Letter Sequence Other |
---|
|
|
MONTHYEARML0225404322002-09-18018 September 2002 Summary of Conference Call with Tennessee Valley Authority the 2001 Steam Generator Inspection Results at Sequoyah Unit 1 Project stage: Other 2002-09-18
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20293A0802020-10-28028 October 2020 Summary of October 13, 2020, Closed Meeting with TVA on Responses to Requests for Additional Information Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20203M2292020-08-11011 August 2020 July 16, 2020, Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss Responses to Requests for Additional Information Regarding Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20108E9092020-06-22022 June 2020 Summary of April 16, 2020, Virtual Meeting with Tennessee Valley Authority to Discuss Submittal of an Exigent License Amendment Request Operate One Cycle with One Control Rod Removed ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20055C2312020-03-0505 March 2020 Summary of February 20, 2020 Pre-submittal Meeting - Operation Without Control Rod H8 and Fuel Transition ML20035C8192020-02-12012 February 2020 Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML19038A4692019-02-28028 February 2019 Summary of January 31, 2019 Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - ML18344A5672019-01-15015 January 2019 November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16117A5512016-05-0202 May 2016 04/01/2016 Sequoyah Nuclear Plant, Units 1 and 2 - Summary Of Public Meeting With TVA Regarding Hydrology-Related Licensing Actions (CAC Nos. ME9238 And ME9239) ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16029A3512016-02-0505 February 2016 Summary of January 19, 2016, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Technical Specifications for Sequoyah Nuclear Plant, Units 1 and 2 ML15238A3422015-09-22022 September 2015 July 22, 2015 Summary of Telecon Between NRC and TVA, Concerning RAI Set 25 Pertaining to SQN, Units 1 and 2 License Renewal Application ML15233A0352015-09-22022 September 2015 July 20, 2015, Summary of Telephone Conference Call Held Between NRC and TVA Concerning RAI, Set 25 Pertaining to the Sequoyah Units 1 and 2 License Renewal Application (TAC Nos. MF0481 and MF0482) ML15236A0672015-09-0909 September 2015 August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA ML15152A0312015-06-23023 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. NRC and TVA, Concerning RAI, Set 24 Pertaining to the Sequoyah Nuclear Plant License Renewal Application ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14174A7372014-07-30030 July 2014 June 19, 2014, Summary of Telephone Conference Call Held Between NRC and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah, Units 1 & 2, License Renewal Application ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 2024-01-18
[Table view] Category:Memoranda
MONTHYEARML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23121A0772023-05-11011 May 2023 Transmittal of Final Accident Sequence Precursor Report Regarding Centrifugal Charging Pump 1B-B ML21246A2812021-09-29029 September 2021 Memo to File ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20164A1442020-06-0303 June 2020 Memorandum from David Lochbaum 2.206 Petition - Review of TVA Employee Concerns Program ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML18024A0252018-01-24024 January 2018 Approval for Credit for the Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours ML17108A2952017-04-17017 April 2017 Public Meeting Summary - Sequoyah Nuclear Plant ML16131A6202016-05-12012 May 2016 Summary of Public Meeting - Sequoyah, Units 1 and 2 to Provide Opportunities to Discuss the Annual Assessment ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15092A8092015-09-21021 September 2015 Renewal of Full Power Operating License for the Sequoyah Nuclear Plant, Units 1 and 2 ML15103A5852015-08-14014 August 2015 SQN Continued Storage Note to File - OGC Comments ML15107A1042015-04-17017 April 2015 4/20/2015 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) on Sequoyah Nuclear Plant Planned Submittal of Relief Request Regarding Flaws in the Reactor Closure Vessel Head Nozzles ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15079A0922015-03-19019 March 2015 Memo 3/19/3015: Sequoyah Nuclear Plant Units 1 and 2 License Renwal Application ML15037A7192015-02-0606 February 2015 Minutes of the ACRS Plant License Renewal Subcommittee Meeting - November 5, 2014 ML14281A5842014-10-24024 October 2014 Federal Register Notice Regarding the ACRS Plant License Renewal (Sequoyah), November 5, 2014 ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML13239A0772013-10-0707 October 2013 8/13/13 - Summary of Meeting Between the Nuclear Regulatory Commission & Tennessee Valley Authority for Clarification of Cultural Resource Request for Additional Information Related to the Sequoyah Nuclear Plant License Renewal Environmenta ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA ML13255A3682013-09-0606 September 2013 Written Limited Appearance Statements ML13231A2202013-08-15015 August 2013 Memorandum from