CP & L and Flordia Power, Semiannual 10CFR 26 Fitness for Duty Program Data
ML022400479
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 08/19/2002
From: Morton T
Carolina Power & Light Co, Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PE&RAS-02-073
Download: ML022400479 (13)


Text

10 CFR 26.71 (d)

SCP&L r Florida Power Company AProgress Energy Company A Progress Energy PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-02-073 August 19, 2002 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA

- ---- Ladies and Gentlemen:

In accordance with 10 CFR 26.71(d), enclosed is Carolina Power & Light (CP&L) Company's and Florida Power Corporation's (FPC) semiannual Fitness For Duty (FFD) Program performance data for the above listed plants.

The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period January 1, 2002 through June 30, 2002.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sincerelv.

Terry C. Morton Manager - Performance Evaluation & Regulatory Affairs DSL Enclosure c: L. A. Reyes, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 B. L. Mozafari, NRR Project Manager - BSEP, Unit Nos. 1 and 2, and CR-3 USNRC Resident Inspector - CR-3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 R. Subbaratnam, NRR Project Manager - HBRSEP, Unit No. 2, and SHNPP, Unit No. 1 J. Sanford, North Carolina Utilities Commission

Fitness For Duty Program (January 1, 2002 - June 30, 2002)

PERFORMANCE DATA

SUMMARY

OF MANAGEMENT ACTIONS Lessons Learned and Actions Taken Blind Sample Submittal Rate During the self-assessment of the Fitness For Duty (FFD) Program in April 2002, the assessor identified that the blind submittal rate for the third quarter of 2001 did not meet the rate specified in 10CFR26, which requires a 10% blind submittal rate per quarter to a maximum of 250 blind samples. The number of samples submitted was based on outage ramp-up projections from the Harris Nuclear Plant (HNP) & Crystal River 3 (CR3) sites. However, the number of tests significantly increased in the last two weeks of September and no additional blind samples were submitted. There were a total of 2878 tests conducted in the third quarter 2001, but only 227 blind samples were submitted. Corrective actions included establishing an automatic reminder in the last month of the quarter to evaluate the appropriate number of blind samples to be submitted.

Omission from NRC Report In the fourth quarterT2001_,on"e-CcR3 Pre-access -ti'atbr"FFD -itive-violation-or -marijuana.

(greater than 100ng/ml) was not coded properly in the internal database causing the test result to fail to appear on the report of positives used to compile statistics for the six-month summary report to the NRC for July-December 2001. This administrative error was identified during the self-assessment of the FFD program in April 2002. This individual was denied access according to procedures. The CR3 total positive test results should have been 11 pre-access, 0 random, 1 for-cause, and 0 other. Corrective actions included correcting the code in the database, notification to the NRC of the inadvertent omission, and documenting the error in this summary of management actions.

2

EFFECTIVENESS EVALUATION Fitness For Duty Program Performance Data Random testing is required to be performed at an annual rate of at least 50% of the workforce in accordance with 10 CFR 26.24(a)(2). The current six month reporting period random testing rate was approximately 27.39 % for Carolina Power and Light Company (CP&L) Plants (Brunswick, Harris, and Robinson) and 30% for Florida Power Corporation (FPC) Crystal River Plant. For CP&L, there were 787 random tests conducted with an average of 2873 workers eligible for testing. For FPC, there were 238 random tests conducted with an average of 793 workers eligible for testing.

The total rate of positive test results for this reporting period for CP&L was approximately 1.05%. There were 20 positive results out of 1911 tests. The positive test results were comprised of 12 pre-access, 1 random, 4 for-cause, and 3 other. The total rate of positive test results for this reporting period for FPC was approximately 0.61 %. There were 2 positive results out of 329 tests. The positive test results were comprised of 0 pre-access, 2 random, 0 for-cause, and 0 other. Unescorted access for the individuals with confirmed positive tests was denied or revoked, as applicable.

