Fs_,inj (,nntrol Rnnm Systems and Facilitv Walk-Through Test Outline Form ES-301-2 Facility: Vermont Yankee Date of Examination: Aug 12. 2002 Exam Level (circle one): RO / SRO(I) /iSROU Operating Test No.: 1 B.1 Control Room Systems System / JPM Title Type Safety Code* Function

a. SLC/SLC Initiation with failed pump and squib valve D, A, S 1
b. MS/MSIV Slow Closure D, S 5
c. Radiation Monitoring/Protective Action Recommendation M, A, S, L 9 B.2 Facility Walk-Through
a. DC/Transfer DC-3A to DC-1 6
b. RHRlAlternate Shutdown N, R, L 4
  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

JPM-SROUPltl Rev. 0, 05/02 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE

-WORKSHEET Task Identificationf

Title:

Transfer DC-3A to DC-1

Reference:

ON 3160. Loss of DC-2 and DC-3 (Rev. 3)

Task Number: 2000320501 ROISRO Only SE Only Task Performance: AO/RO/SRO X Sequence Critical: Yes X No Time Critical: Yes _ No X Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance _Discuss Setting: Classroom _ Simulator -Plant X Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS FAIL Time Required:

o 10L Prepared by: ate ng Instructor

___RS____

Reviewed by: Date SRO Licensed! rtified Reviewer Approved b 5___ ___ __Date

- ~.L

  • .arulDate ~

JPM-SROUPltl Rev. 0, 05/02 Page 2 of 6 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant was operating at 100% power when a complete loss of DC-2 and DC-3 occurred. Off Normal procedure ON-3160 has been entered.

Initiating Cues:

The SCRO has directed you to transfer DC-3A to DC-1 LAW ON 3160, Step 12 a- c.

Task Standards:

DC-3A transferred to DC-1 Required Materials:

ON-3 160, Loss of DC-2 and DC-3 (latest revision)

Simulator Setup:

N/A

JPM-SROUPltl Rev. 0, 05/02 Page 3 of 6

- TIME START:

SAT/UNSAT Step 1: Obtain and review procedure Standard: Procedure reviewed and obtained Breaker #10 at DC-1 SAT/UNSAT +*Step 2: Close DC-3A Manual Transfer (Emerg Switch CLOSE position Standard: Operator places Breaker #10 at DC-1 in the to the LEFT in the ON position Interim Cue: Inform Operator that the switch has been moved SAT/IUNSAT +*Step 3: At DC-3A, open the Normal Breaker (Ckt 26) on DC-3A in the OPEN Standard: Operator places the Normal (Ckt 26) Breaker position been moved to the RIGHT in the OFF Interim Cue: Inform Operator that the Normal Breaker has position plate SAT/UNSAT +*Step 4: Loosen the knurled knob on the metal interlock to loosen Standard: Operator rotates the knurled knob counter clockwise loosened.

Interim Cue: Inform Operator that the knurled knob has been

JPM-SROUPltl Rev. 0, 05/02 Page 4 of 6 SAT/UNSAT +*Step 5: Slide the metal interlock plate downward Standard: Operator slides the metal interlock plate downward Interim Cue: Inform Operator that the metal interlock plate has been moved to the downward position SAT[UNSAT SIte 6: Re-fiehten the knurled knob Standard: Operator turns the knurled knob clockwise to tighten Interim Cue: Inform Operator that the knurled knob has been re-tightened.

SAT/UNSAT +*Step 7: Close the Emergency Breaker (Ckt 25) on DC-3A Standard: Operator places the Emergency Breaker in the CLOSE position Interim Cue: Inform Operator that the Emergency Breaker has been moved to the RIGHT in the ON position SAT[UNSAT Step 8:Inform Control Room that DC-3A has been transferred to DC-1 Standard: Operator informs Control Room that DC-3A has been transferred to DC-1 Interim Cue: As Control Room, acknowledge report of transfer TIME FINISH:

Terminating Cue: DC-3A transferred to DC-1 LAW ON 3160 Step 12

JPM-SROUPltl Rev. 0, 05/02 Page 5 of 6 Evaluator Commentts:

System: 263000 K/A's: K4.01, K4.02

JPM-SROUPltl Rev. 0, 05/02 Page 6 of 6 Examinee Handout Initial Conditions:

The plant was operating at 100% power when a complete loss of DC-2 and DC-3 occurred. Off Normal procedure ON-3 160 has been entered.

Initiating Cues:

The SCRO has directed you to transfer DC-3A to DC-1 IAW ON 3160, Step 12 a - c.

JPM-SROUPlt2 Rev. 0, 05/02 Page 1 of 9 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Alternate Shutdown Operator #2 Actions

Reference:

OP 3126. Shutdown Using Alternate Shutdown Methods (Rev. 16)

Task Number: 2007170501 Task Performance: AO/RO/SRO _ RO/SRO Only X SE Only Sequence Critical: Yes X No_

Time Critical: Yes No X Individual Performing Task: -

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance _ Discuss Setting: Classroom _ Simulator Plant X Performance Expected Completion Time: 35 minutes Evaluation Results:

Performance: PASS FAIL Time R -equired:

Prepared by: e-Operations raining Instructor Date Date

JPM-SROUPlt2 Rev. 0, 05/02 Page 2 of 9 Jirections:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions tefore beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be perform in the Plant and you are to simulate all actions.

