Text

August 23, 2002 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN CLINTON POWER STATION

Dear Mr. Skolds:

On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Clinton Power Station. In accordance with NRC Inspection Manual Chapter 0305 Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Clinton Power facility for the first half of the current assessment cycle, January 1 to December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Performance Indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, at this time, we plan to conduct only baseline inspections at your facility through September 30, 2003.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last 6 months is tentative and may be revised at the end-of-cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

J. Skolds In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) components of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9729 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ann Marie Stone, Chief Branch 3 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Inspection/Activity Plan See Attached Distribution

J. Skolds In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) components of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9729 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Ann Marie Stone, Chief Branch 3 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\\Branch TSS\\midcycle2002\\inspectionplnltrs-02\\cli-inspectionplnltr.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME TTongue/trn AMStone DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY

J. Skolds cc w/encl:

Site Vice President - Clinton Power Station Senior Vice President - Mid-West Regional Operating Groupt Senior Vice President - Nuclear Services Vice President -Mid-West Operations Support Clinton Power Station Plant Manager Director Licensing - Midwest Regional Operating Group Vice President - Licensing And Regulatory Affairs Senior Counsel, Nuclear, Mid-West Regional Operating Group Regulatory Assurance Manager - Clinton Chief Operating Officer Manager Licensing - Clinton and LaSalle Document Control Desk-Licensing Illinois Department of Nuclear Safety M. Reidy, Clinton Police Chief The Honorable Tom Edmunds The Honorable Ken Schaub R. Schumaker, DeWitt County Board Chairman R. Massey, DeWitt County Sheriff M. Strain, DeWitt County Emergency Preparedness Coordinator The Honorable Thomas Brame G. C. Riss, McLean County Board Chairman S. Brienan, McLean County Sheriff J. Wahls, Director, McLean County Emergency Services and Disaster Agency R. Scheffer, Piatt County Board Chairman F. Sawlaw, Piatt County Sheriff C. E. Morris, Emergency Services Disaster Coordinator R. Owen, Macon County Board Chairman R. Walker, Macon County Sheriff D. Sanner, Emergency Services Coordinator INPO

J. Skolds ADAMS Distribution:

DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Clinton DRSIII DRPIII PLB1 JRK1

Clinton Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/26/2002 12:50:02 Report 22 1

IP 71122

- LIQ/GASEOUS EFFLUENTS INSPECTION Baseline Inspections 09/09/2002 09/13/2002 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 09/09/2002 09/13/2002 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

1 MR

- MAINTENANCE RULE Baseline Inspections 11/18/2002 11/22/2002 Maintenance Effectiveness IP 7111112B 1

3 MOD50.59

- MODIFICATIONS & 50.59 Baseline Inspections 12/09/2002 12/13/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 12/09/2002 12/13/2002 Permanent Plant Modifications IP 7111117B 1

1 IP 71122

- RAD ENVIRONMENTAL MONITORING INSPECTION Baseline Inspections 01/13/2003 01/17/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 01/13/2003 01/17/2003 Radiological Environmental Monitoring Program IP 7112203 1

Baseline Inspections 01/13/2003 01/17/2003 Performance Indicator Verification IP 71151 1

1 HT SNK B

- HEAT SINK BIENNIAL (DRS)

Baseline Inspections 02/03/2003 02/07/2003 Heat Sink Performance IP 7111107B 1

1 INSP

- NUCLEAR INSTRUMENTATION INSPECTION Baseline Inspections 03/03/2003 03/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/03/2003 03/07/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

1 INSP

- ACCESS CONTROL INSPECTION Baseline Inspections 07/14/2003 07/18/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 07/14/2003 07/18/2003 Performance Indicator Verification IP 71151 1

2 INSP

- BIENNIAL EP EXERCISE Baseline Inspections 08/18/2003 08/22/2003 Exercise Evaluation IP 7111401 1

Baseline Inspections 08/18/2003 08/22/2003 Performance Indicator Verification IP 71151 1

2 71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 09/22/2003 09/26/2003 Licensed Operator Requalification IP 7111111B 1

This report does not include INPO and OUTAGE activities.