Letter Sequence Approval |
---|
|
|
MONTHYEARML0223800682002-09-17017 September 2002 Environmental Assessment & Finding of No Significant Impact Related to a Schedular Exemption from the Requirements of CFR 50.71 (e)(4) Project stage: Approval ML0223502112002-10-0202 October 2002 Exemption from the Requirements of 10 CFR 50.719(e)(4) Project stage: Approval 2002-10-02
[Table View] |
|
---|
Category:Environmental Assessment
MONTHYEARML20150A2832020-11-23023 November 2020 Encl: Environmental Assessment (Memo to File: Envir. Assessment and Finding of No Significant Impact for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Dresden ISFSI) ML20150B3712020-11-23023 November 2020 Encl: Environmental Assessment (Memo to File: Envir. Assessment and Finding of No Significant Impact for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Quad Cities ISFSI) ML18135A1882018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 NRC-2018-0122, Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 22018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 ML16056A1492016-02-25025 February 2016 Enclosuenvironmental Assessment (Letter to P. R. Simpson Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption) ML0609606242006-05-15015 May 2006 Quad Cities, TMI and Zion Environmental Assessment for Schedular Exemption from 10 CFR 50.54(a)(3) ML0334501242003-12-15015 December 2003 Environmental Assessment, Ltr., Issuance of Environmental Assessment ML0232204442003-01-0202 January 2003 Environmental Assessment & Finding of No Significant Impact Related to License Amendment Request to Change Appendix B ML0223800682002-09-17017 September 2002 Environmental Assessment & Finding of No Significant Impact Related to a Schedular Exemption from the Requirements of CFR 50.71 (e)(4) ML0220704012002-08-27027 August 2002 Environmental Assessment and Finding of No Significant Impact Related to a Scheduler Exemption from the Requirements of 10 CFR 50.55a(g)(4)(ii) ML0218901332002-07-0909 July 2002 Environmental Assessment, Reschedule the Requalification Examinations 2020-11-23
[Table view] Category:Finding of No Significant Impact
MONTHYEARML20150A2832020-11-23023 November 2020 Encl: Environmental Assessment (Memo to File: Envir. Assessment and Finding of No Significant Impact for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Dresden ISFSI) ML20150B3712020-11-23023 November 2020 Encl: Environmental Assessment (Memo to File: Envir. Assessment and Finding of No Significant Impact for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Quad Cities ISFSI) ML18135A1882018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 NRC-2018-0122, Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 22018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 ML16056A1492016-02-25025 February 2016 Enclosuenvironmental Assessment (Letter to P. R. Simpson Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption) ML0334501242003-12-15015 December 2003 Environmental Assessment, Ltr., Issuance of Environmental Assessment ML0223800682002-09-17017 September 2002 Environmental Assessment & Finding of No Significant Impact Related to a Schedular Exemption from the Requirements of CFR 50.71 (e)(4) ML0220704012002-08-27027 August 2002 Environmental Assessment and Finding of No Significant Impact Related to a Scheduler Exemption from the Requirements of 10 CFR 50.55a(g)(4)(ii) ML0218901332002-07-0909 July 2002 Environmental Assessment, Reschedule the Requalification Examinations 2020-11-23
[Table view] Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 IR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report 2024-02-05
[Table view] |
Text
September 17, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 -
ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO A SCHEDULAR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.71(e)(4) (TAC NOS. MB5864, MB5865, MB5866, AND MB5867)
Dear Mr. Skolds:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated August 9, 2002. The proposed exemption would grant a one-time extension for the submittal of revisions to the Dresden Nuclear Power Station and Quad Cities Nuclear Power Station Updated Final Safety Analysis Reports until June 30, 2005, and October 20, 2005, respectively.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-237, 50-249, 50-254, and 50-265
Enclosure:
Environmental Assessment cc w/encl: See next page
Dresden, Units 2 and 3 Quad Cities, Units 1 and 2 cc:
Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road William D. Leech Morris, IL 60450-9765 Manager - Nuclear MidAmerican Energy Company Dresden Nuclear Power Station Plant Manager P.O. Box 657 Exelon Generation Company, LLC Des Moines, IA 50303 6500 N. Dresden Road Morris, IL 60450-9765 Vice President - Law and Regulatory Affairs Regulatory Assurance Manager - Dresden MidAmerican Energy Company Exelon Generation Company, LLC One River Center Place 6500 N. Dresden Road 106 E. Second Street Morris, IL 60450-9765 P.O. Box 4350 Davenport, IA 52808 Dresden Resident Inspectors Office U.S. Nuclear Regulatory Commission Chairman 6500 N. Dresden Road Rock Island County Board Morris, IL 60450-9766 of Supervisors 1504 3rd Avenue Chairman Rock Island County Office Bldg.