You are requested to "talk-through"? the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

initial Conditions:

A fire in the control room has forced the evacuation of the control room. The Initial Actions in the control room from OP 3126, Shutdown Using Alternate Shutdown Methods, have been completed.

Operators 1-4 have been dispatched to complete Appendices A-D in the plant.

Initiatina Cues:

You have been directed to complete Appendix B of OP 3126 for Operator #2. You have a portable radio and a set of operator keys.

Task Standards:

Perform Shutdown From Outside the Control Room Required Materials:

OP-3 126, Shutdown Using Alternate Shutdown Methods Simulator Setup:

N/A

JPM-SROUP1t2 Rev. 0, 05/02 Page 3 of 9 E3valuation Performance Steps

-TIME START:

SAT/UNSAT Step 1: Obtain and review procedure Standard: Obtain and review procedure SAT/UNSAT *Step 2: Isolate and depressurize the outboard MSIV air header by performing the following:

Close air supply valves (on mezzanine above the TIP Room):

. IA-28A

. IA-28B Open air header vent valves (on mezzanine above the TIP Room):

. IA-28D

. IA-28E Standard: Operator turns IA-28A CW to the close position felt Interim Cue: Inform Operator that the valve turns CW, valve stem lowers, hard stop is Standard: Operator turns IA-28B CW to the close position Interim Cue: Inform Operator that the valve turns CW, valve stem lowers, hard stop is felt Standard: Operator turns IA-28D CCW to the open position Interim Cue: Inform Operator that the valve turns CCW, valve stem rises, hard stop is felt Standard: Operator turns IA-28E CCW to the open position air sound is Interim Cue: Inform Operator that the valve turns CCW, valve stem rises, hard stop is felt. An heard venting from the bottom of the open ended piping.

JPM-SROUPlt2 Rev. 0, 05/02 Page 4 of 9 HEADER SUPPLY Step 3: If required, close CRD CHARGING WATER 3 AT[UNSAT increase.

CRD-56 to limit Reactor Vessel level does not requires closing CRD-56.

Standard: Operator determines RPV water level is 130 operator attempts to determine RPV water level, inform him RPV water level Interim Cue: If inches and stable Reactor Water Cleanup SAT/UNSAT *Step 4: On IAC panel A, open ckt. #4 to isolate behind elevator).

Drain regulator CU-55 (Rx Bldg 252' Standard: Operator opens ckt #4 on IAC panel A the RIGHT in the

  1. 4 on IAC panel A has been moved to Interim Cue: Inform Operator that ckt OPEN position.

SYTEM, position

+*Step 5: At CP-82-2, RHR ALTERNATE SHUTDOWN AT[UNSAT TRANSFER switches o the four RHR ALTERNATE SHUTDOWN EMER in the following sequence:

SS1315A SS1315B S S13 15C SS1315D to EMER in the specified Standard: Operator turns the four emergency switches order.

each Operator the four switches are at the I 1 o'clock position. After repositioning Interim Cue: Inform All of the valve and panel lights are now lit switch several valves lights became lit.

close RECIRC MG Step 6: the Recirc MG foam system has initiated, If SAT/UNSAT the recirc MG foam system).

(at FOAM DELUGE ISOL FP V76-312 system foam status adjacent to Standard: Operator observes the status of the recire system has not initiated.

panel CP-82-2 and determines the foam recirc foam system is as-is.

Interim Cue: Inform Operator that the

JPMSROUPlt2 Rev. 0, 05/02 Page 5 of 9 SAT/UNSAT *Step 7: Open the following ACB:

ISOL. VALVE V10-66 RHR DISCHARGE TO RADWASTE (MCC-8B)

TO RADWASTE ISOL.

Standard: Operator places the V10-66 RHR DISCHARGE position VALVE (MCC-8B) breaker in the OPEN has been moved DOWN to the OPEN position Interim Cue: Inform Operator that the breaker SAT/UNSAT *Step 8: Open the following ACB:

(MCC-8B)

EMERG. INTERTIE VALVE V10-183 V0-183 (MCC-8B)

Standard: Operator places the EMERG. INTERTIE VALVE breaker in the OPEN position has been moved DOWN to the OPEN position interim Cue: Inform Operator that the breaker SAT/UNSAT *Step 9: Open the following ACB:

V2-74, (MCC-8B)

MAIN STEAM DRAIN INBOARD VALVE VALVE (MCC-Standard: Operator places the MAIN STEAM DRAIN INBOARD 7A) breaker in the OPEN position has been moved DOWN to the OPEN position Interim Cue: Inform Operator that the breaker SATJUNSAT *Step 10: Open the following ACB:

