September 9, 2002 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF JULY 24, 2002, MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING PILGRIM NUCLEAR POWER STATION PROPOSED SAFETY-RELIEF VALVE SEISMIC ANALYSIS METHODOLOGY (TAC NO. MB5603)

On July 24, 2002, members of the U.S. Nuclear Regulatory Commission (NRC) staff participated in a Category 1 public meeting held at the NRC offices in Rockville, Maryland with representatives from Entergy Nuclear Operations, Inc. (ENO). Pursuant to the Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), dated May 28, 2002, the meeting was open to the public for observation and opportunity to communicate with the NRC staff following the business portion of the meeting. Attachment 1 is the meeting agenda, Attachment 2 provides the meeting handouts, and Attachment 3 lists the meeting attendees.

The meeting was scheduled at the request of ENO. The purpose of the meeting was to provide the NRC staff with a presentation of a seismic analysis methodology proposed for safety-relief valve (SRV) downcomers at the Pilgrim Nuclear Power Station (Pilgrim) presented in ENOs application dated July 5, 2002, to increase the licensed power level of Pilgrim by 1.5%.

The meeting began with opening remarks made by Pilgrim Project Manager, Mr. Travis L. Tate, Division of Licensing Project Management, Office of Nuclear Reactor Regulation. Mr. Tate discussed the Category 1 meeting designation, the level of public participation, and the purpose and objectives of the meeting. Following introductions by the attendees, the meeting was turned over to ENO for the presentation and discussion. Mr. Bryan Ford, ENOs Licensing Manager for Pilgrim, discussed the overview of the application dated July 5, 2002, which involves a request to increase the licensed power level for Pilgrim based on a 1.5% feedwater flow uncertainty reduction. The proposed 1.5% increased power level is planned to be implemented during the April 2003 refueling outage and involves modifications to install new feedwater flow measurement equipment, a new high pressure turbine, new turbine control valves, new moisture separator internals, and increase the SRV throat capacity. Mr. Raymond Pace, ENOs Mechanical/Civil Design Supervisor for Pilgrim, provided details of the proposed application of the Independent Support Methodology (ISM) for the piping/support analysis as a result of the higher SRV flow, including the history and benefits of its use. Mr. Ford concluded ENOs presentation with a summary of the key points.

Following closing remarks by Mr. Tate, the meeting adjourned at approximately 11:00 a.m.

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293 Attachments: As stated cc w/attch: See next page

ML022320656 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC(A)

NAME TTate TClark JZimmerman DATE 08/26/02 08/26/02 08/27/02 Pilgrim Nuclear Power Station cc:

Resident Inspector Mr. C. Stephen Brennion U. S. Nuclear Regulatory Commission Licensing Superintendent Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station Post Office Box 867 600 Rocky Hill Road Plymouth, MA 02360 Plymouth, MA 02360-5599 Chairman, Board of Selectmen Mr. Jack Alexander 11 Lincoln Street Manager, Reg. Relations and Plymouth, MA 02360 Quality Assurance Pilgrim Nuclear Power Station Chairman, Duxbury Board of Selectmen 600 Rocky Hill Road Town Hall Plymouth, MA 02360-5599 878 Tremont Street Duxbury, MA 02332 Mr. David F. Tarantino Nuclear Information Manager Office of the Commissioner Pilgrim Nuclear Power Station Massachusetts Department of 600 Rocky Hill Road Environmental Protection Plymouth, MA 02360-5599 One Winter Street Boston, MA 02108 Ms. Jane Perlov Secretary of Public Safety Office of the Attorney General Executive Office of Public Safety One Ashburton Place One Ashburton Place 20th Floor Boston, MA 02108 Boston, MA 02108 Mr. Stephen J. McGrail, Director Dr. Robert M. Hallisey, Director Attn: James Muckerheide Radiation Control Program Massachusetts Emergency Management Commonwealth of Massachusetts Agency Executive Offices of Health and 400 Worcester Road Human Services Framingham, MA 01702-5399 174 Portland Street Boston, MA 02114 Chairman Nuclear Matters Committee Regional Administrator, Region I Town Hall U. S. Nuclear Regulatory Commission 11 Lincoln Street 475 Allendale Road Plymouth, MA 02360 King of Prussia, PA 19406 Mr. William D. Meinert John M. Fulton Nuclear Engineer Assistant General Counsel Massachusetts Municipal Wholesale Pilgrim Nuclear Power Station Electric Company 600 Rocky Hill Road P.O. Box 426 Plymouth, MA 02360-5599 Ludlow, MA 01056-0426

U.S. Nuclear Regulatory Commission Meeting with Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station - Safety-Relief Valve Seismic Analysis Methodology July 24, 2002 Room - O9B4 9:00 to 11:30 a.m.

Purpose:

To provide the NRC staff with a presentation of the seismic analysis methodology used for the safety-relief valve downcomers at Pilgrim in support of ENOs application dated July 5, 2002, for license amendment to increase the licensed power level of Pilgrim (ML021990570).

Objective: To establish a clear understanding of the seismic analysis methodology in the power uprate application.

Introductory Remark . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9:00 to 9:05 a.m.

Overview of Seismic Analysis Methodology . . . . . . . . . . . . . . . . . . . . . . 9:05 to 10:05 a.m.

Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10:05 to 10:15 a.m.

Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10:15 to 10:55 a.m.

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10:55 to 11:00 a.m.

Public Comments/Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11:00 to 11:30 a.m.

Adjourn . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11:30 a.m.

The NRC staff will be available immediately following the meeting to speak with members of the public.

Attachment 1

MEETING ATTENDANCE LIST Licensee: Entergy Nuclear Operations, Inc.

Plant : Pilgrim Nuclear Power Station

Subject:

Presentation on Safety-Relief Valve Seismic Analysis Methodology Date: July 24, 2002 Time: 9:00 a.m. - 11:30 a.m.

Location: NRC Offices, OWFN, Room O-9B4 Name Title Organization Raymond Pace Mechanical/Civil Design Supervisor Entergy - Pilgrim Steve Bethay Engineering Director Entergy - Pilgrim Fred Mogolesko Project Manager Entergy - Pilgrim Bryan Ford Licensing Manager Entergy - Pilgrim John Fair Sr. Mechanical Engineer NRR/DE/EMEB Travis Tate Project Manager NRR/DLPM/LPDI-2 John Wu Mechanical Engineer NRR/DE/EMEB Mark Hartzman Mechanical Engineer NRR/DE/EMEB Jason Paige IT - Summer hire NRR/DLPM Scott Wall Project Manager NRR/DLPM/LPDI-2 Attachment 3