the Atomic Safety and Licensing Board Dated August 15, 2013, Forwarding Written Limited Appearance Statements from Various Individuals ML13225A2152013-08-0606 August 2013 Memorandum from the Atomic Safety and Licensing Board Forwarding Written Limited Appearance Statements from Beverly Kerr Dated July 23, 2013 and Stewart Horn Dated August 2, 2013 ML13171A0362013-08-0101 August 2013 Summary of Telephone Conference Call Held on June 13, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA ML13126A2522013-07-25025 July 2013 Request for Additional Information on the 2013 Decommissioning Funding Status Report ML13105A3942013-04-16016 April 2013 Location Change - Notice of Forthcoming Meeting for Public Meeting with Tennessee Valley Authority (TVA) on 2.1 Response Extension Request, Sequoyah Nuclear Plant and Watts Bar Nuclear Plant ML13102A2522013-04-16016 April 2013 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) Regarding Sequoyah Nuclear Plant, Units 1 and 2 Conversion to Improved Technical Specifications (ITS) ML13067A3312013-03-20020 March 2013 03/03/2013 Notice of Meeting to Discuss the License Renewal Process and Environmental Scoping for Tennessee Valley Authority, Sequoyah Nuclear Plant, Units 1 and 2 ML13078A4212013-03-19019 March 2013 Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar for Commercial Grade Dedication Program ML12215A4212012-10-10010 October 2012 9/5/12 Meeting Summary for Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Appendix R (Fire Protection) ML12234A7582012-08-22022 August 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority (Tva), Regarding Sequoyah Nuclear Plant, Units 1 and 2 Appendix R (Fire Protection) ML12215A4202012-08-0909 August 2012 8/23/12 Forthcoming Notice of Meeting with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2, Appendix R (Fire Protection) IR 05000390/20100082012-07-0606 July 2012 Errata for Electronic Closure of Watts Bar Inspection Report 05000390/2010-008 Memo Dated July 21, 2011 (ML 112020591) ML12178A4742012-06-28028 June 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Unit Station Service Transformers Amendment Request(Tac Nos. ME8772 & ME8773) ML1120205912011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar IR 05000327/20100082011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar ML1119507132011-07-15015 July 2011 the Nuclear Regulatory Commission Staff Spot-Check Review of Tennessee Valley Authority'S One Hundred Percent Ownership Interest of Sequoyah Nuclear Plant, Unit 2, on July 7, 2011 - Finding of No Potential Issues ML1119507002011-07-15015 July 2011 the Nuclear Regulatory Commission Staff Spot-Check Review of Tennessee Valley Authority'S One Hundred Percent Ownership Interest of Sequoyah Nuclear Plant, Unit 1, on July 7, 2011 - Finding of No Potential Issues ML1107000312011-04-15015 April 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Responses to NRC Requests for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pre ML1100600842011-01-0707 January 2011 Notice of Meeting with Tennessee Valley Authority to Discuss the Steam Generator Replacement During the Fall 2012 Refueling Outage for Sequoyah Nuclear Plant, Unit 2 ML1031600802010-11-12012 November 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority ML1029901502010-10-26026 October 2010 Cancelled - Notice of Meeting with (Tva), to Discuss Responses to the NRC Requests for Additional Information (Rals) for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis. ML1027404372010-10-12012 October 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 ML1024402482010-09-0101 September 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Fuel Transition from Existing AREVA-MARK Bw Fuel to New AREVA-High Thermal Performance Fuel for Sequoyah Nuclear Plant, Units 1 and 2 ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants ML1010407332010-05-0707 May 2010 Notice of Conference Call with Tennessee Valley Authority for Sequoyah, Units 1 and 2, Watts Bar, Unit 1 to Discuss Responses to NRC Requests for Additional Information for Generic Letter 2004-02 ML1000800082010-01-11011 January 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 & 2; Watts Bar Unit 1 2023-05-22
[Table view] |
Text
September 18, 2002 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Unit 1
SUBJECT:
SUMMARY
OF CONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING THE 2001 STEAM GENERATOR INSPECTION RESULTS AT SEQUOYAH UNIT 1 (TAC NO. MA5427)
On November 8, 2001, the NRC staff participated in several conference calls with the Tennessee Valley Authority (TVA) to discuss the ongoing steam generator (SG) inspection activities at Sequoyah Nuclear (SQN) Plant, Unit 1. The issues discussed included those listed in the enclosure to the letter documenting the arrangement of this conference call, which was sent to TVA on October 25, 2001 (ML012990363). All information documented in this outage summary was provided verbally by the licensee during the conference call. At the time of this call, the acquisition of eddy current data was almost complete, but the analysis of the eddy current data was still ongoing.