CLEANUP RECIRC PUMP P49-1A (MCC-7A)

P49-IA (MCC-7A)

Standard: Operator places the CLEANUP RECIRC PUMP breaker in the OPEN position RWCU Inform Operator that the breaker has been moved DOWN to the OPEN position. One Interim Cue: report breaker is as-is.

pump breaker will be OPEN. For this pump,

JPM-SROUPlt2 Rev. 0, 05/02 Page 6 of 9 SATIUNSAT *Step 11: Open the following ACB:

MAIN STEAM LINE DRAIN VALVE V2-77 (MCC-DC-2A)

V2-77 Standard: Operator places the MAIN STEAM LINE DRAIN VALVE (MCC-DC-2A) breaker in the OPEN position moved DOWN to the OPEN position Interim Cue: Inforrn Operator that the breaker has been SAT/UNSAT *Step 12: Open the following ACB:

(MCC-9B)

CONT. SPRAY OUTBOARD INJECT VALVE V10-26A VALVE Standard: Operator places the CONT. SPRAY OUTBOARD INJECT (MCC-9B) breaker in the OPEN position moved DOWN to the OPEN position Interim Cue: Inform Operator that the breaker has been SAT/UNSAT *Step 13: Open the following ACB:

EMERG. INTERTIE VALVE V1I0184, (MCC-9B) 84, (MCC-9B)

Standard: Operator places the EMERG. INTERTIE VALVE V10-1 breaker in the OPEN position moved DOWN to the OPEN position Interim Cue: Inform Operator that the breaker has been SAT/UNSAT *Step 14: Open the following ACB:

CLEANUP RECIRC PUMP P49-1B (MCC-6A)

(MCC-6A)

Standard: Operator places the CLEANUP RECIRC PUMP P49-lB breaker in the OPEN position DOWN to the OPEN position. One RWCU Interim Cue: Inform Operator that the breaker has been moved is as-is.

pump breaker will be OPEN. For this pump, report breaker

JPM-SROUPlt2 Rev. 0, 05/02 Page 7 of 9 6 AT/UNSAT Step 15: Close/check closed RIR-66 (NE torus catwalk) determine valve is closed.

Standard: Operator checks valve position indication to valve in CLOSE direction.

Operator declutches mechanism and checks in the CW is as-is. No movement in valve when checked Interim Cue: Inform Operator that the valve direction.

level by North SAT/UNSAT Step 16: Close/check closed RHR-V1O-26A (Rx Bldg 252' HCUs) valve is closed. Operator Standard: Operator checks valve position to determine CLOSE direction.

declutches mechanism and checks valve in in the CW is as-is. No movement in valve when checked Interim Cue: Inform Operator that the valve direction.

the following setquence:

AT/UNSAT +*Step 17: Place MCC-89A on the Maintenance Tie in

a. Open FEED FROM UPS 1-A breaker (MCC-89A)

(MCC-89A) in the Standard: Operator places the FEED FROM UPS 1-A breaker OPEN position has been moved DOWN to the OPEN position Interim Cue: Inform Operator that the breaker following sequence:

SAT/UNSAT +*Step 18: Place MCC-89A on the Maintenance Tie in the

b. Close FEED FROM MCC-9B breaker (MCC-89A)

Operator attaches breaker Standard: Operator unlocks and opens door enclosure.

breaker (MCC-89A) in the handle and places the FEED FROM MCC-9B CLOSE position and breaker has Cue: Inform Operator that the door is unlocked and open. Breaker handle is attached Interim been moved to the CLOSE position

JPM-SROUP1t2 Rev. 0, 05/02 Page 8 of 9 SAT/UNSAT Step 19: Notify the Shift Supervisor of completion to this point.

Standard: Contacts the SS and notifies him of his status.

Interim Cue: Inform Operator that the SS acknowledges the report. Informs him another SRO will complete placing RHR in service.

  • Critical Step

+ Sequence Critical Step TIME FINISH:

Terminating Cue: Step 1-9 for Operator #2 are completed in Appendix B of OP 3126 Evaluator Comments:

System 203000 K/A's: K4.14 A4.02 A4.05 System 295016 K/A's: AK2.01 AAl.06 AA2.04 AK2.02

JPM-SROUPlt2 Rev. 0, 05/02 Page 9 of 9 EXAMINEE HANDOUT Initial Conditions:

A fire in the control room has forced the evacuation of the control room. The Initial Actions in the control room from OP 3126, Shutdown Using Alternate Shutdown Methods, have been completed.

Operators 1-4 have been dispatched to complete Appendices A-D in the plant.

Initiating Cues:

You have been directed to complete Appendix B 6f OP 3126 for Operator Q2. You have a portable radio and a set of operator keys.

JPM-SROUSiml Rev. 0, 05/02 Page 1 of 8 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

PAR Based on Plant Conditions (Faulted - Alternate Path)

Reference:

OP 3511 Off-Site Protective Action Recommendations, Rev 11 Task Number: 34470803 AO/ROISRO_ RO/SRO SRO Only X Task Performance:

Sequence Critical: Yes No X Time Critical: Yes No X Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation Performance X Discuss Setting: Classroom _ Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS _ FAIL Time Required:

Prepared by: AZ Operations TIm structor Date

. -, - IL Reviewed by:

eCert fed Reviewer pate SRO Lice Dpate Approved by: Trtnn T,--,;.,;t-.- ;Idriknr Date

JPM-SROUSiml Rev. 0, 05/02 Page 2 of 8 operator being evaluated. Allow

)irections: Discuss the information given on this page with the task. As each time for him to ask questions before beginning performance of the step by circling performance step is performed, evaluate the performance of that If a classification.

either."Sat" or "Unsat". Comments are required for any "Unsat" step is skipped or step is preceded by an asterisk (*), it is a critical step. If a critical Performance Measure.

performed unsatisfactorily, then the operator has failed the Job the task?"

After providing the initiating cue, ask the operator "Do you understand Read to the person being evaluated:

cues and answer any Before starting, I will explain the initial conditions, provide the initiating questions you have.

the actions.

This JPM will be performed in the Simulator and you are to perform you are verifying You are requested to "talk through" the procedure, stating the parameters or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

All ECCS systems A failure to SCRAM and a loss of cooling accident has occurred.

responded as expected.

  • Rx water level is -100"
  • Containment RAD level is 6000 R/hr and increasing.
  • Drywell pressure is 25 psig and steady.
  • Containment isolation valves AC-6 and AC-6A have failed to isolate.
  • Stack high range monitor RM17-155 is alarming.

EOF has not yet been The Shift Supervisor has declared a General Emergency and the manned. A stack release is in progress.

Initiating Cues:

plant conditions per OP 3511.

The PED (Shift Supervisor) directs you make a PAR based on A second individual is not available to independently verify the PAR.

Task Standards:

PAR and VYOPF 3511.01 complete.

JPM-SROUSiml Rev. 0, 05/02 Page 3 of 8 required Materials:

OP 351 1, VYOPF 3511.01 OP 3513 Appendix I Simulator Setup:

Rad High >6000 R AC-6 and AC-6A open CRP 9-48 Backup Met Instrumentation OFF

JPM-SROUSim1 Rev. 0, 05/02 Page 4 of 8 Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure OP 3511, Section 1 and review precautions.

Standard: Operator obtains and reviews procedure.

SATIUNSAT Step 2: Use Figure 1and Table 3 to determine the appropriate Protective Action Recommendation (PAR) based on plant conditions Standard: Operator obtains Figure 1 of OP 3511.

release, SAT/UNSAT Step 3: If the actual or potential release pathway is a stack 3513.

use the upper wind direction using Appendix I of OP Standard: Operator obtains Appendix I of OP 3513 to determining upper wind direction NOTE: STEPS 4-8 are from OP 3513 Appendix I by SAT/UNSAT Step 4: Access MET DATA HISTORY-1 display on ERFIS monitor MHI poke depressing the "ODPS" key and then selecting the box.

Standard: Operator selects MET DATA HISTORY-1.

data is all purple.

Interim Cue:

Cue: DATA HISTORY-1 MET DATA MET HISTORY-I data is all purple.

JPM-SROUSim1 Rev. 0, 05/02 Page 5 of 8 Evaluation Performance Steps not SAT/UNSAT Step 5: If the primary meteorological tower instrumentation is data functioning, but ERFIS is operable obtain meteorological from the secondary tower. Access MET DATA HISTORY-2 keV display on the ERFIS monitor by depressing the "ODPS" and then selecting the MH2 poke box.

Standard: Operator selects MET DATA HISTORY-2.

Interim Cue: MET DATA HISTORY-2 data is all purple.

SAT/UNSAT Step 6: If the primary meteorological tower instrumentation is functioning, but the MET DATA HISTORY-1 display on ERFIS monitor is unavailable, determine the required meteorological data from the video graphic recorder in the Relay House.

Standard: Sends operator to Relay House to obtain wind direction from video graphic recorder.

Interim Cue: Operator from the Relay House reports the recorder is not functioning.

SATIUNSAT Step 7: If the primary meteorological tower instrumentation is not functioning, and the MET DATA HISTORY-1 and MET DATA HISTORY-2 displays on ERFIS monitor are not available, obtain readouts of wind speed, wind direction, ambient temperature, and one value of delta T from the secondary (backup) tower from CRP 9-48.

Standard: Attempts to obtain wind direction from CRP 948 instrumentation.

Interim Cue: If operator attempts to turn on monitor, inform monitor fails to energize.

JPM-SROUSiml Rev. 0, 05/02 Page 6 of 8 valuation Performance Steps SATIUNSAT *Step 8: If the primary and secondary meteorological tower instrumentation is not available, consult Albany National 7

or Weather Service Station (Tel. No.'s 800-833-9880 [Primaryl 518-435-9574 [Backupl, and ask for "Public Forecaster")

regarding meteorological observations.

