Text
"& Pft REG, UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 Joseph E. Venable Vice President Operations Waterford 3 Entergy Operations, Inc.
17265 River Road Killona, Louisiana 70066-0751
SUBJECT:
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN WATERFORD 3
Dear Mr. Venable:
On July 31, 2002, the NRC staff completed its midcycle plant performance assessment of Waterford 3. In accordance with NRC Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," the midcycle review involved the participation of all technical divisions in evaluating the performance of your Waterford 3 facility for the first half of the current assessment cycle, January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.
The enclosed inspection plan details the inspections scheduled through September 30, 2003.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agency's Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
Entergy Operations, Inc.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817/860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely William B. Jones, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38
Enclosure:
Waterford 3 Inspection/Activity Plan cc:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, Louisiana 70066-0751 Entergy Operations, Inc.
Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, Louisiana 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, Louisiana 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, Louisiana 70066-0751 Michael E. Henry, Administrator and State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502 Mr. Nickie Monica, President St. John the Baptist Parish 1801 W. Airline Hwy LaPlace, Louisiana 70068 Federal Emergency Management Agency Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Entergy Operations, Inc.
-4 Col. Michael A. Brown Assistant Director Military Department Office of Emergency Preparedness 7667 Independence Blvd.
Baton Rouge, Louisiana 70806 Albert D. Laque, Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057
Entergy Operations, Inc.
-4 Albert D. Laque, Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057
Entergy Operations, Inc.
Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (KEB)
DRS Director (EEC)
Senior Resident Inspector (TRF)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (JSD)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
RidsNrrDipmlipb B. Henderson, PAO (BWH)
W. A. Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (GMG, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)
R. W. Borchardt, Associate Dir. for Inspection and Programs (RWBI)
B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
J. Shea, Chief, Regional Operations Staff, OEDO (JWSI)
W. Ruland, NRR Project Director (WHR)
R. Gramm, Chief, Section 1, NRR/DLPM (RAG)
N. Kalyanam, NRR Project Manager (NXK)
Hard Copy:
Records Center, INPO S:\\DRP\\DRPDIR\\Midcycle 2002\\WAT.wpd WBone,-; f EEg I ns, KEBroc 4n WB~ns 18/ 4/0:2' 18/
/02 88/025702~
iiIII~ E_=l:-mail r=rax OFFICIAL RECORD COPY T=lIelepnone
Waterford Page 1 of 2 Wateo rd 08/12/2002 08:57:55 Inspection,/Activity Plan Report 22 08/18/2002 - 09/30/2003 UNo.
of Staff Planned Dates Ins ection Activitype PSB-EP1
- EP PROGRAM BASELINE INSPECTION 08/19/2002 08/22/2002 Basele inspections 3
IP 7111402 Alert and Notification System Testing 08/19/2002 08/22/2002 Baseline Inspections 3
IP 7111403 Emergency Response Organization Augmentation Testing 08/19/2002 08/22/2002 Baseline Inspections 3
IP 7111404 Emergency Action Level and Emergency Plan Changes 08/19/2002 08/22/2002 Baseline Inspections 3
IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/19/2002 08/22/2002 Baseline Inspections 3
IP 71151 Performance Indicator Verification 08/19/2002 08/22/2002 Baseline Inspections 160
- PI & R INSPECTION 1
3 IP 71152 Identification and Resolution of Problems 12/02/2002 12/27/2002 Baseline Inspections PBE-PIR
IP 71152B Identification and Resolution of Problems 12/09/2002 12/20/2002 Baseline Inspections EMB
- BIENNIAL MR INSPECTION 1
3 IP 7111112B Maintenance Effectiveness 01/13/2003 01/17/2003 Baseline Inspections PSB-S1
- AACCESS AUTH/CONTROL, SEC PLAN, PIV 1
3 IP 7113001 Access Authorization Program (Behavior Observation Only) 02/10/2003 02/14/2003 Baseline Inspections 3
IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizat 02/10/2003 02/14/2003 Baseline Inspections 3
IP 7113004 Security Plan Changes 02/10/2003 02/14/2003 Baseline Inspections 3
IP 71151 Performance Indicator Verification 02/10/2003 02/14/2003 Baseline Inspections EMB
- SSD&PCI 5
3 IP 7111121 Safety System Design and Performance Capability 03/31/2003 04/104/2003 Baseline Inspections 3
IP 7111121 Safety System Design and Performance Capability 04/14/2003 04/18/2003 BaselineInspections EMB
- 50.59 1
IP 7111102 Evaluation of Changes, Tests, or Experiments 03/31/2003 04/04/2003 Baseline Inspections RP-TM
- RAD SAFETY TEAM 4
3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/21/2003 04/25/2003 Baseline Inspection 3
IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/21/2003 04/25/2003 Baseline Inspection, 3
IP 7112202 Radioactive Material Processing and Transportation 04/21/2003 04/25/2003 Baseline Inspection 3
IP 7112203 Radiological Environmental Monitoring Program 04/21/2003 04/25/2003 Baseline Inspection PSB-EP1
- EP EXERCISE BASELINE INSPECTION 2
3 IP 7111401 Exercise Evaluation 07/30/2003 07/31/2003 Baseline Inspection 3
IP 7111404 Emergency Action Level and Emergency Plan Changes 07/30/2003 07/31/2003 Baseline Inspection 3
IP 71151 Performance Indicator Verification 07/30/2003 07/31/2003 Baseline Inspection OB-IN
- INITIAL EXAM PREP 1
3 X02246 WATERFORD - INITIAL EXAM (08/03) 08/04/2003 08/08/2003 Not Applicable s
S S
S S
'5 1S
""'*-"*NP and OUTAGE activities.
This report does not inclndO ectivi es Thsreport shows only on-sitezhsand announced inspection procedures.
S
Page 2 of 2 08/12/2002 08:57:55 Report 22 Waterford Inspection / Activity Plan 08/18/2002 - 09/30/2003 ber ! [Insp ection Activit EMB
- TRIENNIAL FIRE PROTECTION 3
IP 7111105T Fire Protection 3
IP 7111105T Fire Protection OB-IN
- INITIAL EXAMS 3
X02246 WATERFORD - INITIAL EXAM (08/03)
OB-RQ
- REQUAL INSPECTION 3
IP 7111111B Licensed Operator Requalification
[No. of Staff Planned Dates inspection te Start End Type Title 5
08/11/2003 08/15/2003 Baseline Inspections 08/25/2003 08/29/2003 Baseline Inspections 4
08/25/2003 08/29/2003 Not Applicable 2
09/15/2003 09/19/2003 Baseline Inspections This report does not Include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
I Unit ",
SNun p
his rep rt does not Include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.