For this reporting period for CP&L, the positive test rate for employees was 0.29%, with 2 posiFive result*ou6-"U f 682-tests. F60- FPCthe-positive-test -rate -for employees-was -

0.44% with 1 positive result out of 225 tests.

For this reporting period for CP&L, the positive test rate for contractors was approximately 1.46% with 18 positive results out of 1229 tests. For FPC, the positive test rate was 0.96 % with 1 positive test out of 104 tests.

There were no unsatisfactory blind performance tests during the reporting period.

3

EVENTS REPORTED TO THE NRC Events Reported By Telephone Under 10 CFR 26.73 None.

4

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 January 1, 2002 to Carolina Power & Light Company June 30, 2002 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) F Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamine 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 /

Opiates _Alcohol_(%

-300/300 BAC) 0.04% __ /____

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 901 N/A 483 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 42 0 N/A N/A 906 8 For Cause:

Post accident 0 0 N/A N/A 4 0 Observed behavior 1 0 N/A N/A 8 2 Random 262 0 N/A N/A 128 0 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 4 3 Total 305 0 N/A N/A 1050 13

Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuana Amphet- Phency- Refusal (NRCICP&L Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5.

CUTOFF)

Licensee Employees 0/0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A ' N/A N/A N/A N/A Short-Term Contracts 0/5 2 0 0 0 4 2 0 A Total 0/5 2 0 0 1 \0 4 2 0 I 1 1 8/5

FITNESS FOR DUTY PROGRAM "PERFORMANCE DATA Personnel Subject to 10 CFR 26 January 1, 2002 to Carolina Power & Light Company June 30,2002 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) j] Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 _ _/

Cocaine 300/150 Phencyclidine 25/25 /

Opiates 300/300 Alcohol (% BAC) 0.04% /

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 641 N/A 207 Unescorted Access CATEGORIES # Tested # Positive -# Tested # Positive # Tested # Positive Pre-Access 38 0 N/A N/A 59 3 For Cause:

Post accident 0 0 N/A N/A 0 0 Observed behavior 2 1 N/A N/A 0 0 Random 195 0 N/A N/A 54 0 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 1 0 TOTAL 235 1 N/A N/A 114 3

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 January 1, 2002 to Carolina Power & Light Company June 30, 2002 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) LI- Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 10001500 /

Cocaine 300/150 Phencyclidine 25/25 I Opiates _ 300/300 Alcohol (% BAC 0.04% /

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 519 N/A 122 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 26 1 N/A N/A 30 0 For Cause:

Post accident 0 0 N/A N/A 0 0 Observed behavior 0 0 N/A N/A 2 1 Random 116 0 N/A N/A 32 1 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 1 0 TOTAL 142 1 N/A N/A 65 2

Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Amphet- Phency- Refusal Adulteration Marijuana (NRC/CP&L Cocaine Opiates amines clidine Alcohol to Test 2 3 4 5 CUTOFF)

Licensee Employees 0/0 1 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 1/0 1 1 0 0 0 0 0 A Total 1/0 2 1 0 0 0 0 0 4/L

Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON I Marijuana Amphet- Phency- Refusal (NRCICP&L Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 CUTOFF)

Licensee Employees 0/0 1 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/0 1 0 0 , 0 1 0 0 A Total 010 2 0 0ol 0 1 0 0

  • f

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 January 1, 2002 to Florida Power Corporation June 30, 2002 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) F] Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 /

Opiates 300/300 Alcohol (% BAC) 0.04% /

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 645 N/A 148 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 31 0 N/A N/A 58 0 For Cause:

Post accident 1 0 N/A N/A 0 0 Observed behavior 0 0 N/A N/A 0 0 Random 193 1 N/A N/A 45 1 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 1 0 TOTAL 225 1 N/A N/A 104 1

Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana Amphet-' Phency- Refusal (NRCICP&L Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4 5 CUTOFF)

Licensee Employees 0/0 0 0 0 0 1 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 1/0 0 0 0 1 0 0 0 0 A Total 1/0 0 0 0I 0 1 0 0 2/0