The licensee stated that primary-to-secondary SG leakage was less than 0.1 gallons per day during the previous cycle and, therefore, no secondary side hydrostatic tests were conducted.
The licensees initial SG inspection scope was as follows:
C Full length examination of 100 percent of the inservice tubes with a bobbin probe in all four SGs C Examination of 100 percent of the inservice tubes in the hot leg (HL) top-of-tubesheet (TTS) region of all four SGs with a rotating pancake coil (RPC) equipped with a Plus point (+Pt) coil C Examination of the U-bend region of 100 percent of the inservice tubes in Rows 1 and 2 and 20 percent of the inservice tubes in Row 3 in all four SGs with an RPC probe equipped with a +Pt coil C Examination of 100 percent of tube support plate (TSP) dents greater than or equal to 1 volt (as measured by the bobbin coil probe) in all four SGs with an RPC probe equipped with a
+Pt coil
The licensee stated that the following indications had been identified at the time the conference call occurred.
LOCATION TYPE QUANTITY FOUND COMMENTS TTS Axial PWSCC 12 TTS Circ PWSCC 14 TTS Axial ODSCC 12 TTS Circ ODSCC 2 TSP Axial PWSCC (ARC) 236 (37 require plugging)
TSP Circ PWSCC 25 Approx. 3499 dents
(> 5 volt dents) inspected with +Pt TSP Circ PWSCC 21 Approx. 5174 dents (2 - 5 volt dents) inspected with +Pt TSP Circ PWSCC 17 Approx. 7449 dents (1 - 2 volt dents) inspected with +Pt TSP Circ PWSCC 4
< 1 volt dents)
TSP Axial ODSCC (ARC) 794 (none require plugging)
TSP Circ ODSCC 24 AVB Wear 1 requires plugging CL Wastage 8 require plugging U-BEND Axial ODSCC 1 (Row 3)
U-BEND Geometry 4 - 5 preventive plugging TTS - top-of-tubesheet ARC - alternate repair criteria AVB - anti vibration bar TSP - tube support plate Circ - circumferential OD - outside diameter PWSCC - primary water stress corrosion cracking CL - cold leg ODSCC - outside diameter stress corrosion cracking Additional information provided by the licensee on several of these degradation modes is provided below.
TSP Axial PWSCC (ARC)
Two hundred and thirty six (236) indications were identified at the time the conference call took place. The ARC requires a tube to be plugged if the flaw extends outside the TSP and if that portion of the flaw is greater than 40 percent throughwall. Approximately, 37 of the 236 indications required plugging due to flaw depths greater than 40 percent throughwall outside the TSP. None of the 37 indications challenged the structural or leakage integrity performance
criteria, and therefore, did not require in situ pressure testing. In addition, none of the remaining tubes with indications required plugging since the flaw sizes within the TSP were within acceptable limits.
TSP Circ PWSCC The licensee stated that none of the circumferential indications challenged the leakage or structural integrity performance criteria or required in situ pressure testing. Therefore, TVA did not expand the scope of inspections of dented intersections below the 1-volt threshold. Some of the circumferential indications were located at the same TSP intersection as an axial indication (i.e., mixed mode). However, none of the mixed mode flaws were determined to be interacting (i.e., separated less than 0.25 inches), therefore, further evaluation was not necessary. (Mixed mode flaws that interact may cause the tubes burst pressure to be lower than if only one of the flaws was present.) The SG inspections were not complete at the time of the call, so the staff requested that TVA contact the NRC if any mixed mode flaws were found to be interacting following completion of the conference call.
U-Bend Axial ODSCC and U-Bend Geometry The licensee identified one axial ODSCC flaw in the U-bend of a Row 3 SG tube. As a result, they expanded the scope of U-bend inspections to include 100 percent of Row 3 tubes and 20 percent of Row 4 tubes. No additional flaws were identified. This was the first outage that Row 3 tubes were inspected with an RPC probe, however they had been previously inspected with a bobbin probe. Based on a review of historical bobbin probe data, the licensee stated that they believe the indication was present for several cycles. The indication was estimated to have a 58 percent average depth, 70 percent maximum depth, 0.25 inches long and 0.51 volts.
