ML022490195
| ML022490195 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/30/2002 |
| From: | James M. Levine Arizona Public Service Co |
| To: | Tracy G Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-04832-JML/SAB/RAS, EA-02-026 | |
| Download: ML022490195 (3) | |
Text
LAM6 James M. Levine Executive Vice President Generation TEL (602)250-2095 FAX (602)250-3002 Mail Station 9046 P 0 Box53999 Phoenix, AZ 85072-3999 EA-02-026 102-04832-JML/SAB/RAS August 30, 2002 U.S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Mail Stop O-6H16 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
References:
Dear Sirs:
Subject:
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop P1-37 Washington, DC 20555
- 1. Letter from S. J. Collins, USNRC to J. M. Levine, APS, and Order Modifying License dated February 25, 2002
- 2. APS letter no 102-04666-JML/SAB/RAS dated March 15, 2002 from J. M. Levine to S. J. Collins, USNRC,
Subject:
Response
to 20 Day Request and Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
- 3. APS letter from 102-04809-JML/SAB/RAS dated June 18, 2002 from J. M. Levine to Glenn Tracy, USNRC,
Subject:
Supplemental Response to 20 Day Request and Answer to NRC Order for Interim Safeguards and Security Compensatory Measures Palo Verde Nuclear Generating Station (PVNGS)
Docket Nos. STN 50-528, 50-529 and 50-530 Report of Full Compliance with the Requirements Described In Attachment 2 to the Order for Interim Safeguards and Security Compensatory Measures Pursuant to Section II1.C.2 of the February 25, 2002 Order (Reference 1), APS hereby reports to the Commission that actions, as articulated in APS' previous responses to the order (References 2 and 3), have been taken and full compliance with the order has been achieved.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance 1"
I 'j Callaway 0 Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project 0 Wolf Creek
U. S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Report of Full Compliance with the Requirements Described in Attachment 2 to the Order for Interim Safeguards and Security Compensatory Measures Page 2 If you have questions concerning this matter, please contact me at 602-250 2095 or Mr. Scott Bauer at 623-393-5978.
Sincerely, JML/SAB/RAS cc:
NRC Region IV Administrator NRC Resident Inspector D. G. Naujock J. N. Donohew
STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA I, Gregg R. Overbeck, represent that I am Senior Vice President, Nuclear, and the foregoing Supplemental Response to 20 Day Request and Answer to NRC Order for Interim Safeguards and Security Compensatory Measures has been signed by me, with full authority to do so on behalf of the Arizona Public Service Company, and to the best of my knowledge and belief, the statements made therein are true and correct.
/,AOregg k
eck Sworn Before Me This Day Of 0,4x
,2002.
Pu 77 Notary Publi WF A
SEAL" Nora E. Meador NoayPb3ofo Notary Commission Stamp