Standard: Contacts Albany National Weather Service Station by telephone to obtain wind direction.

direction is from Interim Cue: When operator begins to dial the phone, provide him a wind 100°.

SATIUNSAT *Step 9: Determine from initial conditions that substantial core damage is in progress.

Standard: Operator answers YES to "substantial core damage" decision block on Figure 1 of OP 3511 due to containment rads >5000 RIHr.

has SAT/UNSAT *Step 10: Determine from initial conditions that containment failure occurred and a release is underway.

Standard: Operator answers YES to "containment failure projected or due to release underway" decision block on Figure 1 of OP 3511 AC-6 and 6a failure to close.

SAT/UNSAT *Step 11: Determine that a puff release is not underway.

Standard: Operator answers NO to "is a puff release underway?" decision block on Figure 1 of OP 3511.

Any SATIUNSAT *Step 12: Determine PAR of evacuation for Vernon, Hinsdale and towns 5 miles downwind (Refer to Table 3 of OP 35111).

Standard: Using Table 3 determines Sector E (Vernon, Hinsdale, Brattleboro, Guilford, and Bernardston) are towns affected.

JPM-SROUSim1 Rev. 0, 05/02 Page 7 of 8 ialuation Performance Steps SAT/UNSAT *Step 13: Complete VYOPF 3511.01. Section l: Plant Conditions.

Standard: Completes VYOPF 3511.01 Section l: Plant Conditions by designating Vernon, Hinsdale, Brattleboro, Guilford, and Bernardston should be Evacuated.

SATIUNSAT Step 14: Review PAR with SS (Senior Manager in charge) to obtain approval.

Standard: Operator requests approval of PAR from Shift Supervisor.

Interim Cue: The Shift Supervisor states that he will complete the remainder of the procedure.

TIME FINISH:

Terminating Cue: Operator completes PAR per VYOPF 3511.01.

Evaluators Comments:

System: K/A's:

272000 K1.03 K1.17 A2.01 A4.04 A4.05 295038 EK2.05 E K2.08 EK3.01 EA1.01 EA1.02 EA1.04 EA2.01 EA2.04 System Generic K/A's: 2.4.38 2.4.44

JPM-SROUSim1 Rev. 0, 05/02 Page 8 of 8

-xaminee Handout Initial Conditions:.

A failure to SCRAM and a loss of cooling accident has occurred. All ECCS systems responded as expected.

  • Rx water level is -10"
  • Containment RAD level is 6000 R/hr and increasing.
  • Drywell pressure is 25 psig and steady.
  • Containment isolation valves AC-6 and AC-6A have failed to isolate.
  • Stack high range monitor RM17-155 is alarming.

The Shift Supervisor has declared a General Emergency and the EOF has not yet been manned. A stack release is in progress.

Initiating Cues:

The PED (Shift Supervisor) directs you make a PAR based on plant conditions per OP 3511.

A second individual is not available to independently verify the PAR.

JPM-SROUSim2 Rev. 0, 05/02 Page 1 of 8 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Initiate SLC (Faulted - Alternate Path)

Reference:

OP 2114, Standby Liquid Control System Task Number: 2110050101 Task Performance: AO/RO/SRO RO/SRO X SRO Only Sequence Critical: Yes _ No X Time Critical: Yes No X Operator Performing Task:_

Examiner:

Date of Evaluation:_

Activity Code:_

Method of Testing: Simulation Performance X Discuss Setting: Classroom Simulator X Plant Performance Expected Completion Time: 7 minutes Evaluation Results:

Performance: PASS FAIL _ Time Required:-

Prepared by: 7/:a e Operations Traning Instructor ate Reviewed by: q SRO Licensed/C rtifled O r Approved by: 3) 7/ae

/Date Oper onsrainin pervisor

JPM-SROUSim2 Rev. 0, 05/02 Page 2 of 8 Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant has experienced an ATWS and the torus temperature is approaching 110WF.

Initiating Cues:

You are directed to initiate SLC System 2 to inject boron into the reactor vessel.

Task Standards:

Boron injected in to the vessel IAW EOP-2, using OP 2114, Appendix B.

Required Materials:

EOP-2 ATWS RPV Control OP 2114, Operation of Standby Liquid Control System Simulator Setup: Pre-insert Malf: SL01 A - SLC "A" Pump Trip SL02B - SLC "B" Squib Valve Failure

JPM-SROUSim2 Rev. 0, 05/02 Page 3 of 8 Evaluation Performance Steps TIME START:_

SAT/UNSAT Ltt2LLI

--It" I -

I . Obtain Procedure, Review Admin. Limits, Precautions and Prerequisites Standard: OP 2114 Appendix B obtained Comment: Procedure is located at CRP 9-5 Interim Cue: If asked, all prerequisites are satisfied.

SAT/UNSAT *Step 2: Unlock SILC switch (Keylock) by positioning key to the two o'clock position.

Standard: Keylock turned to two o'clock position SAT/UNSAT Sten 3: Turn Kev-Lock Switch to SYS 2 Standard: Switch turned to SYS 2, located on CRP 9-5 horizontal panel upper left corner.

SAT/UNSAT Step 4:. Verify SLC PUMP A P-45-1B starts Standard: Observes SLC pump B red light on, CRP 9-5 SAT/UNSAT Step 5: Verify RWCU system isolation valves automatically close:

Outlet Isolation, CU-1 5; Inlet Isolation. CU-1 8; Return Isolatoin CU-68 Standard: Observes RCU-15, -18, -68 closed on CRP 9-4 green light ON and red light OFF

JPM-SROUSim2 Rev. 0, 05/02 Page 4 of 8 Evaluation Performance Steps SAT/UNSAT Step 6: Squib valve SLC-14B fires, as indicated by Amber SQUIB VALVE READY light goes out, and annunciator 5-A-1 SLC SQUIB VLV CONTINUITY LOSS alarms.

Standard: 1. Observes amber light goes out for "B" valve on CRP 9-5 vertical panel. Amber light will come on when SYS switch returned to neutral position.

2. Observes "SQB VLV CON LOSS" annunciator 5-A-1 failed to alarm SAT/UNSAT Step 7: Verify SLC DISCH PRESSURE P1-1 1-65 increases.

Standard: Observes discharge pressure on P1-1 1-65 cycling at relief setpoint, indicating failure of squib valve.

SAT/UNSAT Step 8: Verify Red FLOW indicator light on Standard: Observes Red FLOW indicator light is OFF SAT/UNSAT Step 9: Verify SLC TANK LEVEL LI 11-66 (CRP 9-5) decreases Standard: Observes tank level unchanged SAT/UNSAT *Step 10: If the above actions did not result in SLC injection, then turn the SLC switch (keylock) to the other position SYS 1 and repeat verification of Step 3.

Standard: Switch turned to SYS 1, located on CRP 9-5 horizontal panel upper left corner SAT/UNSAT Step 11: Verify SLC PUMP A P-45-1A starts Standard: Observes SLC pump A red light off, CRP 9-5

JPM-SROUSim2 Rev. 0, 05/02 Page 5 of 8 Evaluation Performance Steps SAT/UNSAT Step 12: Verif RWCU system isolation valves automatically close Outlet Isolation, cu-i5; Inlet Isolation, cu-i8: Return Isolatoin CU-68 Standard: Observes RCU-15, -18, -68 closed on CRP 9-4 green light ON and red light OFF SAT/UNSAT Step 13: Squib valve SLC-14A fires, as indicated by Amber SQUIB VALVE READY light goes out, and annunciator 5-A-1 SLC SQUIB VLV CONTINUITY LOSS alarms.

Standard: 1. Observes amber light goes out for "A" valve on CRP 9-5 vertical panel

2. Observes "SQB VLV CON LOSS" alarm annunciator 5-A-1 SAT/UNSAT Step 14: Verify SLC DISCH PRESSURE P-11-65 increases.

Standard: Observes zero pressure on PI-1 1-65 SAT/UNSAT Step 15: Verify Red FLOW indicator light on Standard: Observes Red FLOW indicator light is off SAT/UNSAT *Step 16: If Step 4 did not result in SLC injection, turn the SLC switch back to the initially selected system and repeat verification of Step 3.

Standard: Switch turned to SYS 2, located on CRP 9-5 horizontal panel upper left corner SAT/UNSAT Step 17: Verify SLC PUMP A P-45-1B starts Standard: Observes SLC pump B red light on, CRP 9-5

JPM-SROUSim2 Rev. 0, 05/02 Page 6 of 8 Evaluation Performance Steps SAT/U NSAT Step 18: Verify RWCU system isolation valves automatically close:

Outlet Isolation, CU-15; Inlet Isolation, CU-18; Return Isolatoin CU-68 Standard: Observes RCU-15, -18, -68 closed on CRP 9-4 green light ON and red light OFF SAT/UNSAT Step 19: Squib valve SLC-14A fires, as indicated by Amber SQUIB VALVE READY light goes out, and annunciator 5-A-1 SLC SQUIB VLV CONTINUITY LOSS alarms.