The flaw was calculated to have a burst pressure of approximately 5000 psi, which is above the structural integrity performance burst criteria of 4173 psi. However, the licensee planned to in situ pressure test the flaw due to potential uncertainties with the eddy current sizing technique.
TVA stated that they assessed the noise levels in the U-bends at Sequoyah Unit 1 and found them to be lower than those in the Electric Power Research Institute (EPRI) qualification data.
In addition, they do not believe hourglassing has occurred, because they do not have large dents, and the dents they do have are localized and mainly present in the lower TSPs. Also, they do not have any significant TSP ligament cracking.
During this outage, TVA dedicated two eddy current analysts to measuring noise levels in the data from the sludge pile region, U-bends and TTS. The licensee stated that a large portion of data was reanalyzed, a large number of tubes were retested to obtain better data quality, and 4 or 5 tubes were being preventively plugged due to geometry signals in the U-bends. The licensee stated that these signals were most likely due to permeability and had not changed over time. These tubes were being preventively plugged because of the possibility that the signals may be capable of masking actual flaw signals.
In Situ Pressure Tests The licensee stated that they follow EPRI guidelines for in situ pressure testing. The criteria for determining whether in situ testing is required due to leakage integrity concerns are based on flaw voltages. To determine whether a tube requires testing due to structural integrity
concerns, the licensee calculates an estimated burst pressure based on flaw sizing estimates.
Uncertainties are factored in to the flaw sizing estimates. Any tube whose calculated burst pressure is below three times normal operating pressure differentials (the 3 P structural integrity performance criteria) is in situ pressure tested.
At the time of this call, no tube required in situ pressure testing due to leakage or structural integrity concerns. However, as previously discussed, the licensee planned to test the Row 3 tube with a U-bend indication.
Repair Plans The licensee planned to plug-on-detection all tubes with flaws except for wear (which would be depth-sized and plugged based on technical specification criteria) and tubes that were permitted to be left in-service based on NRC approved alternate repair criteria.
Sleeving and Tube Pulls No sleeving or tube pulls were planned.
Fall 2001 Three Mile Island Unit 1 Issue The licensee discussed their assessment of the impact of the Fall 2001 Three Mile Island Unit 1 (TMI-1) issued, discussed in NRC Information Notice 2002-02 (ML013480327), on Sequoyah Unit 1s inspection plans. TVA indicated that they did not plan to deplug any tubes. The licensee instructed eddy current analysts to carefully monitor the data for wear scars in the vicinity of plugged tubes. NRC staff indicated that based on the information available at that time, they had no further questions.
/RA/
Ronald W. Hernan, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-327
Enclosures:
As stated cc w/encls: See next page
ML022540432 OFFICE PDII-2\PM PDII-2\PM PDII-2\LA EMCB\SC PDII-2/SC NAME EBrown RHernan BClayton LLund KJabbour (A)
DATE 9/16/2002 9/18/2002 9/16/2002 9/17/2002 9/18/2002 Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT cc:
Mr. J. A. Scalice Mr. Mark J. Burzynski, Manager Chief Nuclear Officer and Nuclear Licensing Executive Vice President Tennessee Valley Authority Tennessee Valley Authority 4X Blue Ridge 6A Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, Tennessee 37402-2801 Mr. Pedro Salas, Manager Mr. Karl W. Singer, Senior Vice President Licensing and Industry Affairs Nuclear Operations Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Mr. D. L. Koehl, Plant Manager Mr. Jack A. Bailey, Vice President Sequoyah Nuclear Plant Engineering & Technical Services Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6A Lookout Place Soddy Daisy, TN 37379 1101 Market Street Chattanooga, TN 37402-2801 Mr. Russell A. Gibbs Senior Resident Inspector Mr. Richard T. Purcell Sequoyah Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, TN 37379 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health General Counsel Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex ET 11A 401 Church Street 400 West Summit Hill Drive Nashville, TN 37243-1532 Knoxville, TN 37902 County Executive Mr. Robert J. Adney, General Manager Hamilton County Courthouse Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 6A Lookout Place Ms. Ann P. Harris 1101 Market Street 341 Swing Loop Road Chattanooga, TN 37402-2801 Rockwood, Tennessee 37854