September 10, 2002 Harold B. Ray, Executive Vice President San Onofre, Units 2 and 3 Southern California Edison Co.
P.O. Box 128, Mail Stop D-3-F San Clemente, California 92674-0128
SUBJECT:
INSPECTION DATE FOR TEMPORARY INSTRUCTION 2515/148, INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES - SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3
Dear Mr. Ray:
In the mid-cycle assessment letter transmitted on August 26, 2002, the NRC indicated that a follow-up letter would be needed to describe the dates for implementing the temporary instruction that would be used to verify compliance with the NRC Security Order issued on February 25, 2002.
Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued August 28, 2002. After discussions with your staff, the NRC has scheduled an inspection using this temporary instruction September 16-20, 2002.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have questions about this inspection, please contact me at 817/860-8215.
Sincerely,
/RA/
Gail M. Good, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-361 50-362 Licenses: NPF-10 NPF-15
Southern California Edison Co. cc:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, California 92504 Eileen M. Teichert, Esq.
Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, California 92522 Joseph J. Wambold, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112-4150 Ed Bailey, Radiation Control Program Director Radiologic Health Branch California Department of Health Services P.O. Box 942732 (MS 178)
Sacramento, California 94234-7320 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672
Southern California Edison Co. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, California 95814 Douglas K. Porter, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, California 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Dr. Raymond Waldo Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, California 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128
Southern California Edison Co. Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (KEB)
DRS Director (EEC)
Senior Resident Inspector (CCO1)
Branch Chief, DRP/C (CEJ1)
Senior Project Engineer, DRP/C (WCW)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
R. Hannah, Acting PAO (RDH1)
W. A. Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (GMG, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)
R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)
B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
J. Shea, Chief, Regional Operations Staff, OEDO (JWS1)
W. Ruland, NRR Project Director (WHR)
S. Dembek, Chief, Section 2, NRR/DLPM (SXD)
L. Raghavan, NRR Project Manager (LXR1)
Hard Copy:
Records Center, INPO S:DRS\\DRSLTRS\\SOICM.WPD RIV:PSB C:DRP/C C:PSB GPick CEJohnson GGood
/RA/
/RA/
MPShannon for 9/10 /02 9/10 /02 9/10 /02 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax