.: 125 Facility Operating License No. NPF-47: The amendment revised the Technical Specifications.

Date of initial notice in FEDERAL REGISTER: December 12, 2001 (66 FR 64292)

The April 22 and July 29, 2002, supplemental letters provided clarifying information that did not change the scope of the original Federal Register notice or the original no significant hazards consideration determination.

The Commissions related evaluation of the amendment is contained in a Safety Evaluation dated September 25, 2002.

No significant hazards consideration comments received: No.

DISTRIBUTION:

Non-Public RidsNrrDlpmLpdiv1 (RGramm)

RidsNrrPMMWebb PDIV-1 Reading RidsNrrLADJohnson Accession No.: ML022590341 OFFICE PDIV-1/PM PDIV-1/LA OGC PDIV-1/SC NAME MWebb DJohnson AHodgdon (nlo w/comments)

RGramm DATE 9/25/2002 9/25/02 9/24/02 9/25/02 OFFICIAL RECORD COPY