ML022390098

From kanterella
Jump to navigation Jump to search
Final - Outlines (Change Summaries)
ML022390098
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/11/2002
From: Hornick J
Constellation Nuclear
To: Conte R
NRC/RGN-I/DRS/OSB
References
50-317/02301, 50-318/02301
Download: ML022390098 (6)


Text

ES-401 Generic Knowledge and Abilities Outline (Tier 3)

Form ES-401-5 I-I, K/A #

2.2.

-

-

Topic I

I F

-I.

11. Knowledge of process for controlling temporary changes.
30. Knowledge of RO duties in the control room during fuel handling such as alarms from fuel handling area, communication with fuel storage facility, systems operated from the control room in support of fueling operations, and supporting instrumentation.

113. Knowledge of tagging and clearance procedures.

1. Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that Total NUREG-1021, Revision 8, Supplement 1 Category 2 Equipment Control F

.1 _____

J aoints 1

1 2.5 3.6 I

4.0 1

I A I

4.4.

I I.

I w

13. Knowledge of tagging and clearance procedures.

Im1p.

F 4.Z,

ES-401 Generic Knowledge and Abilities Outline (Tier 3)

Form ES-401-5 I

YI Points 1

K/A#

2.2.

2.2.

3.3 1

2.2.

2.2.

2.2.

3.7 1

2.2.

3.5 1

1-i I

25. Knowledge of the basis in Technical Specifications for Limiting Conditions of Operations and Safety Limits. SRO
30. Knowledge of RO duties in the control room during fuel handling such as alarms from fuel handling area, communication with fuel storage facility, systems operated from the control room in support of fueling operations, and supporting instrumentation.
13. Knowledge of tagging and clearance procedures.
31. Knowledge of procedures and limitations included in initial core loading. SRO
1. Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.
27. Knowledge of the refueling process. SRO 3.8 1

2.9 1

NUREG-1021, Revision 8, Supplement 1 Category 2 Equipment Control Topic Imp.

3S.7-3.5 ITotal R'

ES-,401 PWR RO Examination OutlineFomE404 Plant Systems - Tier 2/Group 3 (Cont.)FomE-04 Plant-Specific Priorities System /Topic Recommended Replacement for:....

Reason Points Plant-Specific Priority Total: (limit 10)

NUREG-1021, Revision 8, Supplement 1

ES-401 PWR SRO Examination Outline Form ES-401-3 Plant Systems - Tier 2/Group 3 (Cont.)

Plant-Specific Priorities System / Topic Recommended Replacement for....

Reason Points Plant-Specific Priority Total: (limit 10)

NUREG-1021, Revision 8, Supplement 1

ot IV-zszf ujjo=f SVIN P0109.9H 10 PJ03E)H LOtl"63 917 10 9t, luewdlddnS 'S UOISIAOU '201-03unN