ML022280272
| ML022280272 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/07/2002 |
| From: | Holt J Carolina Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-02-104 | |
| Download: ML022280272 (1) | |
Text
SCP&L A Progress Energy CAp-r,,
AUG 7 2002 SERIAL: HNP-02-104 10 CFR 50, Appendix E United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CHANGE TO EMERGENCY PLAN IMPLEMENTING PROCEDURES
Dear Sir or Madam:
In accordance with 10 CFR 50, Appendix E, Carolina Power & Light Company is transmitting one copy each of recently revised Harris Nuclear Plant Emergency Plan implementing procedures. The enclosure to this letter identifies the revised emergency plan implementing procedures and their effective date.
Questions regarding this submittal may be referred to Mr. J. R. Caves at (919) 362-3137.
Sincerely, James Holt Manager, Support Services Harris Nuclear Plant MGW Enclosures c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. J. M. Goshen (NRR Project Manager, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II) two copies of procedure K
H541, %j r Hai Pla" 5413 S'ieý.oi Ha- -Ro*,ad,