ML022400135
| ML022400135 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/26/2002 |
| From: | Brian Bonser NRC/RGN-II/DRP/RPB4 |
| To: | Carolina Power & Light Co |
| Shared Package | |
| ML022400120 | List: |
| References | |
| 22 | |
| Download: ML022400135 (2) | |
Text
Brunswick Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 11:40:58 Report 22 1
PS-RP
- RADIATION PROTECTION Baseline Inspections 09/23/2002 09/27/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/23/2002 09/27/2002 Performance Indicator Verification IP 71151 1, 2 4
EB2-MODS - MODIFICATIONS/10CFR50.59 Baseline Inspections 09/30/2002 10/04/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 09/30/2002 10/04/2002 Permanent Plant Modifications IP 7111117B 1, 2 1
BR4FLOOD - BASELINE FLOODING INSPECTION Baseline Inspections 10/07/2002 10/11/2002 Adverse Weather Protection IP 7111101 1, 2 Baseline Inspections 10/07/2002 10/11/2002 Flood Protection Measures IP 7111106 1, 2 2
- EMERGENCY EXERCISE Baseline Inspections 11/18/2002 11/22/2002 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 11/18/2002 11/22/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 11/18/2002 11/22/2002 Performance Indicator Verification IP 71151 1, 2 3
OL EXAM
- INITIAL EXAM Not Applicable 02/03/2003 02/07/2003 BRUNSWICK/EXAMS AT POWER FACILITIES V23201 1
3 OL EXAM
- INITIAL EXAM Not Applicable 02/18/2003 02/21/2003 BRUNSWICK/EXAMS AT POWER FACILITIES V23201 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/03/2003 03/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/03/2003 03/07/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/03/2003 03/07/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/03/2003 03/07/2003 Performance Indicator Verification IP 71151 1, 2 1
EB1
- POWER UPRATE INSPECTION Supplemental Program 03/10/2003 03/14/2003 Power Uprate IP 71004 1, 2 2
EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 03/10/2003 03/14/2003 Inservice Inspection Activities IP 7111108 2
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/17/2003 03/21/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/17/2003 03/21/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Performance Indicator Verification IP 71151 1, 2 1
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 07/07/2003 07/11/2003 Safety System Design and Performance Capability IP 7111121 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Brunswick Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 11:40:58 Report 22 1
PS-SEC
- SECURITY Baseline Inspections 08/04/2003 08/08/2003 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2 Baseline Inspections 08/04/2003 08/08/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2 Baseline Inspections 08/04/2003 08/08/2003 Performance Indicator Verification IP 71151 1, 2 5
EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 08/11/2003 08/15/2003 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 08/25/2003 08/29/2003 Safety System Design and Performance Capability IP 7111121 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.