Grundy County Board Rock Island, IL 61201 Administration Building 1320 Union Street Regional Administrator Morris, IL 60450 U.S. NRC, Region III 801 Warrenville Road Site Vice President - Quad Cities Nuclear Power Sta. Lisle, IL 60532-4351 Exelon Generation Company, LLC 22710 206th Avenue N. Illinois Department of Nuclear Safety Cordova, IL 61242-9740 Office of Nuclear Facility Safety 1035 Outer Park Drive Quad Cities Nuclear Power Station Plant Manager Springfield, IL 62704 Exelon Generation Company, LLC 22710 206th Avenue N. Document Control Desk-Licensing Cordova, IL 61242-9740 Exelon Generation Company, LLC 4300 Winfield Road Regulatory Assurance Manager - Quad Cities Warrenville, IL 60555 Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.
Cordova, IL 61242
Dresden, Units 2 and 3 Quad Cities, Units 1 and 2 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President Mid-West Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Dresden and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
September 17, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 -
ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO A SCHEDULAR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50.71(e)(4) (TAC NOS. MB5864, MB5865, MB5866, AND MB5867)
Dear Mr. Skolds:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated August 9, 2002. The proposed exemption would grant a one-time extension for the submittal of revisions to the Dresden Nuclear Power Station and Quad Cities Nuclear Power Station Updated Final Safety Analysis Reports until June 30, 2005, and October 20, 2005, respectively.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Carl F. Lyon, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-237, 50-249, 50-254, and 50-265
Enclosure:
Environmental Assessment cc w/encl: See next page Distribution:
PUBLIC OGC, O15B18 PD3-2 r/f ACRS, T2E26 A. Mendiola J. Tappert C. Rosenberg L. Rossbach F. Lyon M. Ring, RIII Adams Accession Number: ML022380068 OFFICE PM:LPD3-2 LA:LPD3-2 SC:RLEP OGC SC:LPD3-2 NAME FLyon CRosenberg JTappert SUttal, NLO AMendiola DATE 8/27/02 8/27/02 9/7/02 9/12/02 9/13/02 OFFICIAL RECORD COPY
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION EXELON GENERATION COMPANY, LLC DOCKET NOS. 50-237, 50-249, 50-254, and 50-265 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from certain requirements of 10 CFR 50.71(e)(4) for Facility Operating License Nos.
DPR-19 and DPR-25, issued to Exelon Generation Company, LLC (the licensee), for operation of the Dresden Nuclear Power Station, Units 2 and 3, located in Grundy County, Illinois, and for Facility Operating License Nos. DPR-29 and DPR-30, issued to the licensee, for operation of the Quad Cities Nuclear Power Station, Units 1 and 2, located in Rock Island County, Illinois.
Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:
The proposed action would grant a schedular extension for Dresden Nuclear Power Station (Dresden), Units 2 and 3, and for Quad Cities Nuclear Power Station (Quad Cities),
Units 1 and 2, for submittal of revised Updated Final Safety Analysis Reports (UFSARs) from the regularly scheduled dates. 10 CFR 50.71(e)(4) requires that subsequent revisions to the UFSAR be submitted periodically to the NRC provided that the interval between successive updates does not exceed 24 months. The Dresden and Quad Cities UFSAR revisions are currently submitted on a 24-month cycle. The next scheduled date for submittal of the revised UFSAR for Dresden is June 30, 2003, and for Quad Cities is October 20, 2003. However, the
licensee plans to submit revised UFSARs along with Operating License Renewal Applications (LRAs) for Dresden and Quad Cities in January 2003. The licensee plans to resume the established schedule for submittal of the UFSAR revisions in 2005 for both stations. The licensee requests a one-time exemption to postpone submittal of the revised Dresden and Quad Cities UFSARs until 2005.
The proposed action is in accordance with the licensees application dated August 9, 2002.
The Need for the Proposed Action:
The licensee proposes to submit revised UFSARs with LRAs in January 2003, and to resume the established schedule for submittal of UFSAR revisions for Dresden on June 30, 2005, and for Quad Cities on October 20, 2005. An exemption is required because 10 CFR 50.71(e)(4) requires that subsequent revisions to the UFSAR be submitted periodically to the NRC provided that the interval between successive updates does not exceed 24 months.
Environmental Impacts of the Proposed Action:
The NRC has completed its evaluation of the proposed action and concludes that there are no significant adverse environmental impacts associated with the proposed action.
The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types of effluents that may be released off site, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impact. Therefore, there are no significant nonradiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
Alternative Use of Resources:
The action does not involve the use of any different resource than those previously considered in the Final Environmental Statement for the Dresden Nuclear Power Station, Units 2 and 3, dated November 1973, and for the Quad Cities Nuclear Power Station, Units 1 and 2, dated September 1972.
Agencies and Persons Consulted:
On August 22, 2002, the staff consulted with the Illinois State official, Mr. F. Niziolek of the Department of Nuclear Safety, regarding the environmental impact of the proposed action.
The State official had no comments.
FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensees letter dated August 9, 2002. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 17th day of September 2002.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation