ML022130602
| ML022130602 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, Catawba, McGuire |
| Issue date: | 08/01/2002 |
| From: | Martin R NRC/NRR/DLPM/LPD2 |
| To: | Tuckman M Duke Energy Corp |
| References | |
| DPC-NE-2005P, TAC MB3105, TAC MB3106, TAC MB3173, TAC MB3175 | |
| Download: ML022130602 (5) | |
Text
August 1, 2002 Mr. M. S. Tuckman Executive Vice President Nuclear Generation Duke Energy Corporation 526 South Church St Charlottte, NC 28202
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 AND MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 RE: REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF DUKE TOPICAL REPORT DPC-NE-2005P (TAC NOS. MB3105, MB3106, MB3173 AND MB3175)
Dear Mr. Tuckman:
The Nuclear Regulatory Commission is reviewing your application dated September 13, 2001, entitled Appendix E to Topical Report DPC-NE-2005P, Duke Power Thermal-Hydraulic Statistical Core Design Methodology (Proprietary) and has identified a need for additional information as identified in the Enclosure. These issues were discussed with your staff on July 24, 2002. Please provide a response to this request within thirty (30) days of receipt of this letter so that we may complete our review.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369 and 50-370
Enclosure:
Request for Additional Information cc w/encl: See next page
August 1, 2002 Mr. M. S. Tuckman Executive Vice President Nuclear Generation Duke Energy Corporation 526 South Church St Charlottte, NC 28202
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 AND MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 RE: REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF DUKE TOPICAL REPORT DPC-NE-2005P (TAC NOS. MB3105, MB3106, MB3173 AND MB3175)
Dear Mr. Tuckman:
The Nuclear Regulatory Commission is reviewing your application dated September 13, 2001, entitled Appendix E to Topical Report DPC-NE-2005P, Duke Power Thermal-Hydraulic Statistical Core Design Methodology (Proprietary) and has identified a need for additional information as identified in the Enclosure. These issues were discussed with your staff on July 24, 2002. Please provide a response to this request within thirty (30) days of receipt of this letter so that we may complete our review.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369 and 50-370
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC B. Martin ACRS THuang PDII-1 Reading C. Hawes R. Haag, RII OGC J. Nakoski C. Patel Accession Number: ML022130602 OFFICE PDII-1/PM PDII-1/PM PDII-1/LA PDII-1/SC NAME RMartin CPatel CHawes JNakoski DATE 7/24/02 7/25/02 7/24/02 7/25/02 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST APPLICABLE TO REVISIONS TO TOPICAL REPORT DPC-NE-2005-P, CATAWBA NUCLEAR STATION, UNITS 1 AND 2 MCGUIRE NUCLEAR STATION, UNITS 1 and 2 DUKE ENERGY CORPORATION The staff has reviewed Duke Powers submittal dated September 13, 2001, Appendix E to DPC-NE-2005P, Duke Power Thermal-Hydraulic Statistical Core Design (SCD) Methodology (Proprietary) and has identified a need for the following additional information.
1.
The submittal states that Appendix E contains the plant specific data and statistical departure from nucleate boiling (DNB) limits for the McGuire and Catawba Nuclear Stations with the Advanced Mark-BW fuel design using the BWU-Z critical heat flux (CHF) correlation and provides the fuel assembly structural and thermal-hydraulic features unique to the Advanced Mark-BW fuel design. However, the submittal also states that its SCD analysis is applicable to and bounds both the Advanced Mark-BW and the Mark-BW/MOX1 fuel designs. It appears that the data provided in the submittal are only applicable to the Advanced Mark-BW fuel design. Please clarify whether the methodology described in Appendix E to DPC-NE-2005P will be applied to both the Advanced Mark-BW and the Mark-BW/MOX1 fuel designs. If it is applicable to both designs, then additional data sets for the Mark-BW/MOX1 should be provided. Also, please identify those differences between the Advanced Mark-BW and Mark-BW17 fuel design.
2.
Provide the Advanced Mark-BW fuel database used in Table E-2 of the September 13, 2001, submittal and describe the process used to obtain the 148 new data points in the two tests. Also, please demonstrate that the new data are duplicate and close to the old data used in the topical report, BAW-10199P, Addendum 2, Application of the BWU-Z CHF Correlation to the Mark-BW17 Fuel Design with Mid-Span Mixing Grids, and justify that the data base is sufficient for this application.
3.
Provide details of the calculation procedure used to evaluate the effect of crossflow between the different fuel types as well as the form loss coefficients used as inputs for the mixed core analysis. Also, describe the real test data available for this application to McGuire and Catawba and justify that the DNB statistical design limit of 1.36 is sufficient for McGuire and Catawba using the BWU-Z CHF correlation for Advanced Mark-BW fuel mixed with Westinghouse robust fuel assembly fuel.
McGuire Nuclear Station Catawba Nuclear Station cc:
Ms. Lisa F. Vaughn Legal Department (PBO5E)
Duke Energy Corporation 422 South Church Street Charlotte, North Carolina 28201-1006 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, North Carolina 28202 Mr. Michael T. Cash Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW.
Washington, DC 20005 Senior Resident Inspector c/o U. S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Dr. John M. Barry Mecklenburg County Department of Environmental Protection 700 N. Tryon Street Charlotte, North Carolina 28202 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Elaine Wathen Lead REP Planner Division of Emergency Management 116 West Jones Street Raleigh, North Carolina 27603-1335 Mr. T. Richard Puryear Owners Group (NCEMC)
Duke Energy Corporation 4800 Concord Road York, South Carolina 29745