ML022310265

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Palo Verde Nuclear Generating Station, Units 1, 2 & 3
ML022310265
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/08/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00707-WEI/SMM
Download: ML022310265 (4)


Text

Palo Verde Nuclear Generating Station William E. Ide Vice President Nuclear Production TEL (623) 393-6116 FAX (623) 393-6077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 035-00707-WEI/SMM August 8, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JULY 2002 Enclosed are the Monthly Operating Reports for JULY 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, WEI/SMM/cj

Enclosures:

JULY 2002 Monthly Operating Reports cc:

E. W. Merschoff PVNGS Resident Inspector INPO Records Center Utility Data Institute (all w/enclosures)

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

50-528 UNIT NAME:

PVNGS-1 DATE:

08/08/02 COMPLETED BY:

S. M. Meyer TELEPHONE:

(602) 250-3078 Reporting Period:

July 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243

3.
4.
5.

6.

UNIT SHUTDOWNS Outage Method of Duration Shutting Down No.

Date Type 1 Hours Reason2 Reactor 3 No reactor shutdowns occurred during the month of July 2002.

Cause and Corrective Action to Prevent Occurrence 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit I Generating Statistics This Month Yr. to Date Cumulative f

Re r was Critical.

744.0 5,088.0 111,319.1 Hours Generator was On-Line 744.0 5,088.0 109,975.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 923,937 6,394,482 132,358,040

'F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-529 PVNGS-2 08/08/02 S. M. Meyer (602) 250-3078 July 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243

3.
4.
5.

6.

UNIT SHUTDOWNS No.

Date Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of July 2002.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical -

744.0 4,338.0 110,239.5 Hours Generator was On-Line 744.0 4,309.6 108,907.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 930,527 5,383,966 132,308,477 1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Repo 50-530 PVNGS-3 08/08/02 S. M. Meyer (602) 250-3078 rting Period:

July 2002

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

3.
4.
5.

6.

1247 UNIT SHUTDOWNS Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of July 2002.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 3 Generating Statistics This Month Yr. to Date Cumulative

.Hours Reactor was Critical,

744.0 5,088.0 106,511.7 Hours Generator was On-Line 744.0 5,088.0 105,523.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 937,634 6,475,238 128,844,688 No.

Date TypeI Outage Duration Hours 1F-Forced S-Scheduled