MID-CYCLE Performance Review and Inspection Plan - Quad Cities Nuclear Power Station (August 23, 2002)
ML022400322
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/23/2002
From: Ring M
NRC/RGN-III
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
Download: ML022400322 (7)


Text

August 23, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN QUAD CITIES NUCLEAR POWER STATION

Dear Mr. Skolds:

On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Quad Cities Nuclear Power Station. The mid-cycle review for Quad Cities involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period of January 1, 2002, through June 30, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last 6 months is tentative and may be revised at the end of cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

J. Skolds In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

Enclosure:

Quad Cities Inspection/Activity Plan See Attached Distribution

DOCUMENT NAME: G:\Branch TSS\midcycle2002\inspectionplnltrs-02\qua-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME PPelke:co MRing DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY

J. Skolds cc w/encl: Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leach, Manager of Nuclear MidAmerican Energy Company W. Armstrong, Chairman, Rock Island County Board M. Grchan, Rock Island County Sheriff D. DeBarre, Emergency Services and Disaster Coordinator T. Arduini, Chairman, Whiteside County Board R. Schipper, Whiteside County Sheriff C. Korvirik, Emergency Service Coordinator L. Todtz, Chairman, Clinton Board of Supervisors R. Lincoln, Clinton County Sheriff W. Henry, Director, Emergency Management F. G. Erickson, Scott County Administrator D. Huff, Scott County Sheriff R. Bergen, Coordinator, Emergency Management The Honorable Rick Dettman The Honorable Marj Dolan A. Leonard, President, Village of Port Byron J. Piatt, President, Village of Cordova The Honorable Robert Schuler The Honorable LaMetta Wynn G. Langmark, Clinton City Administrator The Honorable Richard Meiland The Honorable Vernon Spring E. N. Choate, LeClaire City Administrator The Honorable James Darnell The Honorable Al Moore INPO

J. Skolds ADAMS Distribution:

DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Quad Cities DRPIII DRSIII PLB1 JRK1

Page 1 of 2 Quad Cities 08/26/2002 12:54:39 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type IP 71122 - RAM PROC/SHIP & ALARA INSP 1 1, 2 IP 7112102 ALARA Planning and Controls 09/16/2002 09/20/2002 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/16/2002 09/20/2002 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/16/2002 09/20/2002 Baseline Inspections MR - MAINTENANCE RULE (DRS) 2 1, 2 IP 7111112B Maintenance Effectiveness 10/21/2002 10/25/2002 Baseline Inspections IP 71121 - RP ALARA INSP (OUTAGE) 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/04/2002 11/15/2002 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/04/2002 11/15/2002 Baseline Inspections 71004 - UNIT 2 EXTENDED POWER UPRATE INSPECTION 2 1 IP 71004 Power Uprate 11/05/2002 11/26/2002 Supplemental Program FY 2003 - QUAD CITIES INIT PREP 10/2002 2 1 W90063 OL - INITIAL EXAM - QUAD CITIES - OCT/DEC 2002 11/11/2002 11/15/2002 Not Applicable ISI - INSERVICE INSPECTION, UNIT 1 1 1, 2 IP 7111108 Inservice Inspection Activities 11/18/2002 11/22/2002 Baseline Inspections 71152 - PROBLEM IDENTIFICATION AND RESOLUTION 3 1, 2 IP 71152 Identification and Resolution of Problems 12/02/2002 12/20/2002 Baseline Inspections FY 2003 - QUAD CITIES INIT EXAM 12/2002 3 1 W90063 OL - INITIAL EXAM - QUAD CITIES - OCT/DEC 2002 12/02/2002 12/13/2002 Not Applicable 7112202 - LIQ/GAS EFFLUENTS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/10/2003 02/14/2003 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/10/2003 02/14/2003 Baseline Inspections IP 71114 - NON-EXERCISE BASELINE EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 03/03/2003 03/07/2003 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/03/2003 03/07/2003 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/03/2003 03/07/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/03/2003 03/07/2003 Baseline Inspections MOD50.59 - MODIFICATIONS & 50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/17/2003 03/21/2003 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 03/17/2003 03/21/2003 Baseline Inspections 7112203 - REMP INSP 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/09/2003 06/13/2003 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 06/09/2003 06/13/2003 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 06/09/2003 06/13/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Quad Cities 08/26/2002 12:54:39 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type RENEWAL - LICENSE RENEWAL SCOPING 7 1, 2 IP 71002 License Renewal Inspection 07/28/2003 08/01/2003 Other Routine 7112103 - INSTRUMENTATION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2003 08/15/2003 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/11/2003 08/15/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.