Crystal River Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/27/2002 12:26:58 Report 22 1
EB2-HS
- HEAT SINK Baseline Inspections 10/07/2002 10/11/2002 Heat Sink Performance IP 7111107B 3
1 EB2-MR
- MAINTENANCE RULE Baseline Inspections 02/10/2003 02/14/2003 Maintenance Effectiveness IP 7111112B 3
1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 04/07/2003 04/08/2003 Safety System Design and Performance Capability IP 7111121 3
- EP INSPECTION Baseline Inspections 04/14/2003 04/18/2003 Alert and Notification System Testing IP 7111402 3
Baseline Inspections 04/14/2003 04/18/2003 Emergency Response Organization Augmentation Testing IP 7111403 3
Baseline Inspections 04/14/2003 04/18/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 04/14/2003 04/18/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3
Baseline Inspections 04/14/2003 04/18/2003 Performance Indicator Verification IP 71151 3
5 EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 05/05/2003 05/09/2003 Safety System Design and Performance Capability IP 7111121 3
Baseline Inspections 05/19/2003 05/23/2003 Safety System Design and Performance Capability IP 7111121 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.