Standard: 1. Observes amber light goes out for "A" valve on CRP 9-5 vertical panel

2. Observes "SQB VLV CON LOSS" alarm annunciator 5-A-1 SAT/UNSAT Step 20: Verify SLC DISCH PRESSURE P1-11-65 increases.

Standard: Observes pressure increase on P1-1 1-65 SAT/UNSAT Step 21: Verify Red FLOW indicator light on Standard: Observes Red FLOW indicator light is ON SAT/U NSAT Step 22: Verify SLC Tank Level Decreases Standard: Operator indicates he will be checking for storage tank level indicator decreasing LI-1 1-66 Comment: Level decrease is not expected immediately SAT/UNSAT Step 23: Monitor Power Level Standard: Operator indicates he will check Rx power decreasing on APRM recorders on CRP 9-5 TIME FINISH:

JPM-SRO USim2 Rev. 0, 05/02 Page 7 of 8 Terminating Cue: Boron injected into the vessel IAW EOP-2, using OP 2114 Appendix B

Evaluators Comments:

System: 211000 K/A's:K1.05 K1.06 K2.01 K2.02 K4.04 K4.07 K4.08 K5.04 A1.02 A1.04 A1.06 A1.08 A1.09 A1.10 A2.02 A2.04 A3.01 A3.03 A3.05 A3.06 A3.07 A3.08 A4.02 A4.03 A4.05 A4.06 A4.07 A4.08

JPM-SROUSim2 Rev. 0, 05/02 Page 8 of 8 Examinee Handout Initial Conditions:

The plant has experienced an ATWS and the torus temperature is approaching 1 100 F.

Initiating Cues:

You are directed to initiate SLC System 2 to inject boron into the reactor vessel.

JPM-SROUSim3 Rev. 0, 05/02 Page 1 of 8 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Perform MSIV Partial Closure Testing of MSIV-86A

Reference:

OP 4113, Main and Auxiliary Steam System Surveillance Task Number: 2397030201 RO!SRO X SRO Only Task Performance: AO/RO!SRO Sequence Critical: Yes _ No X Time Critical: Yes No X Operator Performing Task:_

Examiner:

Date of Evaluation:_

Activity Code:_

Performance X Discuss Method of Testing: Simulation _

Setting: Classroom _ Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS _ FAIL Time Required:_

Prepared by: __ _ _ _ _ _ _

Oper raining Instructor Date Reviewed by: Date SRO Licensed! rtife Reviewer

\pproved by: I-'.- o i r nniinprviqnr

_______________}

Date

JPM-SROUSim3 Rev. 0, 05/02 Page 2 of 8 evaluated.

Directions: Discuss the information given on this page with the operator being of the task. As Allow time for him to ask questions before beginning performance that step by each performance step is performed, evaluate the performance of circling either "Sat" or "Unsat". Comments are required for any "Unsat" step. If a classification. If a step is preceded by an asterisk (*), it is a critical has failed critical step is skipped or performed unsatisfactorily, then the operator the Job Performance Measure.

the task?"

After providing the initiating cue, ask the operator "Do you understand Read to the person being evaluated:

cues and answer Before starting, I will explain the initial conditions, provide the initiating any questions you have.

the actions.

This JPM will be performed in the Simulator and you are to perform you are You are requested to "talk through" the procedure, stating the parameters verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is at power during normal operation.

Initiating Cues:

been directed to I&C recently completed work on MS-86A. As part of PMT, you have on MS-86A IAW OP perform the MSIV partial closure RPS relay actuation functional test back panel actions.

4113. Other operators are available to assist in the performance of Task Standards:

MSIV partial closure test performed IAW OP 4113.

Required Materials:

OP 4113, Main and Auxiliary Steam System Surveillance VYOPF 4113.03 Simulator Set-Up:

Any at power IC with MSIVs OPEN.

JPM-SROUSim3 Rev. 0, 05/02 Page 3 of 8 Evaluation Performance Steps TIME START:_

Limits, Precautions SAT/UNSAT Step 1: Obtain Procedure. Review Administrative and Prereauisites limits, Standard: OP 4113, section B, obtained, administrative precautions and prerequisites reviewed with prerequisites are met. If asked supply operator Interim Cue: If asked, inform operator that VYOPF 4113.03.

to perform the SAT/UNSAT Step 2: Obtain permission from the Shift Supervisor test test Standard: Obtains permission from SS to perform the the test.

Interim Cue: SS grants permission to perform SAT/UNSAT Step 3: Record reactor power Standard: Records reactor power on VYOPF 4113.03

JPM-SROUSim3 Rev. 0, 05/02 Page 4 of 8 Evaluation Performance Steps SAT/UNSAT Step 4: Verify that RPS has recognized the MSIVs are open by observing the following relays energized (contacts closed):

CRP 9-15 CRP 9-17 Relay Relay Valve No.

5A-K3A 5A-K3B MS-80A or 86A 5A-K3E 5A-K3D MS-80B or 86B 5A-K3C 5A-K3F MS-80C or 86C 5A-K3G 5A-K3H MS-80D or 86D Standard: Locates and observes relays are energized on CRP 9-1 5/9-1 7 panels Interim Cue: For each relay observed, indicate contact is as-pictured SAT/UNSAT Step 5: Station an operator at the RPS Panels to observe the RPS relays Standard: Station an operator at the RPS panels Interim Cue: An operator is stationed at the RPS panels.

SAT/UNSAT Step 6: Continuously monitor individual steam line flow, (Fl 6-88AIBICID)

Standard: Direct 9-5 operator to continuously monitor steam line flow during testing Interim Cue: The 9-5 operator is monitoring individual steam line flows.

