7/31/02 - Midcycle Performance Review and Inspection Plan - Arkansas Nuclear One, Units 1 & 2
ML022400784
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/26/2002
From: Laura Smith
NRC/RGN-IV/DRP/RPB-D
To: Anderson C
Entergy Operations
References
Download: ML022400784 (7)


Text

÷* 0 "0

sUNITED STATES NUCLEAR REGULATORY COMMISSION U)

,REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 AUG 2 6 2002 Craig G. Anderson, Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN ARKANSAS NUCLEAR ONE, UNITS 1 & 2

Dear Mr. Anderson:

On July 31, 2002, the NRC staff completed its midcycle plant performance assessment of Arkansas Nuclear One (ANO). In accordance with NRC Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," the midcycle review involved the participation of all technical divisions in evaluating the performance of your ANO facility for the first half of the current assessment cycle, January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to only conduct baseline and safety issues inspections at your facility through September 30, 2003.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agency's Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

Entergy Operations, Inc.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.govlreading-rmladams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817/860-8137 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Linda Joy Smith, Chief Project Branch D Division of Reactor Projects Dockets: 50-313 50-369 Licenses: DRP-51 NPF-6

Enclosure:

Arkansas Nuclear One Inspection/Activity Plan cc w/enclosure:

Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Entergy Operations, Inc.

County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Bernard Bevill Radiation Control Team Leader Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Mike Schoppman Framatome ANP, Inc.

Suite 705 1911 North Fort Myer Drive Rosslyn, Virginia 22209 Dewey Traylor OES Coordinator Pope County No. 4 Emergency Lane Russellville, Arkansas 72801 Charlie Smith ES Coordinator Yell County Courthouse Union Street Dardanelle, Arkansas 72834 Fred Taylor ES Coordinator Johnson County OES P.O. Box 546 Clarksville, Arkansas 72830 Don Fairbanks ES Coordinator Logan County OES Logan County Courthouse Paris, Arkansas 72855 Entergy Operations, Inc.

Steve Pfeifer, Mayor City of Danville P.O. Box 69 Danville, Arkansas 72833 Jim Clay, Mayor City of Paris P.O. Box 271 Paris, Arkansas 72855 Charles Callahan, Mayor City of Clarksville 205 Walnut Street Clarksville, Arkansas 72830-3005 Carolyn McGee, Mayor City of Dardanelle P.O. Box 360 Dardanelle, Arkansas 72834 Johnny Waldo, Mayor City of Dover P.O. Box 258 Dover, Arkansas 72837 Jerry Don Barrett, Mayor City of Atkins P.O. Box 128 Atkins, Arkansas 72823 Raye Turner, Mayor City of Russellville P.O. Box 428 Russellville, Arkansas 72811 Edwin Price, Mayor City of London P.O. Box 130 London, Arkansas 72847 Stewart Nelson, Mayor City of Morrilton City Hall P.O. Box 583 Morrilton, Arkansas 72110 Entergy Operations, Inc.

Jimmy L. Witt, Judge Yell County Danville Courthouse P.O. Box 219 Danville, Arkansas 72833 Jimmy Hart, County Judge Conway County Courthouse 117 South Moose, Room 203 Morrilton, Arkansas 72110 Mike Jacobs, County Judge Johnson County Courthouse P.O. Box 278 Clarksville, Arkansas 72830 Edward Holt, County Judge Logan County Courthouse Room 22 Paris, Arkansas 72855 Federal Emergency Management Agency Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Jim Ed Gibson, County Judge Pope County Courthouse 100 West Main Street Russellville, AR 72801 Entergy Operations, Inc.

Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (KEB)

DRS Director (EEC)

Senior Resident Inspector (RLB3)

Branch Chief, DRP/D (LJS)

Senior Project Engineer, DRP/D (ELCI)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Scott Morris (SAM 1)

ANO Site Secretary (VLH)

RidsNrrDipmlipb Dale Thatcher (DFT)

B. Henderson, PAO (BWH)

W. A. Maier, RSLO (WAM)

C. J. Gordon (CJG)

DRS Branch Chiefs (GMG, ATG, CSM)

W. D. Travers, EDO (WDT)

C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)

R. K. Frahm, PPR Program Manager, NRRIDIPM/IIPB (RKF)

R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)

B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

J. Shea, Chief, Regional Operations Staff, OEDO (JWSI)

W. Ruland, NRR Project Director (WHR)

R. Gramm, Chief, Section 1, NRR/DLPM (RAG)

C. Nolan, NRR Project Manager (MCN)

T. Alexion, NRR Project Manager (TWA)

Hard copy:

Records Center, INPO S:\\DRP\\DRPDIR\\Midcycle 2002\\ANO.wpd LJSmith;tbh EEqns KEBrockman LJSmith i2 8/0\\ /02 U/2 8U/02 8I8/7/02 OFFCIL ECODiOP'-=

Ieipfon i==b-mail r.=rax OFFICIAL RECORD COPY l=lelephone

Arkansas Nuclear One Inspection / Activity Plan 08/18/2002 - 09/30/2003 Page 1 of 1 08/13/2002 Report 22 Unit Number No. of Staff... Planned Dates Inspection

[ on Site Start End Type OB-IN

- INITIAL EXAM - ANO 1 X02224 ANO-UNIT 1 INITIAL EXAM (08/02)

EMB

- BIENNIAL MR INSPECTION 1

1 IP 7111112B Maintenance Effectiveness PSB-S2

- RESP CONT EVENTS - ENHANCED T/T 2

1,2 FP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy EMB

- ISI & TI 2515/145 UNIT 1 1

1 IP 2515/145 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2 1

IP 7111108 Inservice Inspection Activities ALARA2

- ALARA PLANNING AND CONTROLS 1

1,2 IP 7112102 ALARA Planning and Controls ACCESSPI - ACRSA/PI 1

1,2 IP 7112101 Access Control to Radiologically Significant Areas 1,2 IP 71151 Performance Indicator Verification PSB-EP1

- EP PROGRAM BASELINE INSPECTION 1

1,2 IP 7111402 Alert and Notification System Testing 1,2 IP 7111403 Emergency Response Organization Augmentation Testing 1,2 IP 7111404 Emergency Action Level and Emergency Plan Changes 1,2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2 IP 71151 Performance Indicator Verification OB-IN

- INITIAL EXAM PREP 1

2 X02248 ANO - UNIT 2 EXAM (07/03)

EMB

-SSD&PCI 5

1,2 IP 7111121 Safety System Design and Performance Capability 1,2 IP 7111121 Safety System Design and Performance Capability EMB

-50.59 1

1,2 IP 7111102 Evaluation of Changes, Tests, or Experiments OB-IN

- INITIAL EXAM 4

2 X02248 ANO - UNIT 2 EXAM (07/03)

EMB

- HEAT SINK 1

1,2 IP 7111107B Heat Sink Performance ALARA3

- ALARA PLANNING AND CONTROLS 1

1,2 IP 7112102 ALARA Planning and Controls EMB

- ISI & SG INSPECTIONS U2 1

2 IP 7111108 Inservice Inspection Activities This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced Inspection procedures.

08/19/2002 08/23/2002 Not Applicable 09/09/2002 09/09/2002 10/30/2002 10/30/2002 01/27/2003 04/14/2003 04/14/2003 04/28/2003 04/28/2003 04/28/2003 04/28/2003 04/28/2003 06/23/2003 07/14/2003 07/28/2003 07/14/2003 07/14/2003 08/11/2003 09/22/2003 09/29/2003 09/13/2002 09/13/2002 11/06/2002 11/06/2002 01/31/2003 04/18/2003 04/18/2003 05/02/2003 05/02/2003 05/02/2003 05/02/2003 05/02/2003 06/27/2003 07/18/2003 08/01/2003 07/18/2003 07/18/2003 08/15/2003 09/26/2003 10/03/2003 Baseline Inspections Baseline Inspections Safety Issues Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Not Applicable Baseline Inspections Baseline Inspections Baseline Inspections Not Applicable Baseline Inspections Baseline Inspections Baseline Inspections 14:54:24 Title Ilnspection Activity hI 1