ML022530304

From kanterella
Jump to navigation Jump to search
Letter to Anthony Pietrangelo
ML022530304
Person / Time
Issue date: 09/10/2002
From: Beckner W D
NRC/NRR/DRIP/RORP
To: Pietrangelo A R
Nuclear Energy Institute
Tjader T., NRC/RORP, 415-1187
References
NUREG-1430
Download: ML022530304 (2)


Text

September 10, 2002Mr. Anthony R. Pietrangelo, DirectorRisk and Performance Based Regulation Nuclear Energy Institute 1776 Eye Street, N.W., Suite 400 Washington, DC 20006-2496

Dear Mr. Pietrangelo:

This is to inform you that disposition has been made on Technical Specification Task Force(TSTF)-430 containing proposed changes to the Standard Technical Specification (STS)

NUREG-1430, Babcock and Wilcox Plants, made by the Nuclear Energy Institute (NEI) TSTF.

The staff is prepared to approve TSTF-430 with respect to the proposed changes to Low Pressure Injection and Containment Spray completion time extensions. The staff is not prepared to approve the proposed completion time extensions to the "modified time zero" completion times, since the resolution of TSTF-439 will apply to those completion times. The staff is closing out TSTF-430 with a recommendation to modify it and submit TSTF-430 Revision 1 based upon the final results of approved TSTF-439.This completes our review of TSTF-430, Revision 0. Please contact me at (301) 415-1156 ore-mail rld@nrc.gov if you have any questions or need further information on this disposition.Sincerely,/RA/William D. Beckner, Program Director Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulationcc:T. Silko, BWROGD. Bice, CEOG N. Clarkson, BWOG S. Wideman, WOG D. Hoffman, EXCEL M. Shoppman, NEI

ML022530304DOCUMENT NAME: G:\RORP\TSS\TJADER\TSTF Disposition Letter TSTF_430.wpdOFFICETSS:RORP:DRIPSC:TSS:RORP:DRIPPD:RORP:DRIPNAMETRTjaderRLDennigWDBecknerDATE09/09/200209/10/200209/10/2002