JPM-SROUSim3 Rev. 0, 05/02 Page 5 of 8 Evaluation Performance Steps notify operators at SATIUNSAT Step 7: Determine which valve will be tested and RPS Panel and CRP 9-5 MS-86A will be tested Standard: Inform operators at RPS and 9-5 that report Interim Cue: Operators acknowledge the

  • Step 8: Depress and hold the test pushbutton for MS-86A SAT/UNSAT on CRP 9-3.

Standard: Depress and hold MS-86A pushbutton Step 9: Note that the green indicating light comes on SAT/UNSAT comes ON Standard: Observes MS-86A green indicating light depressed until the

  • Step 10: Continue to hold the test pushbutton SAT/UNSAT the MSIV closure as operator reports that RPS has recognized (contacts indicated by the appropriate relays deenergizing opening)

CRP 9-15 CRP 9-17 Relay Valve No.

Relay 5A-K3B MS-80A or 86A 5A-K3A until RPS panel Standard: Operator maintains pushbutton depressed operator provides report on RPS relays 5A-K3B are open and deenergized Interim Cue: RPS operator reports Relays 5A-K3A and Step 11: Release the test Pushbutton and verify that the MSIV returns SAT/UNSAT light energized) to the full open position (only red indicating MS-86A green Standard: Releases test pushbutton and observe indicating light goes out and red light on.

JPM-SROUSim 3 Rev. 0, 05/02 Page 6 of 8 Evaluation Performance Steps is open by SAT/UNSAT Step 12: Verify the RPS has recognized that the MSIV (contacts closed) observing the appropriate relays energized CRP 9-15 CRP 9-17 Relay Valve No.

Relay 5A-K3A 5A-K3B MS-80A or 86A Standard: Obtains report on relays from RPS Panel operator are closed and energized Interim Cue: RPS operator reports Relays 5A-K3A and 5A-K3B SAT/UNSAT Step 13: Record results on VYOPF 41 13.03 Standard: Operator logs results on VYOPF 4113.03 for MS-86A the Shift SAT/UNSAT Step 14: When valve testing is complete route form to Supervisor.

Standard: Routes form to the SS for review TIME FINISH:__

3 JPM-SROUSim Rev. 0, 05/02 Page 7 of 8 IAW OP 4113 for MS-86A.

Terminating Cue: MSIV partial closure test performed Evaluators Comments:

K1.01 K3.09 K4.02 System: 223002 K/A's: A2.08 A3.01 A1.01

JPM-SROUSim3 Rev. 0, 05/02 Page 8 of 8 Examinee Handout:

Initial Conditions: The plant is at power during normal operation.

Initiating Cues: I&C recently completed work on MS-86A. As part of PMT, you have been directed to perform the MSIV partial closure RPS relay actuation functional test on MS-86A lAW OP 4113. Other operators are available to assist in the performance of back panel actions.

FUNCTIONAL TEST CLOSURE RPS RELAY ACTUATION MSIV PARTIAL OZ- Date________

,quency: N/A WO #

Proc.

Step No.

2. Reactor Power Level_

Results of Test 3.-6.

ST estUJA SA Noi a Test Method Guidelines NValve ber Po.

when pushbutton depressed. N11 Green colored light energized 11r I MS-BOA MS6 l

~

0 Relays K3A and K3Bde-energized and energized (contacts closed)

Green colored light (contacts opened) on valve closure when valve reOpenS.

energized when pushbutton Relays K3A and K3B de-energized (contacts depressed.

opened) on valve closure l M-86A 0 closed) when valve re-opens.

and energized (contacts when pushbutton depressed. t4 Green colored light energized closure t\

(contacts opened) on valve a Relays K3D and K3E de-energized re-opens..

closed) when valve lMSBO0B and energized (contacts energized when pushbutton depressed. t!

Green colored light de-energized (contacts opened) on valve closure l

lB MS-86B 0 Relays K30 and K3E closed) when valve re-opens.

and energized (contacts pushbutton depressed. 1! 1 light energized when (contacts opened) on valve closure areen eneored Relays K3C and K3F de-energized when valve re-opens.

Ms-80C 0 and energized (contacts closed)

Green colored light energized when pushbutton depressed.

on valve closure 4

I

( Nf Relays K3C and de-energized (contacts opened)

F3H MS-86c 0 valve re-opens.

when (contacts closed) (

and energized when pushbutton depressed. closure I b t4 /

colored light energized (contacts opened) on valve MS-80 0 Relays K3G and K3H de-energized when valve re-opens.l Green closed) and energized (contacts Ms-860~~~~c 0arenctrd l3 &-htenergized~e (contacts openedX) on valve closure lQ closed) when valve re-opens.I enegized (contacts l arid l Acceptance Criteria RPS relay operated satisfactorily.

1. For each valve tested the i I Test Conducted By Time Date Reviewed By Shift Supervisor Date VYOPF 4113.03 OP 4113 Rev. 23 Page 1 of '1 84 RT No. 08.T03.1