August 23, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN QUAD CITIES NUCLEAR POWER STATION
Dear Mr. Skolds:
On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Quad Cities Nuclear Power Station. The mid-cycle review for Quad Cities involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period of January 1, 2002, through June 30, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.
The enclosed inspection plan details the inspections scheduled through September 30, 2003.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspection plan for the last 6 months is tentative and may be revised at the end of cycle review.
In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
J. Skolds In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosure:
Quad Cities Inspection/Activity Plan See Attached Distribution
DOCUMENT NAME: G:\\Branch TSS\\midcycle2002\\inspectionplnltrs-02\\qua-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME PPelke:co MRing DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY
J. Skolds cc w/encl:
Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leach, Manager of Nuclear MidAmerican Energy Company W. Armstrong, Chairman, Rock Island County Board M. Grchan, Rock Island County Sheriff D. DeBarre, Emergency Services and Disaster Coordinator T. Arduini, Chairman, Whiteside County Board R. Schipper, Whiteside County Sheriff C. Korvirik, Emergency Service Coordinator L. Todtz, Chairman, Clinton Board of Supervisors R. Lincoln, Clinton County Sheriff W. Henry, Director, Emergency Management F. G. Erickson, Scott County Administrator D. Huff, Scott County Sheriff R. Bergen, Coordinator, Emergency Management The Honorable Rick Dettman The Honorable Marj Dolan A. Leonard, President, Village of Port Byron J. Piatt, President, Village of Cordova The Honorable Robert Schuler The Honorable LaMetta Wynn G. Langmark, Clinton City Administrator The Honorable Richard Meiland The Honorable Vernon Spring E. N. Choate, LeClaire City Administrator The Honorable James Darnell The Honorable Al Moore INPO
J. Skolds ADAMS Distribution:
DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Quad Cities DRPIII DRSIII PLB1 JRK1
Quad Cities Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 12:54:39 Report 22 1
- RAM PROC/SHIP & ALARA INSP Baseline Inspections 09/16/2002 09/20/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/16/2002 09/20/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 09/16/2002 09/20/2002 Performance Indicator Verification IP 71151 1, 2 2
- MAINTENANCE RULE (DRS)
Baseline Inspections 10/21/2002 10/25/2002 Maintenance Effectiveness IP 7111112B 1, 2 1
Baseline Inspections 11/04/2002 11/15/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 11/04/2002 11/15/2002 ALARA Planning and Controls IP 7112102 1, 2 2
71004
- UNIT 2 EXTENDED POWER UPRATE INSPECTION Supplemental Program 11/05/2002 11/26/2002 Power Uprate IP 71004 1
2 FY 2003
- QUAD CITIES INIT PREP 10/2002 Not Applicable 11/11/2002 11/15/2002 OL - INITIAL EXAM - QUAD CITIES - OCT/DEC 2002 W90063 1
1 ISI
- INSERVICE INSPECTION, UNIT 1 Baseline Inspections 11/18/2002 11/22/2002 Inservice Inspection Activities IP 7111108 1, 2 3
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 12/02/2002 12/20/2002 Identification and Resolution of Problems IP 71152 1, 2 3
FY 2003
- QUAD CITIES INIT EXAM 12/2002 Not Applicable 12/02/2002 12/13/2002 OL - INITIAL EXAM - QUAD CITIES - OCT/DEC 2002 W90063 1
1 7112202
- LIQ/GAS EFFLUENTS Baseline Inspections 02/10/2003 02/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/10/2003 02/14/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 1
- NON-EXERCISE BASELINE EP INSPECTION Baseline Inspections 03/03/2003 03/07/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 03/03/2003 03/07/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 03/03/2003 03/07/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 03/03/2003 03/07/2003 Performance Indicator Verification IP 71151 1, 2 3
MOD50.59
- MODIFICATIONS & 50.59 Baseline Inspections 03/17/2003 03/21/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Permanent Plant Modifications IP 7111117B 1, 2 1
7112203
- REMP INSP Baseline Inspections 06/09/2003 06/13/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 06/09/2003 06/13/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 06/09/2003 06/13/2003 Radiological Environmental Monitoring Program IP 7112203 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Quad Cities Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 12:54:39 Report 22 7
RENEWAL
- LICENSE RENEWAL SCOPING Other Routine 07/28/2003 08/01/2003 License Renewal Inspection IP 71002 1, 2 1
7112103
- INSTRUMENTATION Baseline Inspections 08/11/2003 08/15/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/11/2003 08/15/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.