COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 9.0 METEOROLOGY AND OFFSITE RADIOLOGICAL DATA This section provides meteorological, field monitoring, and offsite assembly monitoring/decontamination information for Controller use when simulating offsite response conditions. It includes the following:
9.1 Meteorological Data Summary 9.2 Radioactive Release Information 9.3 Onsite Plume Survey Data 9.4 Offsite Plume Survey Data 9.1 METEOROLOGICAL DATA
SUMMARY
This section contains the meteorological parameters modeled to coincide with the scenario sequence of events.
The data has been entered in the Simulator data files in order to disseminate it over the Transient Data Acquisition System (TDAS) during the Drill. Controllers should not provide hardcopy or verbal meteorological data to the Players as long as the Simulator is running. Players should obtain meteorological data from TDAS as they would normally.
Note: If the Simulator should malfunction, however, during the course of the Drill, Controllers are then permitted to release the data provided in this section.
Data in this section includes the Meteorological Overview and Forecast Information below.
METEOROLOGICAL OVERVIEW AND FORECAST INFORMATION Overview:
"* Normal temperatures on an overcast day
"* No precipitation.
"* Control Room Simulator will display meteorological data based on pre designated parameters. The Simulator via the PDIS will provide the data to the other emergency facilities.
Forecast:
"* Wind direction will begin from the northeast at seasonal wind speeds (approximately 8 MPH), changing to more northerly later in the morning..
"* Temperature will increase from 68F at 0700 to approximately 75°F at 1600.
Table 9.1 Section 9 Page 9-1 July 12,2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 9.2 RADIOACTIVE RELEASE INFORMATION The release path is:
- 1) --4% gap/ -2% fuel melt activity is released into the primary coolant;
- 2) CEP-V-3A and V-4A fail to close;
- 3) A containment purge (CEP) leak between the inboard and outboard containment isolation valves (CEP-V-3A and V-4A) occurs at 1055;
- 4) At 1100, environmental field teams begin tracking the plume. Radiological material released includes noble gases, halogens and particulate.
Valve CEP-V-4A is closed at 1155, stopping the release into the Reactor Building.
Use of field teams should end about 1530 when plant transitions into recovery.
Radiation release rate information is provided in Table 9.2.
9.3 ONSITE PLUME DATA This section of the manual provides information necessary for Controllers to use in simulating site radiation levels due to the radioactive plume that is released during the course of the Exercise.
The plume is elevated off the ground in the 1/2-mile circle of the onsite plume map. For the purposes of the drill, the plume is assumed to begin drifting toward ground level beyond the 1/2 mile circle on the onsite plume map.
On-site survey data is listed for specific grid points, numbered from 1 to 625. Columbia Generating Station is centered on grid no. 313. Use the data for the grid square that contains the geographical coordinates determined by the Field Team.
NOTE: If Players are using a count rate meter, Controllers can convert the readings by assuming 1 mRem/hr = 2000 cpm.
NOTE: Controllers should ROUND UP all meter readings to 2 significant digits. For example, a reading of 1478 uR/hr should be given as "1500 micro-.."
On-site radiation release information is provided in Table 9.3.
Page 9-2 July 1, 2002 Section 9
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 9.4 OFFSITE PLUME DATA This section of the manual provides information necessary for Controllers to use in simulating offsite radiation levels due to the radioactive plume that is released during the course of the Exercise.
The open window readings are assumed to be approximately 1.7 times greater than the closed window readings for the isotopic mix in the release. For purposes of this exercise, the plume is assumed to remain elevated until approximately one half mile downwind of the release point.
3 Air sample results are based on an assumed air sample volume of 10 ft and a background level of 60 cpm.
Off-site survey data is listed for specific grid points, numbered from 1 to 1122. Columbia Generating Station is centered between grid nos. 526 and 527. Use the data for the grid square that contains the geographical coordinates determined by the Field Team.
NOTE: If Players are using a count rate meter, Controllers can convert the readings by assuming 1 mRem/hr = 2000 cpm.
NOTE: Controllers should ROUND UP all meter readings to 2 significant digits. For example, a reading of 1478 uR/hr should be given as "1500 micro-.L" Off-site radiation release information is provided in Table 9.4.
Page 9-3 July 1, 2002 Section 9
)
Columbia G-enerating Station Paved Road Legend I
On Site Vicinity Map Improved / Gravel Road Jeep Trail Railroad x- x Power Line With Steel Towers (Field Team Controller Map) S -
Power Line With Steel Poles oPower Line With Wooden Poles E-ence-L ine .. .:...... . . .... . .. .
-4 A Environmental Monitoring Sta.
Th.,h N. <m Q 9 9) 0.' .'95 \\ I9,~
50 30' 00" - .... -- Exclusion-Area-Sign K' K' I1Si,rep-WarningSign
ý11 K' .'>
So 29'50"1-0 mi.
Scale--: lmil A.' (N (N K.'K> 9' N 9.> 'bOUBLý OODbPýILEA\ *P t lk 7 So 29'40" PARALLEUtINES ...
(NOT SHOWN) MOEN" A N cK
- 9 N
IN (N, 50 29' 30" 2 <K-'7. d?
'C' Q, 199 N.
A A~
rl, .
So 29'20" -
N.
-9.' '-K" N.'
4> .9, Ni?
2qý <' A.'(
\ \ \) \)
N A.' (<-.'
50 29'110" m N N,*
N. N. N N'ý 50 29'100" AV-> <K N>' K P7 WSHE rat_]__L+ +*_' ... i _.
5o 28' 50" K" d** N-' q3-k-iq q,- ;q>/Q, " C) 089TATONW
, (),
2N.~
nr-14,'rw! S'PPLY A491
- (-' -I ;z "3Y" f/ IN 4) 1 Q ... i-NAIN f.-'
So28'40" T q IN -"*, .
S...+.... . ... .....÷-----;-..--- ------
9-) 9' '9,.)
>Y.... K ........
A 9.'__
------ _" Al,_?
9, A\,/4 . ,-f! i <,- ,. "<
So 28'30" : A.
-N+ '>*
( 7,
//
I" O.TROAD
-u A.RE's~ MA,,4 IN
.. -Ni a13N t-.-.,
', .. ..........iI.........
So 28'20" i ', K, 1
-N-- o'- , '-'.', , ..¢ i ,,-> A..* 9'
.k:°++... .... -i - ;
NERA 3028,110" G VE' 22"I r .....
....... IT N... -:,
50 28' 00" /
(
N"
. i
- 9+
A**
.i a-L i [ I ¢ " . ... . . . . ..
4-77]7*
..... L-.......
116 _; ý, ! -ý ýIF ý -ý , U .
......,L A *tE::-f*
ý [c - .1k Arý:, ,
ENT'
-E 6665i -ý ?-&V P-dk ý I
, .......-A{
- 11i V;.L l
(Nm.
I
,.'Y_ _.'Y __ t,
/l' AJGRAVEL 60 27' 50"1 N . \ . . ' . .. . N. >'
N.': q>
i : V.I+ BE )' il I %
502714011 R~AN'GE hO'lb 50 27' 30"
... N' ......
.. <1,?.'~.,+ <,,;++u +fA > AN <++ -. %) k..
N- N N.-
50 27' 20" 9'iA N9' N. <A A.' K" K)
N. Nx N.-
9- - ... ----
50 27' 10" &25
-) AA)
So 27' 00" S. 7"t: . . . . .
I ... . .. ..
I-N>'
A" 1'X
. . . . . .. . . I
-IT A-.'-.>
Al
.,. ..' ., <.") K-K." .'N A AN>
.1*
A)
S0 26' 50" x 'i.' 'A A
(
(A (A
S.' K-s 2."' 4> )
92.' (.<>
A-) '
K A '
A "
N l
I-j'A (-K.'
K N.
So 26'40".- I K N>.' 12
- ,< 9 C)
A.,
(N <j' "A N
N. A" 9.' 4)<o,N . ,* A) .'
0 I' N. '.'
Q.'
- A'
- N N (N
N N. N K> (C' A *> N. N. t:j4. K' 5° 26' 30" r
'99' I I I I I i i i-- - - I I I I I I I I I I I I I I
-L -. L -4 -4. -4 -4 -4 -4 -4 I -4 -4 .i4 -ll ill ,i4
-L -
-I
- I
-4
.4
-4 -4
-4 ID -4 -4 -4 -4 -4 -4 -4 -4 -A -4 ,-L .-L, .--i ,il -,i 0 0 00 CC CD CO 00 0o CD CD CD CD 0 0 CD CD ii4 0 0,i No 0 0 0 0 0 0 0 .., 0 0 ..*1
-L -L CA N, 0
I%3 I N, N, N, N, 0
N, N, K) 0 N,
0 N, N, 0
-A -4 -4 ,,.,h -L 0 0 0 0 q 0 0 CD
)00515SK N, N N I -4 -4 -4 0 U'
CO CD (g 0 02
.i2 0e -L -L July 2000 N, -L C* 01 N, -4 C,' .b.
q~ N, -4 0V CD) 0 0 0 I 0 0 0 0 0 0 0 0 0 0
-3 )- --
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 10:00 Drill Time: 03:00
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-1 7/12/2002
) ) I Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 10:15 Drill Time: 03:15
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-2 7/12/2002
4)
"I
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 10:30 Drill Time: 03:30
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-3 7/12/2002
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 10:45 Drill Time: 03:45
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-4 7/12/2002
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 11:00 Drill Time: 04:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3- Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 As Read As Read As Read As Read 50 AsRead 1,431 90 4.8E-08 348 361 AsRead As Read AsRead AsRead 21 As Read 562 35 1.9E-08 136 362 As Read As Read As Read As Read As Read As Read As Read 9 4.6E-09 As Read 385 As Read As Read As Read As Read As Read As Read 304 19 1.0E-08 73 386 As Read As Read As Read As Read 25 As Read 681 43 2.3E-08 165 409 As Read As Read As Read As Read As Read As Read As Read 12 6.4E-09 As Read 410 As Read As Read As Read As Read 27 As Read 687 43 2.3E-08 165 433 As Read As Read As Read As Read As Read As Read As Read 9 4.5E-09 As Read 434 As Read As Read AsRead As Read 21 As Read 518 32 1.7E-08 123 435 As Read As Read As Read As Read As Read As Read As Read 7 3.7E-09 As Read 457 As Read As Read As Read As Read As Read As Read As Read 6 3.3E-09 As Read 458 As Read As Read As Read As Read 16 As Read 379 23 1.2E-08 90 459 As Read As Read As Read As Read As Read As Read 207 13 6.8E-09 As Read 482 As Read As Read As Read As Read As Read As Read 282 17 9.2E-09 67 483 As Read As Read AsRead As Read As Read As Read 248 15 8.1E-09 59 506 As Read As Read As Read As Read As Read As Read 200 12 6.5E-09 As Read 507 As Read As Read As Read As Read As Read As Read 243 15 7.9E-09 58 530 As Read As Read As Read As Read As Read As Read As Read As Read 3.1E-09 As Read 531 As Read As Read As Read As Read As Read As Read As Read 11 6.OE-09 As Read 532 As Read As Read As Read As Read As Read As Read As Read 6 3.2E-09 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-5 7/12/2002
10 41 )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 11:15 Drill Time: 04:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3'C.W. 3' Contact Point (mRlhr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 3 As Read 24 19 2351 8,462 >50,000 3,397 1.8E-06 13,844 361 As Read As Read 9 7 892 3,210 24,471 1,223 6.5E-07 4,983 362 As Read As Read 5 4 546 1,966 13,393 665 3.5E-07 2,709 385 As Read As Read 5 4 466 1,676 12,782 638 3.4E-07 2,601 386 As Read As Read 18 14 1799 6,478 >50,000 2,548 1.4E-06 10,385 408 As Read As Read As Read As Read As Read As Read As Read 7 3.6E-09 As Read 409 As Read As Read As Read As Read 286 1,028 7,994 400 2.1E-07 1,631 410 As Read As Read 16 12 1662 5,982 44,070 2,206 1.2E-06 8,990 411 As Read AsRead As Read As Read 95 341 2,147 105 5.6E-08 429 432 As Read As Read As Read As Read As Read As Read 210 10 5.4E-09 As Read 433 As Read As Read AsRead As Read 191 689 5,499 276 1.5E-07 1,126 434 As Read As Read 11 8 1169 4,208 30,187 1,503 8.OE-07 6,123 435 As Read As Read 4 As Read 353 1,272 9,921 503 2.7E-07 2,050 456 As Read As Read As Read As Read As Read As Read 260 13 6.9E-09 53 457 As Read As Read As Read As Read 135 485 3,990 201 1.1E-07 820 458 As Read As Read 7 6 799 2,876 20,567 1,022 5.4E-07 4,165 459 As Read As Read 6 5 601 2,164 16,319 822 4.4E-07 3,350 460 As Read As Read As Read As Read 31 As Read 767 38 2.OE-08 156 480 As Read As Read As Read As Read As Read As Read 269 14 7.2E-09 55 481 As Read As Read As Read As Read 99 358 3,030 153 8.1E-08 625 482 As Read As Read 5 4 560 2,015 14,551 724 3.8E-07 2,949 483 As Read As Read 6 5 693 2,496 17,664 880 4.7E-07 3,585 484 As Read As Read As Read As Read 104 373 3,037 155 8.2E-08 632 504 As Read As Read As Read As Read As Read As Read As Read 8 4.3E-09 As Read 505 As Read As Read As Read As Read 66 237 2,045 104 5.5E-08 423
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-6 7/12/2002
I)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 11:15 Drill Time: 04:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor Point 506 O.W.
(mR/hr)
As Read F C.W.
r(mR/hr)
As Read O.W.
(mR/hr) 4 C.W.
(mR/hr)
As Read 3' C.W.
(uR/hr) 374 3-(cpm) 1,345 Contact (cpm) 9,900 (net cpm) 493 (uCi/ml) 2.6E-07 (net cpm) 2,011 507 As Read As Read 6 4 657 2,365 16,017 791 4.2E-07 3,223 508 As Read As Read As Read As Read 209 754 6,102 311 1.6E-07 1,268 509 As Read As Read As Read As Read As Read As Read 374 19 L.OE-08 78 529 As Read As Read As Read As Read 17 As Read 542 28 1.5E-08 113 530 As Read AsRead As Read As Read 171 614 4,599 230 1.2E-07 936 531 As Read As Read 4 3 502 1,808 11,649 570 3.OE-07 2,322 532 As Read As Read As Read As Read 286 1,029 7,838 396 2.1E-07 1,612 533 As Read As Read As Read As Read 40 As Read 1,247 64 3.4E-08 262 554 As Read As Read As Read As Read 17 As Read 520 27 1.4E-08 108 555 As Read As Read As Read As Read 116 416 3,069 154 8.1E-08 626 556 As Read As Read As Read As Read 195 703 4,990 249 1.3E-07 1,014 557 As Read As Read As Read As Read 64 229 1,962 101 5.3E-08 411 558 As Read As Read As Read As Read As Read As Read As Read 9 4.9E-09 As Read 579 As Read As Read As Read As Read As Read As Read 262 13 7.OE-09 54 580 As Read AsRead AsRead As Read 22 As Read 653 33 1.8E-08 136 581 As Read As Read As Read As Read 23 As Read 737 38 2.OE-08 155 582 As Read As Read As Read As Read As Read As Read 218 11 6.OE-09 As Read 603 As Read As Read As Read As Read As Read As Read As Read 8 4.3E-09 As Read 604 As Read As Read As Read As Read As Read As Read As Read 9 4.8E-09 As Read 605 As Read As Read As Read As Read As Read As Read As Read 6 3.2E-09 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-7 7/12/2002
- 4) )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 11:30 Drill Time : 04:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet - Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3' C.W. a Contact Point (mR/hr) F (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 3 As Read 31 23 2669 9,607 >50,000 1,047 5.6E-07 4,445 361 As Read As Read 10 8 927 3,338 28,969 307 1.6E-07 1,304 362 As Read As Read 11 8 1075 3,869 30,160 808 4.3E-07 3,429 385 As Read As Read 5 4 467 1,682 14,802 147 7.8E-08 623 386 4 As Read 32 24 2927 10,538 >50,000 1,865 9.9E-07 7,915 409 As Read As Read 3 As Read 282 1,016 9,146 87 4.6E-08 369 410 As Read As Read 24 18 2227 8,017 >50,000 1,191 6.3E-07 5,055 411 As Read As Read As Read As Read 216 778 5,710 168 8.9E-08 712 432 As Read As Read As Read As Read As Read As Read 213 As Read <3E-9 As Read 433 As Read As Read As Read As Read 189 679 6,245 58 3.1E-08 244 434 As Read As Read 15 12 1375 4,949 41,882 664 3.5E-07 2,818 435 As Read AsRead 8 6 733 2,637 21,058 536 2.8E-07 2,273 456 As Read As Read As Read As Read As Read As Read 268 As Read <3E-9 As Read 457 As Read As Read AsRead As Read 133 481 4,508 41 2.IE-08 172 458 As Read As Read 10 8 865 3,114 27,076 391 2.1E-07 1,660 459 As Read As Read 11 8 1065 3,835 29,742 659 3.5E-07 2,796 460 As Read As Read As Read As Read 81 293 2,251 69 3.7E-08 295 480 As Read As Read As Read As Read As Read As Read 284 As Read <3E-9 As Read 481 As Read AsRead As Read As Read 99 358 3,414 30 1.6E-08 128 482 As Read As Read 7 5 576 2,073 18,491 248 1.3E-07 1,054 483 As Read As Read 10 8 1049 3,775 28,911 571 3.OE-07 2,424 484 As Read As Read As Read As Read 249 897 7,325 204 1.1E-07 865 485 As Read As Read As Read As Read As Read As Read As Read As Read 3.1E-09 As Read 504 As Read As Read As Read As Read As Read As Read 205 As Read <3E-9 As Read 505 As Read As Read As Read As Read 71 255 2,449 27 1.4E-08 114
- FOR CONTROLLERIOBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-8 7/12/2002
4)
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 11:30 Drill Time : 04:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) I (mRhr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 506 As Read As Read 5 3 380 1,368 12,486 165 8.7E-08 700 507 As Read As Read 9 7 865 3,115 24,296 440 2.3E-07 1,867 508 As Read As Read 5 4 451 1,623 12,773 319 1.7E-07 1,353 509 As Read As Read As Read As Read 40 As Read 1,179 38 2.0E-08 160 529 As Read As Read As Read As Read 34 As Read 1,171 31 1.6E-08 132 530 As Read As Read As Read As Read 226 813 7,425 150 8.OE-08 641 531 As Read As Read 7 5 654 2,354 18,669 371 2.OE-07 1,577 532 As Read As Read 6 4 569 2,050 15,413 363 1.9E-07 1,542 533 As Read As Read As Read As Read 110 394 3,356 100 5.3E-08 424 553 As Read As Read As Read As Read 22 As Read 757 33 1.7E-08 140 554 As Read As Read As Read As Read 116 416 3,708 147 7.8E-08 629 555 As Read As Read 4 3 400 1,440 11,203 375 2.OE-07 1,603 556 As Read As Read 5 4 573 2,061 14,701 445 2.4E-07 1,900 557 As Read As Read As Read As Read 208 750 6,172 196 1.OE-07 835 558 As Read As Read AsRead As Read 23 AsRead 718 25 1.3E-08 107 577 As Read As Read As Read As Read 21 AsRead 708 31 1.7E-08 133 578 As Read As Read As Read As Read 91 328 2,950 130 6.9E-08 558 579 As Read As Read As Read As Read 288 1,036 7,912 342 1.8E-07 1,464 580 As Read As Read 4 3 477 1,718 11,726 486 2.6E-07 2,081 581 As Read As Read As Read As Read 274 985 7,728 315 1.7E-07 1,347 582 As Read As Read As Read As Read 58 210 1,888 77 4.1E-08 328 583 As Read As Read As Read As Read As Read As Read As Read As Read 3.1E-09 As Read 601 As Read As Read As Read As Read 18 As Read 625 28 1.5E-08 118 602 As Read As Read As Read As Read 74 267 2,439 108 5.7E-08 462 603 As Read As Read As Read As Read 232 835 6,537 286 1.5E-07 1,224
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-9 7/12/2002
-1 1, I Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 11:30 Drill Time : 04:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 37 Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 604 As Read As Read 4 As Read 434 1,562 10,559 454 2.4E-07 1,944 605 As Read As Read 3 As Read 331 1,192 8,741 382 2.OE-07 1,637 606 As Read As Read As Read As Read 103 373 3,285 147 7.8E-08 631 607 As Read As Read As Read As Read As Read As Read 495 22 1.2E-08 95 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-10 7/12/2002
11 41 -
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 11:45 Drill Time: 04:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mr) (net cpm) 337 3 As Read 31 24 2676 9,632 >50,000 374 2.OE-07 1,652 361 As Read As Read 10 8 900 3,240 29,074 97 5.1E-08 428 362 As Read As Read 15 11 1418 5,106 41,267 565 3.OE-07 2,493 385 As Read As Read 5 4 449 1,615 14,719 44 2.3E-08 194 386 4 3 38 29 OSH 12,253 >50,000 997 5.3E-07 4,402 387 As Read As Read As Read As Read 29 As Read 220 As Read <3E-9 As Read 409 As Read As Read 3 As Read 270 973 9,049 25 1.3E-08 111 410 3 As Read 27 21 2370 8,533 >50,000 543 2.9E-07 2,396 411 As Read As Read 3 As Read 307 1,106 8,430 132 7.OE-08 582 432 As Read As Read As Read As Read As Read As Read 202 As Read <3E-9 As Read 433 As Read As Read As Read As Read 180 650 6,159 16 8.6E-09 72 434 As Read As Read 16 13 1398 5,033 45,007 272 1.4E-07 1,202 435 As Read As Read 10 8 958 3,447 27,665 342 1.8E-07 1,509 436 As Read As Read As Read As Read 18 As Read 314 As Read 3.OE-09 As Read 456 As Read As Read As Read As Read As Read As Read 255 As Read <3E-9 As Read 457 As Read As Read As Read As Read 128 461 4,436 11 5.9E-09 As Read 458 As Read As Read 10 8 861 3,098 28,451 149 7.9E-08 656 459 As Read As Read 13 10 1266 4,558 36,167 363 1.9E-07 1,602 460 As Read As Read As Read As Read 123 442 3,461 58 3.1E-08 255 480 As Read As Read As Read As Read As Read As Read 273 As Read <3E-9 As Read 481 As Read As Read As Read As Read 96 345 3,355 8 4.3E-09 As Read 482 As Read As Read 7 5 567 2,042 19,148 89 4.7E-08 393 483 As Read As Read 12 9 1149 4,137 33,353 282 1.5E-07 1,245 484 As Read As Read 4 As Read 351 1,265 10,219 143 7.6E-08 634 485 As Read As Read As Read As Read As Read As Read 305 As Read 3.2E-09 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-11 7/12/2002
A)
I) 4)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 11:45 Drill Time : 04:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. .W. O.W. C.W. 3C.W.' Contact Point (mR/hr) (mR/hr) (Rh (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 504 As Read As Read As Read As Read As Read As Read 204 As Read <3E-9 As Read 505 As Read As Read As Read As Read 69 249 2,442 7 3.9E-09 As Read 506 As Read As Read 5 4 375 1,349 12,863 57 3.OE-08 252 507 As Read As Read 10 8 897 3,231 27,064 200 1.1E-07 882 508 As Read As Read 6 5 592 2,132 16,594 197 1.OE-07 872 509 As Read As Read As Read As Read 63 226 1,866 33 1.7E-08 144 529 As Read As Read As Read As Read 36 As Read 1,284 9 4.6E-09 AsRead 530 As Read As Read As Read As Read 234 841 8,075 52 2.8E-08 232 531 As Read As Read 8 6 671 2,416 20,942 162 8.6E-08 717 532 As Read As Read 7 5 698 2,513 19,186 205 1.1E-07 905 533 As Read As Read As Read As Read 163 588 4,904 75 4.0E-08 332 534 As Read As Read As Read As Read As Read As Read 269 As Read <3E-9 As Read 553 As Read As Read As Read As Read 26 As Read 901 9 4.6E-09 As Read 554 As Read As Read As Read As Read 132 477 4,579 50 2.7E-08 223 555 As Read As Read 5 4 441 1,589 14,059 164 8.7E-08 726 556 As Read As Read 7 5 701 2,525 19,377 246 1.3E-07 1,090 557 As Read As Read 3 As Read 311 1,118 9,020 138 7.3E-08 610 558 As Read As Read As Read As Read 38 As Read 1,207 23 1.2E-08 102 577 As Read As Read As Read As Read 24 As Read 837 8 4.2E-09 As Read 578 As Read As Read As Read As Read 106 381 3,690 42 2.2E-08 187 579 As Read As Read 4 As Read 325 1,171 10,516 142 7.5E-08 632 580 As Read As Read 6 5 599 2,156 16,878 261 1.4E-07 1,160 581 As Read As Read 4 3 432 1,555 12,336 217 1.2E-07 965 582 As Read As Read As Read As Read 104 376 3,344 68 3.6E-08 301 583 As Read As Read As Read As Read As Read As Read 284 7 3.5E-09 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-12 7/12/2002
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 11:45 Drill Time: 04:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 37 Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 601 As Read As Read As Read As Read 21 As Read 731 7 3.5E-09 As Read 602 As Read As Read As Read As Read 86 309 3,012 33 1.7E-08 147 603 As Read As Read 3 As Read 259 932 8,558 112 5.9E-08 498 604 As Read As Read 5 4 519 1,869 14,999 230 1.2E-07 1,020 605 As Read As Read 5 4 511 1,840 14,050 250 1.3E-07 1,111 606 As Read As Read As Read As Read 192 690 5,989 125 6.6E-08 554 607 As Read As Read As Read As Read 31 As Read 1,027 24 1.3E-08 108 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-13 7/12/2002
, )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 12:00 Drill Time: 05:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3ý Contact Point (mR/hr) (mRPhr) (mR/hr) (mR/hr) (uR/hr) (cpm) r (cpm) (net cpm) (uCi/ml) (net cpm) 337 3 As Read 30 23 2514 9,052 >50,000 121 6.4E-08 554 361 As Read As Read 10 8 823 2,962 27,600 23 1.2E-08 108 362 As Read As Read 20 15 1917 6,901 >50,000 675 3.6E-07 3,104 385 As Read As Read 5 4 408 1,467 13,910 9 4.9E-09 As Read 386 5 4 41 32 OSH 13,032 >50,000 678 3.6E-07 3,116 387 As Read As Read As Read As Read 45 As Read 434 8 4.1E-09 As Read 409 As Read As Read 3 As Read 246 886 8,537 As Read <3E-9 As Read 410 As Read As Read 27 21 2271 8,177 >50,000 264 1.4E-07 1,214 411 As Read As Read 5 4 482 1,736 12,728 193 1.OE-07 887 433 As Read As Read As Read As Read 165 595 5,807 As Read <3E-9 As Read 434 As Read As Read 16 12 1298 4,672 44,294 106 5.6E-08 488 435 As Read As Read 12 9 1222 4,400 33,988 324 1.7E-07 1,490 436 As Read As Read As Read As Read 36 As Read 677 15 7.8E-09 68 456 As Read As Read As Read As Read As Read As Read 238 As Read <3E-9 As Read 457 As Read As Read As Read As Read 118 425 4,181 As Read <3E-9 As Read 458 As Read As Read 10 8 793 2,856 27,600 49 2.6E-08 227 459 As Read As Read 14 11 1356 4,882 39,859 254 1.3E-07 1,166 460 As Read As Read As Read As Read 213 766 5,586 93 4.9E-08 427 480 As Read As Read As Read As Read As Read As Read 255 As Read <3E-9 As Read 481 As Read As Read As Read As Read 89 319 3,161 As Read <3E-9 As Read 482 As Read As Read 7 5 523 1,884 18,427 26 1.4E-08 121 483 As Read As Read 13 10 1103 3,971 34,645 157 8.3E-08 724 484 As Read As Read 5 4 519 1,870 13,752 164 8.7E-08 752 485 As Read As Read As Read As Read 28 As Read 659 15 7.8E-09 68 505 As Read As Read As Read As Read 64 232 2,305 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-14 7/12/2002
- 4) 4)l I Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:00 Drill Time : 05:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. CW. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 506 As Read As Read 4 3 347 1,251 12,328 15 7.9E-09 69 507 As Read As Read 10 8 822 2,960 27,229 93 5.OE-08 429 508 As Read As Read 7 6 744 2,680 19,900 173 9.2E-08 794 509 As Read As Read As Read As Read 117 421 3,159 56 3.OE-08 258 529 As Read As Read As Read As Read 34 As Read 1,224 As Read <3E-9 As Read 530 As Read As Read As Read As Read 219 787 7,782 11 5.9E-09 51 531 As Read As Read 8 6 609 2,192 20,812 61 3.2E-08 282 532 As Read As Read 8 6 754 2,715 21,327 141 7.5E-08 650 533 As Read As Read As Read As Read 268 965 7,068 96 5.1E-08 443 534 As Read As Read As Read As Read 21 As Read 579 13 7.OE-09 61 553 As Read As Read As Read As Read 24 As Read 867 As Read <3E-9 As Read 554 As Read As Read As Read As Read 126 453 4,483 9 4.9E-09 As Read 555 As Read As Read 5 4 407 1,467 14,127 47 2.5E-08 218 556 As Read As Read 8 6 690 2,484 20,851 122 6.5E-08 563 557 As Read As Read 4 3 449 1,617 11,688 125 6.6E-08 576 558 As Read As Read As Read As Read 74 265 2,097 39 2.1E-08 178 577 As Read As Read As Read As Read 22 As Read 806 As Read <3E-9 As Read 578 As Read As Read As Read As Read 101 365 3,620 8 4.1E-09 As Read 579 As Read As Read 4 As Read 304 1,093 10,618 37 2.OE-08 171 580 AsRead As Read 7 5 569 2,047 18,006 103 5.5E-08 474 581 As Read As Read 5 4 550 1,980 15,026 139 7.3E-08 638 582 As Read As Read As Read As Read 177 637 5,015 75 4.OE-08 344 583 As Read As Read AsRead As Read 19 As Read 582 13 6.8E-09 59 601 As Read As Read As Read As Read 20 As Read 704 As Read <3E-9 As Read 602 As Read As Read As Read As Read 82 297 2,951 6 3.2E-09 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-15 7/12122002
) 5 )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 12:00 Drill Time: 05:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uRlhr) (cpm) co(uCi) (net cpm) 603 As Read As Read 3 As Read 244 879 8,607 28 1.5E-08 130 604 As Read As Read 6 4 481 1,733 15,762 82 4.4E-08 379 605 As Read As Read 6 5 586 2,110 16,374 133 7.1E-08 613 606 As Read As Read As Read As Read 298 1,073 8,235 103 5.5E-08 474 607 As Read As Read As Read As Read 56 203 1,758 32 1.7E-08 150 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-16 7/12/2002
It 41 )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:15 Drill Time: 05:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mRlhr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 3 As Read 29 22 2326 8,372 >50,000 27 1.5E-08 131 361 As Read As Read 9 7 757 2,725 25,956 As Read <3E-9 As Read 362 As Read As Read 21 16 1993 7,174 >50,000 291 1.5E-07 1,390 385 As Read As Read 5 4 376 1,353 13,072 As Read <3E-9 As Read 386 4 3 40 31 OSH 12,333 >50,000 217 1.2E-07 1,037 387 As Read As Read As Read As Read 47 As Read 538 As Read <3E-9 As Read 409 As Read As Read As Read As Read 228 821 8,023 As Read <3E-9 As Read 410 As Read As Read 26 20 2106 7,580 >50,000 71 3.8E-08 340 411 As Read As Read 5 4 531 1,912 14,231 90 4.8E-08 432 433 As Read As Read As Read As Read 154 553 5,457 As Read <3E-9 As Read 434 As Read As Read 15 12 1204 4,336 42,093 25 1.4E-08 122 435 As Read As Read 13 10 1208 4,347 34,803 121 6.4E-08 579 436 As Read As Read As Read As Read 43 As Read 871 9 4.8E-09 As Read 456 As Read As Read As Read As Read As Read As Read 224 As Read <3E-9 As Read 457 As Read As Read As Read As Read 110 396 3,930 As Read <3E-9 As Read 458 As Read As Read 9 7 739 2,660 26,130 11 5.8E-09 52 459 As Read As Read 14 11 1255 4,517 39,143 81 4.3E-08 388 460 As Read As Read As Read As Read 245 883 6,411 45 2.4E-08 216 480 As Read As Read As Read As Read As Read As Read 239 As Read <3E-9 As Read 481 As Read As Read As Read As Read 83 299 2,971 As Read <3E-9 As Read 482 As Read As Read 6 5 489 1,760 17,411 As Read <3E-9 As Read 483 As Read As Read 12 9 1005 3,619 33,402 45 2.4E-08 214 484 As Read As Read 5 4 545 1,962 14,593 67 3.5E-08 319 485 As Read As Read As Read As Read 35 As Read 848 9 4.7E-09 As Read 505 As Read As Read As Read As Read 60 218 2,169 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-17 7/12/2002
AN Al
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:15 Drill Time : 05:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cprm) (cpm) (net cpm) (uCi/ml) (net cpm) 506 AsRead As Read 4 3 326 1,172 11,640 As Read <3E-9 As Read 507 As Read As Read 9 7 755 2,717 26,038 24 1.3E-08 117 508 AsRead As Read 7 6 713 2,567 20,090 61 3.3E-08 294 509 As Read As Read As Read As Read 140 505 3,698 28 1.5E-08 134 529 As Read As Read As Read As Read 32 As Read 1,156 As Read <3E-9 As Read 530 As Read As Read As Read As Read 206 742 7,379 As Read <3E-9 As Read 531 As Read As Read 7 6 567 2,041 19,924 18 9.7E-09 88 532 As Read As Read 8 6 689 2,480 21,018 48 2.6E-08 231 533 As Read As Read As Read As Read 298 1,074 7,739 42 2.2E-08 202 534 As Read As Read As Read As Read 28 As Read 746 8 4.2E-09 As Read 553 As Read As Read As Read As Read 23 As Read 820 As Read <3E-9 As Read 554 As Read As Read As Read As Read 119 430 4,281 As Read <3E-9 As Read 555 As Read As Read 5 4 387 1,394 13,701 19 1.OE-08 92 556 As Read As Read 8 6 642 2,312 20,783 56 3.OE-08 266 557 As Read As Read 5 3 472 1,701 12,550 63 3.3E-08 301 558 As Read As Read As Read As Read 93 336 2,563 23 1.2E-08 109 577 As Read As Read As Read As Read 21 As Read 762 As Read <3E-9 As Read 578 As Read As Read As Read As Read 96 347 3,455 As Read <3E-9 As Read 579 As Read As Read 4 As Read 290 1,044 10,319 15 8.1E-09 73 580 As Read As Read 7 5 539 1,941 18,114 54 2.9E-08 258 581 As Read As Read 6 5 577 2,079 16,319 90 4.8E-08 431 582 As Read As Read As Read As Read 231 830 6,221 58 3.1E-08 276 583 As Read As Read As Read As Read 28 As Read 847 12 6.3E-09 57 601 As Read As Read As Read As Read 19 As Read 666 As Read <3E-9 As Read 602 As Read As Read As Read As Read 78 282 2,812 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-18 7/12/2002
49 4V __
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 12:15 Drill Time: 05:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3' C.W. 3- Contact Point (mRlhr) (mR/hr) (mRhr) I (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCVmI) (net cpm) 603 As Read As Read 3 As Read 233 839 8,326 11 5.7E-09 51 604 As Read As Read 6 4 455 1,638 15,699 40 2.IE-08 193 605 As Read As Read 6 5 583 2,100 17,372 85 4.5E-08 407 606 As Read As Read 4 As Read 377 1,359 9,976 85 4.5E-08 408 607 As Read As Read As Read As Read 86 308 2,535 35 1.8E-08 165 608 As Read As Read As Read As Read As Read As Read 256 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-19 7/12/2002
4)
'I 4)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:30 Drill Time: 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 As Read As Read 27 21 2143 7,715 >50,000 As Read <3E-9 As Read 361 As Read As Read 9 7 695 2,504 24,420 As Read <3E-9 As Read 362 As Read As Read 21 16 1939 6,980 >50,000 78 4.1E-08 385 385 As Read As Read 4 3 347 1,251 12,306 As Read <3E-9 As Read 386 4 3 38 29 OSH 11,148 >50,000 31 1.7E-08 155 387 As Read As Read As Read As Read 54 As Read 608 As Read <3E-9 As Read 409 As Read As Read As Read As Read 212 762 7,556 As Read <3E-9 As Read 410 As Read As Read 24 19 1923 6,921 >50,000 7 3.8E-09 As Read 411 As Read As Read 5 4 559 2,014 14,246 28 1.5E-08 136 433 As Read As Read As Read AsRead 144 517 5,143 As Read <3E-9 As Read 434 As Read As Read 14 11 1113 4,008 39,659 As Read <3E-9 As Read 435 As Read As Read 12 9 1089 3,922 33,157 23 1.2E-08 115 436 As Read As Read As Read As Read 55 As Read 981 As Read <3E-9 As Read 456 As Read As Read As Read As Read As Read As Read 211 As Read <3E-9 As Read 457 As Read As Read As Read As Read 103 371 3,705 As Read <3E-9 As Read 458 As Read As Read 9 7 688 2,477 24,627 As Read <3E-9 As Read 459 As Read As Read 13 10 1093 3,936 36,835 11 6.OE-09 56 460 As Read As Read As Read As Read 280 1,009 6,550 15 7.8E-09 73 480 As Read As Read As Read As Read As Read As Read 226 As Read <3E-9 As Read 481 As Read As Read As Read As Read 78 281 2,802 As Read <3E-9 As Read 482 As Read As Read 6 5 457 1,646 16,414 As Read <3E-9 As Read 483 As Read As Read 11 9 896 3,225 31,418 As Read <3E-9 As Read 484 As Read As Read 5 4 521 1,874 14,119 15 8.OE-09 74 485 As Read As Read As Read As Read 47 As Read 949 As Read <3E-9 As Read 505 As Read As Read As Read As Read 57 205 2,045 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-20 7/12/2002
4W )
Columbia Generating Station . 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 12:30 Drill Time: 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point ( (m RmR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 506 As Read As Read 4 3 305 1,100 10,976 As Read <3E-9 As Read 507 As Read As Read 9 7 689 2,479 24,521 As Read <3E-9 As Read 508 As Read As Read 7 5 611 2,200 18,954 10 5.5E-09 52 509 As Read As Read As Read As Read 172 621 3,844 9 5.OE-09 As Read 529 As Read As Read As Read As Read 30 As Read 1,090 As Read <3E-9 As Read 530 As Read As Read As Read As Read 194 697 6,962 As Read <3E-9 As Read 531 As Read As Read 7 5 525 1,890 18,796 As Read <3E-9 As Read 532 As Read As Read 7 5 585 2,108 19,750 7 3.9E-09 As Read 533 As Read As Read As Read As Read 309 1,112 7,638 11 5.7E-09 54 534 As Read As Read As Read As Read 39 As Read 834 As Read <3E-9 As Read 553 As Read As Read As Read As Read 22 As Read 774 As Read <3E-9 As Read 554 As Read As Read As Read As Read 112 405 4,041 As Read <3E-9 As Read 555 As Read As Read 5 4 361 1,301 12,958 As Read <3E-9 As Read 556 As Read As Read 7 5 563 2,028 19,672 10 5.4E-09 51 557 As Read As Read 4 3 427 1,536 12,144 17 9.OE-09 84 558 As Read As Read As Read As Read 122 441 2,753 9 5.OE-09 As Read 577 As Read As Read As Read As Read 20 As Read 719 As Read <3E-9 As Read 578 As Read As Read As Read As Read 91 326 3,262 As Read <3E-9 As Read 579 As Read As Read 4 As Read 272 979 9,765 As Read <3E-9 As Read 580 As Read As Read 6 5 486 1,751 17,220 10 5.3E-09 As Read 581 As Read As Read 6 4 501 1,803 15,796 25 1.3E-08 125 582 As Read As Read As Read As Read 271 974 6,625 25 1.3E-08 125 583 As Read As Read As Read As Read 43 As Read 1,040 8 4.3E-09 As Read 601 As Read As Read As Read As Read 17 As Read 628 As Read <3E-9 As Read 602 As Read As Read As Read As Read 74 266 2,655 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-21 7/12/2002
I) 7, I)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:30 Drill Time: 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 603 As Read As Read As Read As Read 219 789 7,876 As Read <3E-9 As Read 604 As Read As Read 5 4 418 1,505 14,915 7 3.7E-09 As Read 605 As Read As Read 6 5 500 1,801 16,681 22 1.IE-08 107 606 As Read As Read 4 As Read 386 1,391 10,260 33 1.8E-08 164 607 As Read As Read As Read As Read 122 438 3,016 21 1.IE-08 105 608 As Read As Read As Read As Read As Read As Read 369 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-22 7/12/2002
3 Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. Contact Point (mRFhr) mR(mR/ hmR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 337 As Read As Read 25 20 2004 7,216 >50,000 As Read <3E-9 As Read 361 As Read As Read 8 6 652 2,347 23,106 As Read <3E-9 As Read 362 As Read As Read 20 15 1770 6,371 >50,000 As Read <3E-9 As Read 385 As Read As Read 4 3 326 1,175 11,647 As Read <3E-9 As Read 386 4 As Read 36 28 2860 10,297 >50,000 As Read <3E-9 As Read 387 As Read As Read As Read As Read 48 As Read 574 As Read <3E-9 As Read 409 As Read As Read As Read As Read 200 719 7,154 As Read <3E-9 As Read 410 As Read As Read 23 18 1801 6,483 >50,000 As Read <3E-9 As Read 411 As Read As Read 5 4 510 1,837 13,455 As Read <3E-9 As Read 433 As Read As Read As Read As Read 136 488 4,870 As Read <3E-9 As Read 434 As Read As Read 14 10 1048 3,774 37,538 As Read <3E-9 As Read 435 As Read As Read 11 9 968 3,485 31,187 AsRead <3E-9 As Read 436 As Read As Read As Read As Read 54 As Read 945 As Read <3E-9 As Read 457 As Read As Read As Read As Read 98 351 3,509 As Read <3E-9 As Read 458 As Read As Read 8 6 649 2,338 23,317 As Read <3E-9 As Read 459 As Read As Read 13 10 999 3,597 34,757 As Read <3E-9 As Read 460 As Read As Read As Read As Read 260 938 6,204 As Read <3E-9 As Read 480 As Read As Read As Read As Read As Read As Read 214 As Read <3E-9 As Read 481 As Read As Read As Read As Read 74 266 2,654 As Read <3E-9 As Read 482 As Read As Read 6 4 432 1,556 15,543 As Read <3E-9 As Read 483 As Read As Read 11 8 835 3,006 29,706 As Read <3E-9 As Read 484 As Read As Read 5 4 453 1,633 13,242 As Read <3E-9 As Read 485 As Read As Read As Read As Read 48 As Read 920 As Read <3E-9 As Read 505 As Read As Read As Read As Read 54 As Read 1,937 As Read <3E-9 As Read 506 As Read As Read 4 As Read 289 1,040 10,395 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-23 7/12/2002
I) 4) )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 507 As Read As Read 8 6 648 2,332 23,206 As Read <3E-9 As Read 508 As Read As Read 6 5 538 1,936 17,809 As Read <3E-9 As Read 509 As Read As Read As Read As Read 165 592 3,657 As Read <3E-9 As Read 529 As Read As Read As Read As Read 29 As Read 1,032 As Read <3E-9 As Read 530 As Read As Read As Read As Read 183 660 6,593 As Read <3E-9 As Read 531 As Read As Read 6 5 495 1,784 17,796 As Read <3E-9 As Read 532 As Read As Read 7 5 533 1,919 18,633 As Read <3E-9 As Read 533 As Read As Read As Read As Read 269 970 7,164 As Read <3E-9 As Read 534 As Read As Read As Read AsRead 41 As Read 813 As Read <3E-9 As Read 553 As Read As Read As Read As Read 20 As Read 733 As Read <3E-9 As Read 554 As Read As Read As Read As Read 106 383 3,827 As Read <3E-9 As Read 555 As Read As Read 4 3 341 1,229 12,271 As Read <3E-9 As Read 556 As Read As Read 7 5 523 1,884 18,615 As Read <3E-9 As Read 557 As Read As Read 4 3 367 1,323 11,414 As Read <3E-9 As Read 558 As Read As Read As Read As Read 121 434 2,652 As Read <3E-9 As Read 577 As Read As Read As Read As Read 19 As Read 681 As Read <3E-9 As Read 578 As Read As Read As Read As Read 86 309 3,088 As Read <3E-9 As Read 579 As Read As Read 3 As Read 257 925 9,247 As Read <3E-9 As Read 580 As Read As Read 6 5 456 1,641 16,311 As Read <3E-9 As Read 581 As Read As Read 5 4 443 1,594 14,928 As Read <3E-9 As Read 582 As Read As Read As Read As Read 248 894 6,354 As Read <3E-9 As Read 583 As Read As Read As Read As Read 47 As Read 1,054 As Read <3E-9 As Read 601 As Read As Read As Read As Read 17 As Read 595 As Read <3E-9 As Read 602 As Read As Read As Read As Read 70 251 2,513 As Read <3E-9 As Read 603 As Read As Read As Read As Read 207 746 7,458 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-24 7/12122002
I I)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact m R/h r ) (u R/h r ) (c om j ( nrn1 mn*t r'nmI t, ,t'i ,.,., I I. - + -
Po in t ( m R/hr ) ( mR/ h r ) mh r) r )
(0(
604 As.
d.. d.As.e 4 394 1,417r 14r,128*(,1tAea <3E9 Asc . d) 604 As Read As Read 6 4 4 1,417 14,128 As Read <3E-9 As Read 605 As Read As Read 6 4 452 1,626 15,781 As Read <3E-9 As Read 606 As Read As Read 4 As Read 336 1,211 9,748 6 3.3E-09 As Read 607 As Read As Read As Read As Read 130 469 3,028 As Read <3E-9 As Read 608 As Read As Read As Read As Read 16 As Read 395 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-25 7/12/2002
I 4) )
Columbia Generating Station 2002 Exercise.
ONSITE SURVEY AND SAMPLING DATA Real Time : 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3 Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 As Read As Read 24 19 1883 6,780 >50,000 As Read <3E-9 As Read 361 As Read As Read 8 6 614 2,210 21,950 As Read <3E-9 As Read 362 As Read As Read 19 14 1614 5,810 >50,000 As Read <3E-9 As Read 385 As Read As Read 4 3 309 1,111 11,069 As Read <3E-9 As Read 386 3 As Read 34 26 2661 9,581 >50,000 As Read <3E-9 As Read 387 As Read As Read As Read As Read 52 As Read 567 As Read <3E-9 As Read 409 As Read As Read As Read As Read 189 681 6,801 As Read <3E-9 As Read 410 As Read As Read 22 17 1699 6,115 >50,000 As Read <3E-9 As Read 411 As Read As Read 5 4 460 1,656 12,697 As Read <3E-9 As Read 433 As Read As Read As Read As Read 129 463 4,630 As Read <3E-9 As Read 434 As Read As Read 13 10 993 3,574 35,675 As Read <3E-9 As Read 435 As Read As Read 11 8 858 3,090 29,418 As Read <3E-9 As Read 436 As Read As Read As Read As Read 64 230 944 As Read <3E-9 As Read 457 As Read As Read As Read As Read 93 334 3,336 As Read <3E-9 As Read 458 As Read As Read 8 6 616 2,218 22,165 As Read <3E-9 As Read 459 As Read As Read 12 9 925 3,329 32,948 As Read <3E-9 As Read 460 As Read As Read As Read As Read 238 855 5,860 As Read <3E-9 As Read 480 As Read As Read As Read As Read As Read As Read 203 As Read <3E-9 As Read 481 As Read As Read As Read As Read 70 252 2,523 As Read <3E-9 As Read 482 As Read As Read 5 4 411 1,478 14,777 As Read <3E-9 As Read 483 As Read As Read 10 8 786 2,830 28,211 As Read <3E-9 As Read 484 As Read As Read 4 3 383 1,379 12,411 As Read <3E-9 AsRead 485 As Read As Read As Read As Read 60 216 926 As Read <3E-9 As Read 505 As Read As Read As Read As Read 51 As Read 1,842 As Read <3E-9 As Read 506 As Read As Read 4 As Read 275 989 9,883 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-26 7/12/2002
-1 Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time : 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 507 As Read As Read 8 6 613 2,208 22,053 As Read <3E-9 As Read 508 As Read As Read 6 5 479 1,724 16,810 As Read <3E-9 As Read 509 As Read As Read As Read As Read 154 553 3,465 As Read <3E-9 As Read 529 As Read As Read As Read As Read 27 As Read 981 As Read <3E-9 As Read 530 As Read As Read As Read As Read 174 627 6,268 As Read <3E-9 As Read 531 As Read As Read 6 5 470 1,692 16,915 As Read <3E-9 As Read 532 As Read As Read 6 5 494 1,778 17,665 As Read <3E-9 As Read 533 As Read As Read As Read As Read 220 793 6,679 As Read <3E-9 As Read 534 As Read As Read As Read As Read 53 As Read 822 As Read <3E-9 As Read 553 As Read As Read As Read As Read 19 As Read 696 As Read <3E-9 As Read 554 As Read As Read As Read As Read 101 364 3,637 As Read <3E-9 As Read 555 As Read As Read 4 3 324 1,167 11,662 As Read <3E-9 As Read 556 As Read As Read 6 5 492 1,772 17,674 As Read <3E-9 As Read 557 As Read AsRead 4 As Read 313 1,126 10,717 As Read <3E-9 As Read 558 As Read As Read As Read As Read 116 416 2,525 As Read <3E-9 AsRead 577 As Read As Read As Read As Read 18 As Read 647 As Read <3E-9 As Read 578 As Read As Read As Read As Read 82 294 2,935 As Read <3E-9 As Read 579 As Read As Read 3 As Read 244 879 8,788 As Read <3E-9 As Read 580 As Read As Read 6 4 431 1,551 15,493 As Read <3E-9 As Read 581 As Read As Read 5 4 398 1,433 14,106 As Read <3E-9 As Read 582 As Read As Read As Read As Read 206 740 5,934 As Read <3E-9 As Read 583 As Read As Read As Read As Read 62 221 1,064 As Read <3E-9 As Read 601 As Read As Read As Read As Read 16 As Read 565 As Read <3E-9 As Read 602 As Read As Read As Read As Read 66 239 2,389 As Read <3E-9 As Read 603 As Read As Read As Read As Read 197 709 7,088 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-27 7/12/2002
AN
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3- Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uRlhr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 604 As Read As Read 5 4 373 1,343 13,423 As Read <3E-9 As Read 605 As Read As Read 5 4 418 1,504 14,957 As Read <3E-9 As Read 606 As Read As Read 3 As Read 277 998 9,116 As Read <3E-9 As Read 607 As Read As Read As Read As Read 131 473 2,912 As Read <3E-9 As Read 608 As Read As Read As Read As Read 23 As Read 409 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-28 7/12/2002
4,0
)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 13:15 Drill Time: 06:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3 Contact Point (mRlhr) (((mR r) I mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 337 As Read As Read 23 18 1788 6,438 >50,000 As Read <3E-9 As Read 361 As Read As Read 8 6 584 2,102 20,939 As Read <3E-9 As Read 362 As Read As Read 18 14 1474 5,305 48,781 As Read <3E-9 As Read 385 As Read As Read 4 As Read 294 1,058 10,560 As Read <3E-9 As Read 386 3 As Read 33 25 2520 9,073 >50,000 As Read <3E-9 As Read 387 As Read As Read As Read As Read 45 As Read 525 As Read <3E-9 As Read 409 As Read As Read As Read As Read 180 649 6,489 As Read <3E-9 As Read 410 As Read As Read 21 16 1617 5,821 >50,000 As Read <3E-9 As Read 411 As Read As Read 4 3 401 1,444 11,973 As Read <3E-9 As Read 433 As Read As Read As Read As Read 123 442 4,418 As Read <3E-9 As Read 434 As Read As Read 12 9 946 3,407 34,035 As Read <3E-9 As Read 435 As Read As Read 10 8 796 2,867 27,980 As Read <3E-9 As Read 436 As Read As Read As Read As Read 58 210 891 As Read <3E-9 As Read 457 As Read AsRead As Read As Read 88 318 3,184 As Read <3E-9 As Read 458 As Read As Read 8 6 588 2,116 21,148 As Read <3E-9 As Read 459 As Read As Read 11 9 877 3,156 31,409 As Read <3E-9 As Read 460 As Read As Read As Read As Read 200 721 5,494 As Read <3E-9 As Read 481 As Read As Read As Read As Read 67 241 2,408 As Read <3E-9 As Read 482 As Read As Read 5 4 392 1,410 14,100 As Read <3E-9 AsRead 483 As Read As Read 10 7 748 2,694 26,908 As Read <3E-9 As Read 484 As Read As Read 4 3 345 1,240 11,762 As Read <3E-9 As Read 485 As Read As Read As Read As Read 55 As Read 874 As Read <3E-9 As Read 505 As Read As Read As Read As Read 49 As Read 1,758 As Read <3E-9 As Read 506 As Read As Read 3 As Read 262 943 9,431 As Read <3E-9 As Read 507 As Read As Read 8 6 585 2,105 21,038 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-29 7/12/2002
A) Al)
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Drill Time : 06:15 Real Time : 13:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross 3 feet Contact Iodine Conc. Part.
Field Monitor OW. C.W. OW. C.W. 3 C.W. 3'Contact (mR/hr) T (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm)
Point (mR/hr) (mR/hr)
As Read 6 4 449 1,617 16,007 As Read <3E-9 As Read 508 As Read As Read As Read As Read 126 455 3,232 As Read <3E-9 As Read 509 As Read As Read As Read 26 As Read 936 As Read <3E-9 As Read 529 As Read As Read As Read As Read As Read 166 598 5,980 As Read <3E-9 As Read 530 As Read As Read 6 4 448 1,614 16,137 As Read <3E-9 As Read 531 As Read As Read 6 5 469 1,689 16,843 As Read <3E-9 As Read 532 As Read As Read As Read As Read 191 689 6,302 As Read <3E-9 As Read 533 As Read As Read As Read As Read 48 As Read 775 As Read <3E-9 As Read 534 As Read As Read As Read As Read 18 As Read 664 As Read <3E-9 As Read 553 As Read As Read As Read As Read 96 347 3,469 As Read <3E-9 As Read 554 As Read As Read 4 3 309 1,113 11,124 As Read <3E-9 AsRead 555 As Read As Read 6 5 469 1,687 16,855 As Read <3E-9 As Read 556 As Read As Read 4 As Read 289 1,039 10,187 As Read <3E-9 As Read 557 As Read As Read As Read As Read 94 340 2,351 As Read <3E-9 As Read 558 As Read As Read As Read As Read As Read 17 As Read 617 As Read <3E-9 As Read 577 As Read As Read As Read As Read 78 280 2,800 As Read <3E-9 As Read 578 579 As Read As Read 3 As Read 233 838 8,382 As Read <3E-9 As Read 580 As Read As Read 5 4 411 1,478 14,776 As Read <3E-9 As Read 581 As Read As Read 5 4 375 1,351 13,437 As Read <3E-9 As Read 582 As Read As Read As Read As Read 175 628 5,580 As Read <3E-9 As Read 583 As Read As Read As Read As Read 56 203 1,007 As Read <3E-9 As Read 601 As Read As Read As Read As Read As Read As Read 539 As Read <3E-9 As Read 602 As Read As Read As Read As Read 63 228 2,279 As Read <3E-9 As Read 603 As Read As Read As Read As Read 188 676 6,761 As Read <3E-9 As Read 604 As Read As Read 5 4 356 1,280 12,802 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-30 7/12/2002
9 Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 13:15 Drill Time: 06:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. S Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 605 As Read As Read 5 4 397 1,428 14,257 As Read <3E-9 As Read 606 As Read As Read 3 As Read 249 895 8,635 As Read <3E-9 As Read 607 As Read As Read As Read As Read 110 394 2,720 As Read <3E-9 As Read 608 As Read As Read As Read As Read 26 As Read 403 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-31 7/12/2002
4, 4) )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 13:30 Drill Time : 06:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W 3' C.W. 3 Contact Point (mRlhr) I (mR/hr) mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 337 As Read As Read 22 17 1706 6,143 >50,000 As Read <3E-9 As Read 361 As Read As Read 7 6 558 2,008 20,041 As Read <3E-9 As Read 362 As Read As Read 17 13 1364 4,909 46,508 As Read <3E-9 As Read 385 As Read As Read 4 AsRead 281 1,012 10,109 AsRead <3E-9 As Read 386 3 As Read 31 24 2403 8,650 >50,000 As Read <3E-9 As Read 387 As Read As Read As Read As Read 39 As Read 487 As Read <3E-9 As Read 409 As Read As Read As Read As Read 173 621 6,212 As Read <3E-9 As Read 410 As Read As Read 20 15 1546 5,565 >50,000 As Read <3E-9 As Read 411 AsRead As Read 4 3 356 1,280 11,354 As Read. <3E-9 As Read 433 As Read As Read As Read As Read 118 423 4,230 As Read <3E-9 As Read 434 As Read As Read 12 9 905 3,259 32,577 As Read <3E-9 As Read 435 As Read As Read 10 7 751 2,705 26,735 As Read <3E-9 As Read 436 As Read As Read As Read As Read 51 As Read 836 As Read <3E-9 As Read 457 As Read As Read As Read As Read 85 305 3,048 As Read <3E-9 As Read 458 As Read As Read 7 6 562 2,025 20,243 As Read <3E-9 As Read 459 As Read As Read 11 8 836 3,011 30,050 As Read <3E-9 As Read 460 As Read As Read As Read As Read 171 617 5,183 As Read <3E-9 As Read 481 As Read As Read As Read As Read 64 231 2,305 As Read <3E-9 As Read 482 As Read As Read 5 4 375 1,350 13,497 As Read <3E-9 As Read 483 As Read As Read 9 7 716 2,577 25,751 As Read <3E-9 As Read 484 As Read As Read 4 3 319 1,149 11,217 As Read <3E-9 As Read 485 As Read As Read As Read As Read 47 As Read 818 As Read <3E-9 As Read 505 As Read As Read As Read As Read 47 As Read 1,683 As Read <3E-9 As Read 506 As Read As Read 3 As Read 251 903 9,028 As Read <3E-9 As Read 507 As Read As Read 7 6 559 2,014 20,136 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-32 7/12/2002
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 13:30 Drill Time: 06:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3'C.W.3' Contact Point (mR/hr) (mR/hr) (mR/hr) I (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 508 As Read As Read 6 4 427 1,537 15,306 As Read <3E-9 As Read 509 As Read As Read As Read As Read 105 377 3,034 As Read <3E-9 As Read 529 As Read As Read As Read As Read 25 As Read 896 As Read <3E-9 As Read 530 As Read As Read As Read As Read 159 572 5,724 As Read <3E-9 As Read 531 As Read As Read 6 4 429 1,545 15,445 As Read <3E-9 AsRead 532 As Read As Read 6 4 448 1,613 16,116 As Read <3E-9 AsRead 533 As Read As Read As Read As Read 173 624 5,995 As Read <3E-9 As Read 534 As Read As Read As Read As Read 41 As Read 722 As Read <3E-9 As Read 553 As Read As Read As Read As Read 18 As Read 636 As Read <3E-9 As Read 554 As Read As Read As Read As Read 92 332 3,320 As Read <3E-9 As Read 555 As Read As Read 4 As Read 296 1,065 10,646 As Read <3E-9 As Read 556 As Read As Read 6 4 448 1,613 16,128 As Read <3E-9 As Read 557 As Read As Read 4 As Read 272 980 9,733 As Read <3E-9 As Read 558 As Read As Read As Read As Read 77 278 2,201 As Read <3E-9 As Read 577 As Read As Read As Read As Read 16 As Read 591 As Read <3E-9 As Read 578 As Read As Read As Read As Read 74 268 2,679 As Read <3E-9 As Read 579 As Read As Read As Read As Read 223 802 8,021 As Read <3E-9 As Read 580 As Read As Read 5 4 393 1,414 14,138 As Read <3E-9 As Read 581 As Read As Read 5 4 358 1,287 12,851 As Read <3E-9 As Read 582 As Read As Read As Read As Read 155 559 5,296 As Read <3E-9 As Read 583 As Read As Read As Read As Read 48 As Read 940 As Read <3E-9 As Read 601 As Read As Read As Read As Read As Read As Read 516 As Read <3E-9 As Read 602 As Read As Read As Read As Read 61 218 2,181 As Read <3E-9 As Read 603 As Read As Read As Read As Read 180 647 6,470 As Read <3E-9 As Read 604 As Read As Read 4 3 340 1,225 12,249 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-33 7112/2002
2002 Exercise Columbia Generating Station ONSITE SURVEY AND SAMPLING DATA Drill Time : 06:30 Real Time: 13:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross 3 feet Contact Iodine Conc. Part.
Field Monitor O.W. C.W. O.W. C.W. 3' C.W. 37 Contact (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm)
Point (mR/hr)
As Read 5 4 379 1,365 13,639 As Read <3E-9 As Read 605 As Read As Read As Read As Read 232 835 8,240 As Read <3E-9 As Read 606 As Read As Read As Read As Read 90 322 2,547 As Read <3E-9 As Read 607 As Read As Read As Read 25 As Read 388 As Read <3E-9 As Read 608 As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read OTHERS As Read As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-34 7/12/2002
I 44) )
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Drill Time: 06:45 Real Time: 13:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mRPhr) (mRlhr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 337 As Read As Read 21 16 1636 5,889 >50,000 As Read <3E-9 As Read 361 As Read As Read 7 5 535 1,926 19,239 AsRead <3E-9 As Read 362 As Read As Read 16 12 1284 4,621 44,540 As Read <3E-9 As Read 385 As Read As Read 4 As Read 270 971 9,705 As Read <3E-9 As Read 386 As Read As Read 30 23 2303 8,291 >50,000 As Read <3E-9 As Read 387 As Read As Read As Read As Read 28 As Read 435 As Read <3E-9 As Read 409 As Read As Read As Read As Read 166 597 5,964 As Read <3E-9 As Read 410 As Read As Read 19 15 1483 5,340 >50,000 As Read <3E-9 As Read 411 As Read As Read 4 3 327 1,178 10,844 AsRead <3E-9 As Read 433 As Read As Read As Read As Read 113 406 4,061 AsRead <3E-9 As Read 434 As Read As Read 11 9 869 3,128 31,273 As Read <3E-9 As Read 435 As Read As Read 9 7 718 2,585 25,647 As Read <3E-9 As Read 436 As Read As Read As Read As Read 39 As Read 767 As Read <3E-9 As Read 457 As Read As Read As Read As Read 81 293 2,926 As Read <3E-9 As Read 458 As Read As Read 7 5 540 1,944 19,433 As Read <3E-9 As Read 459 As Read As Read 10 8 802 2,888 28,840 As Read <3E-9 As Read 460 As Read As Read As Read As Read 155 557 4,939 As Read <3E-9 As Read 481 As Read As Read As Read As Read 61 221 2,213 As Read <3E-9 As Read 482 As Read As Read 5 4 360 1,296 12,957 As Read <3E-9 As Read 483 As Read As Read 9 7 687 2,473 24,718 As Read <3E-9 As Read 484 As Read As Read 4 As Read 304 1,093 10,755 As Read <3E-9 As Read 485 As Read As Read As Read As Read 37 As Read 754 As Read <3E-9 As Read 505 As Read As Read As Read As Read 45 As Read 1,616 As Read <3E-9 As Read 506 As Read As Read 3 As Read 241 867 8,667 As Read <3E-9 As Read 507 As Read As Read 7 5 537 1,933 19,329 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-35 7/12/2002
2002 Exercise Columbia Generating Station ONSITE SURVEY AND SAMPLING DATA Drill Time : 06:45 Real Time : 13:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Iodine Conc. Part.
Field 3 feet Contact C.W. O.W. C.W. 3' C.W. 3' Contact Monitor O.W. -.... ....... "* nU_ cnx. (CnM) (net enm) (ui/ml) (net corn)
Point (mR/hr) (mRlhr) (mR/ r)r) mC) t urIm7 ," .... I kI"'L I"1L,-.....-,-" ..."
-m'"I 409 1,473 14,688 As Read <3E-9 As Read 508 As Read As Read 5 4 93 336 2,885 As Read <3E-9 As Read 509 As Read As Read As Read As Read 24 As Read 860 As Read <3E-9 As Read 529 As Read As Read As Read As Read 153 550 5,495 As Read <3E-9 As Read 530 As Read As Read As Read As Read 4 412 1,483 14,826 As Read <3E-9 As Read 531 As Read As Read 5 430 1,548 15,467 As Read <3E-9 As Read 532 As Read As Read 6 4 164 590 5,744 As Read <3E-9 As Read 533 As Read As Read As Read As Read 32 As Read 667 As Read <3E-9 As Read 534 As Read As Read As Read As Read 17 As Read 610 As Read <3E-9 As Read 553 As Read As Read As Read As Read 89 319 3,187 As Read <3E-9 As Read 554 As Read As Read As Read As Read 284 1,022 10,218 As Read <3E-9 As Read 555 As Read As Read 4 As Read 4 430 1,548 15,479 As Read <3E-9 As Read 556 As Read As Read 6 261 938 9,337 As Read <3E-9 As Read 557 As Read As Read 3 As Read 68 246 2,092 As Read <3E-9 As Read 558 As Read As Read As Read As Read 16 As Read 567 As Read <3E-9 As Read 577 As Read As Read As Read As Read As Read 71 257 2,571 As Read <3E-9 As Read 578 As Read As Read As Read 214 770 7,698 As Read <3E-9 As Read 579 As Read As Read As Read As Read 4 377 1,357 13,567 As Read <3E-9 As Read 580 As Read As Read 5 3 343 1,234 12,330 As Read <3E-9 As Read 581 As Read As Read 4 As Read 146 526 5,071 As Read <3E-9 As Read 582 As Read As Read As Read As Read 38 As Read 875 As Read <3E-9 As Read 583 As Read As Read As Read As Read As Read As Read 495 As Read <3E-9 As Read 601 As Read As Read As Read As Read 58 209 2,093 As Read <3E-9 As Read 602 As Read As Read As Read As Read 172 621 6,209 As Read <3E-9 As Read 603 As Read As Read As Read 4 3 327 1,176 11,755 As Read <3E-9 As Read 604 As Read As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-36 7/12/2002
2002 Exercise Columbia Generating Station ONSITE SURVEY AND SAMPLING DATA Drill Time: 06:45 Real Time : 13:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Contact Iodine Conc. Part.
Field 3 feet Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm)
Point (mR/hr) 5 4 364 1,309 13,088 As Read <3E-9 As Read 605 As Read As Read As Read As Read As Read 221 796 7,901 As Read <3E-9 As Read 606 As Read As Read As Read 79 285 2,419 As Read <3E-9 As Read 607 As Read As Read As Read As Read 20 As Read 356 As Read <3E-9 As Read 608 As Read As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read OTHERS As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-37 7/12/2002
A) 2002 Exercise Columbia Generating Station ONSITE SURVEY AND SAMPLING DATA Drill Time: 07:00 Real Time : 14:00 Micro-R Meter Frisker Gross Gross Iodine Gross Survey Meter (RO-2A)
Iodine Conc. Part.
Field 3 feet Contact C.W. OW. C.W. 3' C.W. 3' Contact Monitor O.W.
(uR/hr) (cpm) (cpm) (net cpm) (uCi/rn) (net cpm)
Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) 16 1573 5,663 >50,000 As Read <3E-9 As Read 337 As Read As Read 20 515 1,854 18,519 As Read <3E-9 AsRead 361 As Read As Read 7 5 1219 4,387 42,798 As Read <3E-9 AsRead 362 As Read As Read 15 12 260 935 9,342 As Read <3E-9 As Read 385 As Read As Read 3 As Read 2214 7,971 >50,000 As Read <3E-9 As Read 386 As Read As Read 29 22 22 As Read 398 As Read <3E-9 As Read 387 As Read As Read As Read As Read 159 574 5,741 As Read <3E-9 As Read 409 As Read As Read As Read As Read 1427 5,138 >50,000 AsRead <3E-9 As Read 410 As Read As Read 19 14 306 1,100 10,400 As Read <3E-9 As Read 411 As Read As Read 4 As Read 109 391 3,909 As Read <3E-9 As Read 433 As Read As Read As Read As Read 836 3,011 30,100 As Read <3E-9 As Read 434 As Read As Read 11 8 7 689 2,480 24,672 As Read <3E-9 As Read 435 As Read As Read 9 32 As Read 714 As Read <3E-9 As Read 436 As Read As Read As Read As Read 78 282 2,817 As Read <3E-9 As Read 457 As Read As Read As Read As Read 520 1,871 18,705 As Read <3E-9 As Read 458 As Read As Read 7 5 8 772 2,778 27,753 As Read <3E-9 As Read 459 As Read As Read 10 As Read 143 514 4,729 As Read <3E-9 As Read 460 As Read As Read As Read As Read 59 213 2,131 AsRead <3E-9 AsRead 481 As Read As Read As Read 3 346 1,247 12,472 As Read <3E-9 As Read 482 As Read As Read 5 7 661 2,379 23,788 As Read <3E-9 As Read 483 As Read As Read 9 As Read 290 1,046 10,342 As Read <3E-9 As Read 484 As Read As Read 4 As Read 30 As Read 705 As Read <3E-9 As Read 485 As Read As Read As Read As Read 43 As Read 1,555 As Read <3E-9 As Read 505 As Read As Read As Read As Read 232 834 8,343 As Read <3E-9 As Read 506 As Read As Read 3 7 5 517 1,860 18,603 As Read <3E-9 As Read 507 As Read As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.3-38 7/12/2002
2002 Exercise Columbia Generating Station ONSITE SURVEY AND SAMPLING DATA Drill Time: 07:00 Real Time: 14:00 Frisker Gross Gross Iodine Gross Survey Meter (RO-2A) Micro-R Meter Iodine Conc. Part.
Field 3 feet Conttact C.W. 3' C.W. 31 Contact Monitor O.W.-I C.W. O.W. (uCi/mi) (net cpm)
(mR/hr) (uR/hr) (cpm) (cpm) (net cpm)
Point (mR/hr) (mR/hr) (mR/hr) As Read 393 1,416 14,132 As Read <3E-9 As Read 5 4 508 As Read As Read <3E-9 As Read As Read 85 307 2,759 509 As Read As Read As Read <3E-9 As Read As Read 23 As Read 828 As Read 529 As Read As Read As Read As Read 147 529 5,289 As Read <3E-9 As Read As Read As Read 530 As Read As Read <3E-9 As Read 4 396 1,427 14,270 ^AA A -"AOsRead 531 As Read As Read 5 -....... IA e2t, As Read As Read 5 4 414 1,489 562 5,521 As Read <3E-9 As Read 532 156 As Read As Read <3E-9 As Read 533 As Read As Read As Read 26 As Read 625 As Read <3E-9 As Read 534 As Read As Read As Read As Read 16 As Read 587 As Read As Read <3E-9 As Read 553 As Read As Read As Read 2(Y- 3-06~7 554 As Read As Read As Read As Read 5 27 u .,v 0119.83AA-Ra As Read 4 As Read 273 983 14,895 As Read <3.-9 As Read 555 As Read 4 414 1,490 <3E-9 As Read As Read 556 As Read As Read 5 250 901 8,983 As Read <3E-9 As Read 557 As Read As Read 3 224 1,999 As Read As Read 62 <3E-9 As Read 558 As Read As Read As Read As Read 545 As Read <3E-9 is 577 As Read As Read As Read 69 ID/: 247dcau " As As Read As Read As Read 69 247 2,475 7,407 As Read <3h-9 As Read 578 As Read 206 741 As Read As Read <3E-9 As Read 579 As Read As Read As Read 363 1,306 13,055 4 As Read <3E-9 As Read 580 As Read As Read 5 330 1,187 11,863 3 As Read <3E-9 As Read 581 As Read As Read 4 40O A 872 As Read <3E-9 1'AQ 582 As Read As Read As Read AS KRea d- '-" .,- ,IJ9 . .
583 As Read As Read As Read As Read 32 As Readc 824As Readuu--._..
As Read As Read 477 As Read <3E-9 As Read 601 As Read As Read As Read As Read As Read 56 201 2,014 As Read <3E-9 As Read 602 As Read As Read As Read 166 597 5,975 As Read <3E-9 As Read 603 As Read As Read As Read As Read 3 314 1,131 11,311 As Read <3E-9 As Read 604 As Read As Read 4
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-39 7/12/2002
Columbia Generating Station 2002 Exercise ONSITE SURVEY AND SAMPLING DATA Real Time: 14:00 Drill Time: 07:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 605 As Read As Read 5 3 350 1,259 12,592 As Read <3E-9 As Read 606 As Read As Read As Read As Read 212 764 7,599 As Read <3E-9 As Read 607 As Read As Read As Read As Read 72 259 2,312 As Read <3E-9 As Read 608 As Read As Read As Read As Read 15 As Read 330 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.3-40 7/12/2002
2 5 202 2 10 21 F 2 1 21i 28 1 201221 M S,460 32' 3
344 34 346 3 356 460 30' 375 370 377 38 379 3,801 38! .- < 3X(6 9. \90.. .91 392 39 394 409 410 1 +42 413 414 415 416 417/' 419 0 1 422 23S '2 426 27 428 91 44L
- 44 4 44> 4,40 ' 4 442 460 29' 4 /478 479 480 481 482 M14 414 011, 4Z 48 1 Y 9 0 50 51,a15 0 .4Ia.
460 28'V 111-1 2 460 27' Latitude 64 6 649 48 I5 5> 52 51 654 6 55 4 55/5 5I 2 3 6 6 26 681 50,82 6 6483 6 5N 6 86687 l 679 N8 69S 50 9 93 19 )5 6 9 86 998) 460 26' 61 61 '6864)60 62 2 Q./*460 25' -
78 7 883 84 6785 6, 7891 790 Q7688 7069 9. 9, 5 9 67 649 70 7 51 752 54 . 054 0( .F 76 64 664 6 460 24' 717 8 19 718 8271 827 2 4 (2._ 826 7 8 -27 29 8 19 732 831 4 83 783 84 8 7 51 853 52 3 85 754 57,, 612 72 86763 7,S [2 8 64 9 700 8665 3 6788 39 7 7(
460 23'Y 885 884 88 60 17'7888 990 9 (9 724 i194 807 898 '99 90 "Of1 02 8032 919 020 S21 9 82922 23 026 824 9 - 920 82 ST) 8 82 3 3 3 460 22' 953 854 853 T ,55 95786 9)56 61964 863 9 665 9 967 0 978 870 460 21' 98 9 887 98988 991.9S90 9 92 9 99' 696)97 1() 1 900 9013 102 03 91900021 10 [I223 9022 1007J25 ~ 2 s 9N2j 102 033 035 93 36 941 08109 1093 460 20' -
98 98 71 =12202 899099
ý1 4 2.
9j 95-96M M= rN-M M11
_ 5, 713911 0 , 10 I I I I I I I I I I I I IN I I F-11 0 %0 0 ONW ON ON Longitude 10-Mile Emergency Planning Zone (EPZ)
South-West Quadrant O00140SW
Al I) I)
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 10:00 Drill Time: 03:00
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-1 7/12/2002
) ) -)
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 10:15 Drill Time : 03:15
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-2 7/12/2002
2 2002 Exercise Columbia Generating Station OFFSITE SURVEY AND SAMPLING DATA Drill Time : 03:30 Real Time: 10:30
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-3 7/12/2002
I Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 10:45 Drill Time : 03:45
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-4 7/12122002
) ,-- )
2002 Exercise Columbia Generating Station OFFSITE SURVEY AND SAMPLING DATA Drill Time: 04:00 Real Time: 11:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Contact Iodine Conc. Part.
Field 3 feet O.W. C.W. OW. C.W. 3' C.W. 3' Contact Monitor (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCVMI) (net cpm)
Point (mR/hr) (mR/hr)
As Read As Read As Read As Read 10 5.4E-09 As Read 593 As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read OTHERS As Read As Read As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-5 7/12/2002
I 3 )
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 11:15 Drill Time: 04:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read As Read As Read 59 211 1,436 71 3.8E-08 291 593 As Read As Read 4 3 478 1,721 11,905 591 3.1E-07 2,407 626 As Read As Read As Read As Read As Read As Read As Read 9 4.6E-09 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-6 7/12/2002
I) A)
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 11:30 Drill Time: 04:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor Point 560 O.W.
(mR/hr)
As Read C.W.
(mR/hr)
As Read O.W.
(mR/hr)
As Read C.W.
(mR/hr)
As Read 3' C.W.
(uR/hr) 145 3'
(cpm) 523 F Contact (cpm) 3,967 (net cpm) 119 (uCi/mi) 6.3E-08 (net cpm) 504 593 As Read As Read 7 6 757 2,724 20,325 421 2.2E-07 1,787 626 As Read As Read As Read As Read 315 1,133 8,136 352 1.9E-07 1,508 627 As Read As Read As Read As Read As Read As Read 492 22 1.2E-08 96 659 As Read As Read As Read As Read 127 456 3,667 161 8.5E-08 690 660 As Read As Read As Read As Read 88 318 2,815 127 6.7E-08 544 692 As Read As Read As Read As Read As Read As Read As Read 9 4.7E-09 As Read 693 As Read As Read As Read As Read 79 283 2,059 90 4.8E-08 386 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-7 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 11:45 Drill Time: 04:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3 .W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCVmI) (net cpm) 560 As Read As Read As Read As Read 212 763 5,936 95 5.OE-08 419 593 As Read As Read 9 7 832 2,995 23,706 210 1.1E-07 926 626 As Read As Read 4 3 347 1,251 10,923 152 8.1E-08 677 627 As Read As Read As Read As Read 31 As Read 1,041 25 1.3E-08 112 659 As Read As Read As Read As Read 138 498 4,730 60 3.2E-08 267 660 As Read As Read As Read As Read 173 623 5,219 109 5.8E-08 487 692 As Read As Read As Read As Read 40 As Read 1,387 52 2.7E-08 232 693 As Read As Read As Read As Read 216 779 5,488 147 7.8E-08 657 694 As Read As Read As Read As Read As Read As Read 265 8 4.2E-09 As Read 725 As Read As Read As Read As Read 22 As Read 775 32 1.7E-08 145 726 As Read As Read As Read As Read 158 568 3,687 147 7.8E-08 660 727 As Read As Read AsRead As Read 33 AsRead 1,131 48 2.5E-08 214 758 As Read As Read As Read As Read As Read As Read As Read 8 4.3E-09 As Read 759 As Read As Read As Read As Read 83 300 2,001 80 4.2E-08 359 760 As Read As Read As Read As Read 53 As Read 1,667 70 3.7E-08 314 793 As Read As Read As Read As Read 19 As Read 575 24 1.3E-08 108 794 As Read As Read As Read As Read As Read As Read 203 9 4.6E-09 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-8 7/12/2002
)
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time : 12:00 Drill Time: 05:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) I (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 560 As Read As Read 3 As Read 347 1,250 9,134 142 7.5E-08 653 593 As Read As Read 9 7 786 2,829 24,608 113 6.0E-08 521 626 As Read As Read 4 3 322 1,159 11,145 44 2.4E-08 205 627 As Read As Read As Read As Read 56 202 1,770 32 1.7E-08 150 659 As Read As Read As Read As Read 134 482 4,771 16 8.3E-09 72 660 As Read As Read As Read As Read 257 926 6,876 77 4.1E-08 355 692 As Read As Read As Read As Read 45 As Read 1,615 14 7.2E-09 63 693 As Read As Read As Read As Read 263 947 7,087 81 4.3E-08 375 694 As Read As Read As Read As Read As Read As Read 493 10 5.4E-09 As Read 725 As Read As Read As Read As Read 25 AsRead 915 8 4.3E-09 As Read 726 As Read As Read As Read As Read 171 614 5,032 70 3.7E-08 325 727 As Read As Read As Read As Read 70 251 2,241 48 2.6E-08 225 758 As Read As Read As Read As Read As Read As Read 369 8 4.2E-09 As Read 759 As Read As Read As Read As Read 92 331 2,979 49 2.6E-08 229 760 As Read As Read As Read As Read 113 405 3,095 61 3.2E-08 283 761 As Read As Read As Read As Read As Read As Read 251 7 3.6E-09 As Read 791 As Read As Read As Read As Read As Read As Read As Read 7 3.7E-09 As Read 792 As Read As Read As Read As Read 37 As Read 1,231 46 2.4E-08 215 793 As Read As Read As Read As Read 107 384 2,610 81 4.3E-08 379 794 As Read As Read As Read As Read 21 As Read 747 23 1.2E-08 108 825 As Read As Read As Read As Read 21 AsRead 706 28 1.5E-08 133 826 As Read As Read As Read As Read 83 298 1,911 73 3.9E-08 343 827 As Read As Read As Read As Read 34 As Read 1,110 45 2.4E-08 209 858 As Read As Read As Read As Read As Read As Read As Read As Read 3.1E-09 As Read 859 As Read As Read As Read As Read 34 As Read 822 32 1.7E-08 149
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-9 7/12/2002
I)
- 4) I Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:00 Drill Time: 05:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. CW.W OW. C.W. 3! C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) I (cpm) (net cpm) (uCi/ml) (net cpm)
As Read As Read As Read 36 As Read 1,035 41 2.2E-08 194 860 As Read As Read As Read As Read As Read As Read As Read 271 11 6.OE-09 53 861 893 As Read As Read As Read As Read As Read As Read 253 10 5.5E-09 As Read As Read As Read As Read As Read As Read As Read As Read 8 4.4E-09 As Read 894 As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read OTHERS
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-10 7/12/2002
4 Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:15 Drill Time: 05:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 560 As Read As Read 4 As Read 389 1,400 10,281 67 3.5E-08 319 593 As Read As Read 9 7 713 2,567 23,765 34 1.8E-08 163 626 As Read As Read 4 3 306 1,103 10,882 18 9.8E-09 88 627 As Read As Read As Read As Read 87 313 2,580 36 1.9E-08 171 659 As Read As Read As Read As Read 128 461 4,597 As Read <3E-9 As Read 660 As Read As Read As Read As Read 315 1,135 8,079 61 3.3E-08 293 692 As Read As Read As Read As Read 44 As Read 1,587 As Read <3E-9 As Read 693 As Read As Read As Read As Read 249 898 7,555 40 2.1E-08 194 694 As Read As Read As Read As Read 25 As Read 809 14 7.3E-09 66 725 As Read As Read As Read As Read 25 As Read 900 As Read <3E-9 As Read 726 As Read As Read As Read As Read 157 566 5,283 26 1.4E-08 124 727 As Read As Read As Read As Read 110 396 3,063 36 1.9E-08 173 758 As Read As Read As Read As Read As Read As Read 389 As Read <3E-9 As Read 759 As Read As Read As Read As Read 91 326 3,188 17 9.OE-09 82 760 As Read As Read As Read As Read 152 547 3,865 36 1.9E-08 172 761 As Read As Read As Read As Read As Read As Read 425 8 4.1E-09 As Read 791 As Read As Read As Read As Read As Read As Read 200 As Read <3E-9 As Read 792 As Read As Read As Read As Read 43 As Read 1,525 15 8.2E-09 74 793 As Read As Read As Read As Read 132 474 3,544 44 2.3E-08 213 794 As Read As Read As Read As Read 38 As Read 1,230 21 1.1E-08 101 825 As Read As Read As Read As Read 26 As Read 936 11 6.OE-09 54 826 As Read As Read As Read As Read 92 330 2,682 38 2.OE-08 182 827 As Read As Read As Read As Read 68 246 1,983 36 1.9E-08 176 828 As Read As Read As Read As Read As Read As Read 266 6 3.4E-09 As Read 858 As Read As Read As Read As Read As Read As Read 421 12 6.1E-09 56
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-11 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:15 Drill Time: 05:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 859 As Read As Read As Read As Read 51 As Read 1,601 34 1.8E-08 166 860 As Read As Read As Read As Read 78 282 2,035 41 2.2E-08 196 861 As Read As Read As Read As Read 17 As Read 614 14 7.7E-09 70 891 As Read As Read As Read As Read As Read As Read 219 8 4.5E-09 As Read 892 As Read As Read As Read As Read 28 As Read 903 33 1.8E-08 160 893 As Read As Read As Read As Read 68 246 1,597 51 2.7E-08 248 894 As Read As Read As Read As Read 26 As Read 858 27 1.4E-08 130 925 As Read As Read As Read As Read As Read As Read 432 17 8.9E-09 82 926 As Read As Read As Read As Read 45 As Read 1,070 40 2.1E-08 193 927 As Read As Read As Read As Read 32 As Read 946 36 1.9E-08 176 928 As Read As Read As Read As Read As Read As Read 286 11 5.8E-09 54 959 As Read As Read As Read As Read As Read As Read 374 14 7.6E-09 69 960 As Read As Read As Read As Read 23 As Read 595 23 1.2E-08 110 961 As Read As Read As Read As Read As Read As Read 328 13 6.9E-09 64 994 As Read As Read As Read As Read As Read As Read As Read 6 3.2E-09 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-12 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:30 Drill Time: 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3- Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read 4 As Read 421 1,517 10,347 20 L.IE-08 101 593 As Read As Read 8 6 635 2,284 22,363 As Read <3E-9 As Read 626 As Read As Read 4 As Read 287 1,034 10,310 As Read <3E-9 As Read 627 As Read As Read As Read As Read 124 447 3,078 22 1.2E-08 108 659 As Read As Read As Read As Read 121 435 4,349 As Read <3E-9 As Read 660 As Read As Read As Read As Read 290 1,045 8,064 21 1.1E-08 104 692 As Read As Read As Read As Read 42 As Read 1,512 As Read <3E-9 As Read 693 As Read As Read As Read As Read 219 787 7,422 16 8.5E-09 79 694 As Read As Read As Read As Read 37 As Read 1,030 10 5.IE-09 As Read 725 As Read As Read As Read As Read 24 As Read 856 As Read <3E-9 As Read 726 As Read As Read As Read As Read 146 527 5,208 10 5.5E-09 52 727 As Read As Read As Read As Read 156 562 3,785 31 1.7E-08 155 758 As Read As Read As Read As Read As Read As Read 373 As Read <3E-9 As Read 759 As Read As Read As Read As Read 87 314 3,129 AsRead <3E-9 As Read 760 As Read As Read As Read As Read 156 561 4,229 24 1.3E-08 118 761 As Read As Read As Read As Read 21 As Read 684 11 5.8E-09 54 792 As Read As Read As Read As Read 42 As Read 1,525 As Read <3E-9 As Read 793 As Read As Read As Read AsRead 118 424 3,749 19 1.OE-08 95 794 As Read As Read As Read As Read 64 230 1,700 19 1.OE-08 96 825 As Read As Read As Read As Read 26 As Read 946 As Read <3E-9 As Read 826 As Read As Read As Read As Read 82 297 2,820 14 7.2E-09 68 827 As Read As Read As Read AsRead 101 362 2,516 23 1.2E-08 113 828 As Read As Read As Read As Read As Read As Read 441 8 4.0E-09 As Read 858 As Read As Read As Read As Read As Read As Read 465 As Read <3E-9 As Read 859 As Read As Read As Read As Read 51 As Read 1,792 12 6.4E-09 60
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-13 7/12/2002
A) 4)
'I Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:30 Drill Time : 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. CW. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) C-7mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mi) (net cpm) 860 As Read As Read As Read As Read 95 341 2,493 22 1.2E-08 110 861 As Read As Read As Read As Read 29 As Read 921 13 6.9E-09 65 891 As Read As Read As Read As Read As Read As Read 263 As Read <3E-9 As Read 892 As Read As Read As Read As Read 32 As Read 1,128 11 6.IE-09 57 893 As Read As Read As Read As Read 77 278 2,150 26 1.4E-08 132 894 As Read As Read As Read As Read 49 As Read 1,386 22 1.lE-08 108 895 As Read As Read As Read As Read As Read As Read 257 As Read <3E-9 As Read 925 As Read As Read As Read As Read 18 AsRead 646 10 5.1E-09 AsRead 926 As Read As Read As Read As Read 50 As Read 1,554 23 1.2E-08 115 927 As Read As Read As Read As Read 65 233 1,645 28 1.5E-08 139 928 As Read As Read As Read As Read 17 As Read 591 13 6.7E-09 63 958 As Read As Read As Read As Read As Read As Read 327 10 5.2E-09 As Read 959 As Read As Read As Read As Read 30 As Read 949 24 1.3E-08 119 960 As Read AsRead As Read As Read 55 As Read 1,351 30 1.6E-08 148 961 As Read As Read As Read As Read 24 As Read 769 18 9.5E-09 90 991 As Read As Read As Read As Read As Read As Read As Read 6 3.2E-09 As Read 992 As Read As Read As Read As Read 17 As Read 548 20 1.IE-08 100 993 As Read As Read As Read As Read 43 As Read 1,017 33 1.8E-08 166 994 As Read As Read As Read As Read 28 As Read 833 26 1.4E-08 133 995 As Read As Read As Read As Read As Read As Read 298 9 5.OE-09 As Read 1025 As Read As Read As Read As Read As Read As Read 234 9 4.7E-09 As Read 1026 As Read As Read As Read AsRead 25 As Read 594 22 I.1E-08 109 1027 As Read As Read As Read As Read 27 As Read 711 26 1.4E-08 131 1028 As Read As Read As Read As Read As Read As Read 395 15 7.9E-09 75 1059 As Read As Read As Read As Read As Read As Read As Read 7 3.6E-09 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) '
Page 9.4-14 7/12/2002
) 3) 2-Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time : 12:30 Drill Time: 05:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3' C.W. 3 Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 1060 As Read As Read As Read As Read As Read As Read 352 13 6.9E-09 66 1061 As Read As Read AsRead As Read As Read AsRead 311 12 6.4E-09 61 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-15 7/12/2002
I 4)
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3 C.W. 3- Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read 4 As Read 385 1,387 9,775 As Read <3E-9 As Read 593 As Read As Read 8 6 593 2,134 21,151 As Read <3E-9 AsRead 626 As Read As Read 4 As Read 271 977 9,764 As Read <3E-9 As Read 627 As Read As Read As Read As Read 134 482 3,098 As Read <3E-9 As Read 659 As Read As Read As Read As Read 114 412 4,118 As Read <3E-9 As Read 660 As Read As Read As Read As Read 241 868 7,591 As Read <3E-9 As Read 692 As Read As Read As Read As Read 40 As Read 1,432 As Read <3E-9 As Read 693 As Read As Read As Read As Read 199 715 7,065 As Read <3E-9 As Read 694 As Read As Read As Read As Read 48 As Read 1,100 As Read <3E-9 As Read 725 As Read As Read As Read As Read 23 As Read 811 As Read <3E-9 As Read 726 As Read As Read As Read As Read 138 498 4,972 As Read <3E-9 As Read 727 As Read As Read As Read As Read 154 554 3,866 11 6.OE-09 58 758 As Read As Read As Read As Read As Read As Read 354 As Read <3E-9 As Read 759 As Read As Read As Read As Read 83 299 2,990 As Read <3E-9 As Read 760 As Read As Read As Read As Read 129 465 4,104 7 3.9E-09 As Read 761 As Read As Read As Read As Read 31 As Read 827 6 3.2E-09 As Read 792 As Read As Read As Read As Read 41 As Read 1,469 As Read <3E-9 As Read 793 As Read As Read As Read As Read 107 384 3,724 8 4.5E-09 As Read 794 As Read As Read As Read As Read 84 301 1,966 12 6.3E-09 61 825 As Read As Read As Read As Read 25 As Read 911 As Read <3E-9 As Read 826 As Read As Read As Read As Read 78 282 2,799 As Read <3E-9 As Read 827 As Read As Read As Read As Read 108 387 2,791 16 8.4E-09 81 828 As Read As Read As Read As Read 21 As Read 648 9 4.6E-09 As Read 858 As Read As Read As Read As Read As Read As Read 453 As Read <3E-9 As Read 859 As Read As Read As Read As Read 50 As Read 1,788 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-16 7/12/2002
I -1 )
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 860 As Read As Read As Read As Read 85 307 2,622 12 6.4E-09 62 861 As Read As Read As Read As Read 49 As Read 1,239 13 6.7E-09 64 891 As Read As Read As Read As Read As Read As Read 260 As Read <3E-9 As Read 892 As Read As Read As Read As Read 32 As Read 1,142 As Read <3E-9 As Read 893 As Read As Read As Read As Read 68 244 2,260 11 5.6E-09 54 894 As Read As Read As Read As Read 71 254 1,732 14 7.6E-09 74 895 As Read As Read As Read As Read As Read As Read 404 6 3.3E-09 As Read 925 As Read As Read As Read As Read 19 As Read 676 As Read <3E-9 As Read 926 As Read As Read As Read As Read 47 As Read 1,662 8 4.4E-09 As Read 927 As Read As Read As Read As Read 77 278 1,955 15 7.8E-09 76 928 As Read As Read As Read As Read 28 As Read 848 11 5.6E-09 54 958 As Read As Read As Read As Read As Read As Read 377 As Read <3E-9 As Read 959 As Read As Read As Read As Read 31 As Read 1,108 9 4.6E-09 As Read 960 As Read As Read As Read As Read 58 209 1,646 15 7.9E-09 77 961 As Read As Read As Read As Read 40 As Read 1,090 13 6.8E-09 66 962 As Read As Read As Read As Read As Read As Read 291 As Read <3E-9 As Read 991 As Read As Read As Read As Read As Read As Read 216 As Read <3E-9 As Read 992 As Read As Read As Read As Read 20 As Read 719 8 4.3E-09 As Read 993 As Read As Read As Read As Read 45 AsRead 1,363 17 8.8E-09 86 994 As Read As Read As Read As Read 52 As Read 1,298 18 9.6E-09 94 995 As Read As Read As Read As Read 15 As Read 521 9 4.9E-09 As Read 1025 As Read As Read As Read As Read As Read AsRead 417 8 4.1E-09 As Read 1026 As Read As Read As Read As Read 29 AsRead 946 16 8.3E-09 81 1027 As Read As Read As Read As Read 48 AsRead 1,221 20 1IE-08 104 1028 As Read As Read As Read As Read 24 As Read 756 14 7.6E-09 75
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-17 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time : 12:45 Drill Time: 05:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 1029 As Read As Read As Read As Read As Read As Read 221 As Read <3E-9 As Read 1058 As Read As Read As Read As Read As Read As Read 220 7 3.6E-09 As Read 1059 As Read As Read As Read AsRead 17 As Read 575 16 8.3E-09 81 1060 As Read As Read As Read As Read 37 As Read 927 22 1.2E-08 114 1061 As Read As Read As Read AsRead 28 As Read 780 18 9.6E-09 94 1062 As Read As Read As Read As Read As Read As Read 340 8 4.4E-09 As Read 1092 As Read As Read As Read As Read As Read As Read 323 12 6.IE-09 60 1093 As Read As Read As Read As Read 25 As Read 627 21 1.IE-08 107 1094 As Read As Read As Read AsRead 26 As Read 687 22 1.1E-o08 112 1095 As Read As Read As Read As Read As Read As Read 408 13 6.8E-09 66 OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-18 7/12/2002
I)
I Columbia.Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read 3 As Read 344 1,239 9,210 As Read <3E-9 As Read 593 As Read As Read 7 6 559 2,013 20,091 As Read <3E-9 As Read 626 As Read As Read 3 As Read 258 928 9,279 As Read <3E-9 As Read 627 As Read As Read As Read As Read 134 483 2,976 As Read <3E-9 As Read 659 As Read As Read As Read As Read 109 391 3,914 As Read <3E-9 As Read 660 As Read As Read As Read As Read 206 741 7,132 As Read <3E-9 As Read 692 As Read As Read As Read As Read 38 As Read 1,361 As Read <3E-9 As Read 693 As Read As Read As Read As Read 187 672 6,712 As Read <3E-9 As Read 694 As Read As Read As Read As Read 55 As Read 1,088 As Read <3E-9 As Read 725 As Read As Read As Read As Read 21 As Read 771 As Read <3E-9 As Read 726 As Read As Read As Read As Read 131 473 4,727 As Read <3E-9 As Read 727 As Read As Read As Read As Read 122 440 3,632 As Read <3E-9 As Read 758 As Read As Read As Read As Read As Read As Read 336 As Read <3E-9 As Read 759 As Read As Read As Read As Read 79 284 2,844 As Read <3E-9 As Read 760 As Read As Read As Read As Read 110 397 3,878 As Read <3E-9 As Read 761 As Read As Read As Read As Read 42 As Read 873 As Read <3E-9 As Read 792 As Read As Read As Read As Read 39 As Read 1,398 As Read <3E-9 As Read 793 As Read As Read As Read As Read 99 358 3,566 As Read <3E-9 As Read 794 As Read As Read As Read As Read 78 282 1,950 As Read <3E-9 As Read 825 As Read As Read As Read As Read 24 As Read 867 As Read <3E-9 As Read 826 As Read As Read As Read As Read 75 268 2,683 As Read <3E-9 As Read 827 As Read As Read As Read As Read 86 308 2,699 As Read <3E-9 As Read 828 As Read As Read As Read As Read 33 As Read 770 As Read <3E-9 As Read 858 As Read As Read As Read As Read As Read As Read 433 As Read <3E-9 As Read 859 As Read As Read As Read As Read 48 As Read 1,722 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-19 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3- Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 860 As Read As Read As Read As Read 73 263 2,551 As Read <3E-9 As Read 861 As Read As Read As Read As Read 62 223 1,364 As Read <3E-9 As Read 891 As Read As Read As Read As Read As Read As Read 249 As Read <3E-9 As Read 892 As Read As Read As Read As Read 31 As Read 1,106 AsRead <3E-9 As Read 893 As Read As Read As Read As Read 63 226 2,241 As Read <3E-9 As Read 894 As Read As Read As Read As Read 70 251 1,850 8 4.4E-09 As Read 895 As Read As Read As Read As Read 19 As Read 528 As Read <3E-9 As Read 925 As Read As Read As Read As Read 18 As Read 656 As Read <3E-9 As Read 926 As Read As Read As Read As Read 46 As Read 1,652 As Read <3E-9 As Read 927 As Read As Read As Read As Read 66 239 2,030 8 4.5E-09 As Read 928 As Read As Read As Read As Read 49 As Read 1,108 10 5.1E-09 50 929 As Read As Read As Read As Read As Read As Read 205 As Read <3E-9 As Read 958 As Read As Read As Read As Read As Read As Read 371 As Read <3E-9 As Read 959 As Read As Read As Read As Read 31 As Read 1,113 As Read <3E-9 As Read 960 As Read As Read As Read As Read 50 As Read 1,700 7 3.5E-09 As Read 961 As Read As Read As Read As Read 55 As Read 1,318 9 5.OE-09 50 962 As Read As Read As Read As Read As Read As Read 437 As Read 3. 1E-09 As Read 991 As Read As Read As Read As Read As Read As Read 217 As Read <3E-9 As Read 992 As Read As Read As Read As Read 20 As Read 735 As Read <3E-9 As Read 993 As Read As Read As Read As Read 41 As Read 1,426 As Read 3.2E-09 As Read 994 As Read As Read As Read As Read 58 209 1,497 10 5.2E-09 52 995 As Read As Read As Read As Read 27 As Read 727 8 4.2E-09 As Read 1025 As Read As Read As Read As Read As Read As Read 448 As Read <3E-9 As Read 1026 As Read As Read As Read As Read 29 As Read 1,029 As Read <3E-9 As Read 1027 As Read As Read As Read As Read 47 As Read 1,388 10 5.OE-09 51
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-20 7/12/2002
11 10 )-ý Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:00 Drill Time: 06:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/mI) (net cpm) 1028 As Read As Read As Read AsRead 42 As Read 1,018 10 5.2E-09 52 1029 As Read As Read As Read As Read As Read As Read 346 As Read <3E-9 As Read 1058 As Read As Read As Read As Read As Read As Read 261 As Read <3E-9 As Read 1059 As Read As Read As Read As Read 19 As Read 687 As Read <3E-9 As Read 1060 As Read As Read As Read As Read 36 As Read 1,121 10 5.4E-09 54 1061 As Read As Read As Read As Read 43 As Read 1,072 11 6.OE-09 61 1062 As Read As Read As Read As Read 17 As Read 523 7 3.9E-09 As Read 1092 As Read As Read As Read As Read As Read As Read 447 As Read <3E-9 As Read 1093 As Read As Read As Read As Read 26 As Read 851 11 5.6E-09 56 1094 As Read As Read As Read As Read 40 As Read 1,028 14 7.3E-09 73 1095 As Read As Read As Read As Read 24 As Read 688 11 5.7E-09 57 1096 As Read As Read As Read As Read As Read As Read 250 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-21 7/12/2002
4, I )
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:15 Drill Time : 06:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
C.W. O.W C.W. 3'C.W. 3' Contact Monitor O.W.
Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read 3 As Read 295 1,064 8,665 As Read <3E-9 As Read 593 As Read As Read 7 5 533 1,918 19,164 As Read <3E-9 AsRead 626 As Read As Read 3 As Read 246 885 8,850 As Read <3E-9 As Read 627 As Read As Read As Read As Read 111 401 2,778 As Read <3E-9 As Read 659 As Read As Read As Read As Read 104 373 3,734 As Read <3E-9 As Read 660 As Read As Read As Read As Read 190 684 6,778 As Read <3E-9 As Read 692 As Read As Read As Read As Read 36 As Read 1,298 As Read <3E-9 As Read 693 As Read As Read As Read As Read 178 640 6,400 As Read <3E-9 As Read 694 As Read As Read As Read As Read 48 As Read 1,022 As Read <3E-9 As Read 725 As Read As Read As Read As Read 20 As Read 735 As Read <3E-9 As Read 726 As Read As Read As Read As Read 125 451 4,507 As Read <3E-9 As Read 727 As Read As Read As Read As Read 100 361 3,406 As Read <3E-9 As Read 758 As Read As Read As Read As Read As Read As Read 321 As Read <3E-9 As Read 759 As Read As Read As Read As Read 75 271 2,712 As Read <3E-9 As Read 760 As Read As Read As Read As Read 103 370 3,691 As Read <3E-9 As Read 761 As Read As Read As Read As Read 43 As Read 844 As Read <3E-9 As Read 792 As Read As Read As Read As Read 37 As Read 1,333 As Read <3E-9 As Read 793 As Read As Read As Read As Read 95 340 3,403 As Read <3E-9 As Read 794 As Read As Read As Read As Read 60 218 1,819 As Read <3E-9 As Read 825 As Read As Read As Read As Read 23 As Read 827 As Read <3E-9 As Read 826 As Read As Read As Read As Read 71 256 2,560 As Read <3E-9 As Read 827 As Read As Read As Read As Read 73 262 2,557 As Read <3E-9 As Read 828 As Read As Read As Read As Read 41 As Read 791 As Read <3E-9 As Read 858 As Read As Read As Read As Read As Read As Read 413 As Read <3E-9 As Read 859 As Read As Read As Read As Read 46 As Read 1,645 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-22 7/12/2002
AqW 4 )
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:15 Drill Time : 06:15 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 860 As Read As Read As Read As Read 68 245 2,440 As Read <3E-9 As Read 861 As Read As Read As Read As Read 52 As Read 1,303 As Read <3E-9 As Read 862 As Read As Read As Read As Read As Read As Read 214 As Read <3E-9 As Read 891 As Read As Read As Read As Read As Read As Read 237 As Read <3E-9 As Read 892 As Read As Read As Read As Read 29 As Read 1,057 As Read <3E-9 As Read 893 As Read As Read As Read As Read 60 216 2,155 As Read <3E-9 As Read 894 As Read As Read As Read As Read 55 As Read 1,773 As Read <3E-9 As Read 895 As Read As Read As Read As Read 27 As Read 581 As Read <3E-9 As Read 925 As Read As Read As Read As Read 17 As Read 628 As Read <3E-9 As Read 926 As Read As Read As Read As Read 44 As Read 1,590 As Read <3E-9 As Read 927 As Read As Read As Read As Read 56 202 1,962 As Read <3E-9 As Read 928 As Read As Read As Read As Read 53 As Read 1,167 As Read <3E-9 As Read 929 As Read As Read As Read As Read As Read As Read 252 As Read <3E-9 As Read 958 As Read As Read As Read As Read As Read As Read 356 As Read <3E-9 As Read 959 As Read As Read As Read As Read 30 As Read 1,078 As Read <3E-9 As Read 960 As Read As Read As Read As Read 47 As Read 1,670 As Read <3E-9 As Read 961 As Read As Read As Read As Read 47 As Read 1,332 As Read <3E-9 As Read 962 As Read As Read As Read As Read 22 As Read 525 As Read <3E-9 As Read 991 As Read As Read As Read As Read As Read As Read 209 As Read <3E-9 As Read 992 As Read As Read As Read As Read 20 As Read 715 As Read <3E-9 As Read 993 As Read As Read As Read As Read 39 As Read 1,415 As Read <3E-9 As Read 994 As Read As Read As Read As Read 48 As Read 1,523 As Read <3E-9 As Read 995 As Read As Read As Read As Read 39 As Read 868 As Read <3E-9 As Read 996 As Read As Read As Read As Read As Read As Read 220 As Read <3E-9 As Read 1025 As Read As Read As Read As Read As Read As Read 439 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-23 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:15 Drill Time: 06:15 Survey Meter (RO-2A) Micro.R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 1026 As Read As Read As Read As Read 29 As Read 1,026 As Read <3E-9 As Read 1027 As Read As Read As Read As Read 41 As Read 1,418 As Read <3E-9 As Read 1028 As Read As Read As Read As Read 50 As Read 1,171 7 3.7E-09 As Read 1029 As Read As Read As Read As Read 18 As Read 482 As Read <3E-9 As Read 1058 As Read As Read As Read As Read As Read As Read 259 As Read <3E-9 As Read 1059 As Read As Read As Read As Read 19 As Read 693 As Read <3E-9 As Read 1060 As Read As Read As Read As Read 33 As Read 1,156 As Read <3E-9 As Read 1061 As Read As Read As Read As Read 43 As Read 1,180 6 3.4E-09 As Read 1062 As Read As Read As Read As Read 28 As Read 693 6 3.4E-09 As Read 1063 As Read As Read As Read As Read As Read As Read 215 As Read <3E-9 As Read 1092 As Read As Read As Read As Read As Read As Read 463 As Read <3E-9 As Read 1093 As Read As Read As Read As Read 25 As Read 898 As Read <3E-9 As Read 1094 As Read As Read As Read AsRead 36 As Read 1,123 6 3.3E-09 AsRead 1095 As Read As Read As Read As Read 38 As Read 879 7 3.8E-09 As Read 1096 As Read As Read As Read As Read As Read As Read 366 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-24 7/12/2002
I 3 Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:30 Drill Time: 06:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3 C.W. 3 Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read As Read As Read 259 931 8,204 As Read <3E-9 As Read 593 As Read As Read 7 5 510 1,835 18,340 As Read <3E-9 As Read 626 As Read As Read 3 As Read 235 847 8,469 As Read <3E-9 As Read 627 As Read As Read As Read As Read 91 327 2,601 As Read <3E-9 As Read 659 As Read As Read As Read As Read 99 357 3,573 As Read <3E-9 As Read 660 As Read As Read As Read As Read 180 649 6,480 As Read <3E-9 As Read 692 As Read As Read As Read As Read 34 As Read 1,242 As Read <3E-9 As Read 693 As Read As Read As Read As Read 170 612 6,123 As Read <3E-9 As Read 694 As Read As Read As Read As Read 37 As Read 946 As Read <3E-9 As Read 725 As Read As Read As Read As Read 20 As Read 703 As Read <3E-9 As Read 726 As Read As Read As Read As Read 120 431 4,311 As Read <3E-9 As Read 727 As Read As Read As Read As Read 91 329 3,241 As Read <3E-9 As Read 758 As Read As Read As Read As Read As Read As Read 307 As Read <3E-9 As Read 759 As Read As Read As Read As Read 72 259 2,594 As Read <3E-9 As Read 760 As Read As Read As Read As Read 98 353 3,529 As Read <3E-9 As Read 761 As Read As Read As Read As Read 34 As Read 781 As Read <3E-9 As Read 792 As Read As Read As Read As Read 35 As Read 1,275 As Read <3E-9 As Read 793 As Read As Read As Read As Read 90 325 3,254 As Read <3E-9 As Read 794 As Read As Read As Read As Read 50 As Read 1,712 As Read <3E-9 As Read 825 As Read As Read As Read As Read 22 As Read 791 As Read <3E-9 As Read 826 As Read As Read As Read As Read 68 245 2,448 As Read <3E-9 As Read 827 As Read As Read As Read As Read 68 245 2,440 As Read <3E-9 As Read 828 As Read As Read As Read As Read 35 As Read 745 As Read <3E-9 As Read 858 As Read As Read As Read As Read As Read As Read 395 As Read <3E-9 As Read 859 As Read As Read As Read As Read 44 As Read 1,573 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-25 7/12/2002
- 4) 4)
-I Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:30 Drill Time : 06:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 860 As Read As Read As Read As Read 65 233 2,334 As Read <3E-9 As Read 861 As Read As Read As Read As Read 39 As Read 1,210 As Read <3E-9 As Read 862 As Read As Read As Read As Read As Read As Read 221 As Read <3E-9 As Read 891 As Read As Read As Read As Read As Read As Read 227 As Read <3E-9 As Read 892 As Read As Read As Read As Read 28 As Read 1,011 As Read <3E-9 As Read 893 As Read As Read As Read As Read 57 206 2,063 As Read <3E-9 As Read 894 As Read As Read As Read As Read 48 As Read 1,686 As Read <3E-9 As Read 895 As Read As Read As Read As Read 27 As Read 567 As Read <3E-9 As Read 925 As Read As Read As Read As Read 17 As Read 601 As Read <3E-9 As Read 926 As Read As Read As Read As Read 42 As Read 1,522 As Read <3E-9 As Read 927 As Read As Read As Read As Read 52 As Read 1,879 As Read <3E-9 As Read 928 As Read As Read As Read As Read 41 As Read 1,095 As Read <3E-9 As Read 929 As Read As Read As Read As Read As Read As Read 272 As Read <3E-9 As Read 958 As Read As Read As Read As Read As Read As Read 341 As Read <3E-9 As Read 959 As Read As Read As Read As Read 29 As Read 1,033 As Read <3E-9 As Read 960 As Read As Read As Read As Read 45 As Read 1,606 As Read <3E-9 As Read 961 As Read As Read As Read As Read 38 As Read 1,266 As Read <3E-9 As Read 962 As Read As Read As Read As Read 26 As Read 542 As Read <3E-9 As Read 991 As Read As Read As Read As Read As Read As Read 201 As Read <3E-9 As Read 992 As Read As Read As Read As Read 19 As Read 686 As Read <3E-9 As Read 993 As Read As Read As Read As Read 38 As Read 1,364 As Read <3E-9 As Read 994 As Read As Read As Read As Read 42 As Read 1,470 As Read <3E-9 As Read 995 As Read As Read As Read As Read 35 As Read 866 As Read <3E-9 As Read 996 As Read As Read As Read As Read As Read As Read 249 As Read <3E-9 As Read 1025 As Read As Read As Read As Read As Read As Read 422 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-26 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time. 13:30 Drill Time: 06:30 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor OW. C.W. O.W. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm)
As Read As Read As Read As Read 28 As Read 992 As Read <3E-9 As Read 1026 As Read As Read As Read As Read 39 As Read 1,383 As Read <3E-9 As Read 1027 As Read As Read As Read As Read 39 AsRead 1,144 As Read <3E-9 As Read 1028 1029 As Read As Read As Read As Read 27 As Read 551 As Read <3E-9 As Read As Read As Read As Read As Read As Read As Read 250 As Read <3E-9 As Read 1058 1059 As Read As Read As Read As Read 19 As Read 674 As Read <3E-9 As Read 1060 As Read As Read As Read As Read 32 As Read 1,139 As Read <3E-9 As Read 1061 As Read As Read As Read As Read 35 AsRead 1,171 As Read <3E-9 As Read As Read As Read As Read As Read 32 As Read 757 As Read <3E-9 As Read 1062 As Read As Read As Read As Read As Read As Read 266 As Read <3E-9 As Read 1063 1092 As Read As Read As Read As Read As Read As Read 452 As Read <3E-9 As Read As Read As Read As Read As Read 25 As Read 891 As Read <3E-9 As Read 1093 1094 As Read As Read As Read As Read 32 As Read 1,136 As Read <3E-9 As Read 1095 As Read As Read As Read As Read 38 As Read 945 As Read <3E-9 As Read 1096 As Read As Read As Read As Read 20 As Read 463 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-27 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:45 Drill Time: 06:46 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) 7 (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read As Read As Read 237 855 7,833 As Read <3E-9 As Read 593 As Read As Read 6 5 489 1,761 17,604 As Read <3E-9 As Read 626 As Read As Read As Read As Read 226 813 8,127 As Read <3E-9 As Read 627 As Read As Read As Read As Read 80 288 2,470 As Read <3E-9 As Read 659 As Read As Read As Read As Read 95 343 3,429 As Read <3E-9 As Read 660 As Read As Read As Read As Read 173 622 6,217 As Read <3E-9 As Read 692 As Read As Read As Read As Read 33 As Read 1,191 As Read <3E-9 As Read 693 As Read As Read As Read As Read 163 587 5,875 As Read <3E-9 As Read 694 As Read As Read As Read As Read 31 As Read 890 As Read <3E-9 As Read 725 As Read As Read As Read As Read 19 As Read 675 As Read <3E-9 As Read 726 As Read As Read As Read AsRead 115 414 4,136 As Read <3E-9 As Read 727 As Read As Read As Read As Read 87 312 3,107 As Read <3E-9 As Read 758 As Read As Read As Read As Read As Read As Read 294 As Read <3E-9 As Read 759 As Read As Read As Read As Read 69 249 2,489 As Read <3E-9 As Read 760 As Read As Read As Read As Read 94 339 3,386 As Read <3E-9 As Read 761 As Read As Read As Read As Read 27 As Read 729 As Read <3E-9 As Read 792 As Read As Read As Read As Read 34 As Read 1,223 As Read <3E-9 As Read 793 As Read As Read As Read As Read 87 312 3,122 As Read <3E-9 As Read 794 As Read As Read As Read As Read 46 As Read 1,636 As Read <3E-9 As Read 825 As Read As Read As Read As Read 21 As Read 759 As Read <3E-9 As Read 826 As Read As Read As Read As Read 65 235 2,349 As Read <3E-9 As Read 827 As Read As Read As Read As Read 65 234 2,340 As Read <3E-9 As Read 828 As Read As Read As Read As Read 27 As Read 691 As Read <3E-9 As Read 858 As Read As Read As Read As Read As Read As Read 379 As Read <3E-9 As Read 859 As Read As Read As Read As Read 42 As Read 1,509 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-28 7/12122002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:45 Drill Time: 06:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm)7 (cpm) (net cpm) (uCi/ml) (net cpm) 860 As Read As Read As Read As Read 62 224 2,239 As Read <3E-9 As Read 861 As Read As Read As Read As Read 33 As Read 1,147 As Read <3E-9 As Read 862 As Read As Read As Read As Read As Read As Read 216 As Read <3E-9 As Read 891 As Read As Read As Read As Read As Read As Read 218 As Read <3E-9 As Read 892 As Read As Read As Read As Read 27 As Read 969 As Read <3E-9 As Read 893 As Read As Read As Read As Read 55 As Read 1,979 As Read <3E-9 As Read 894 As Read As Read As Read As Read 45 As Read 1,615 As Read <3E-9 As Read 895 As Read As Read As Read As Read 21 As Read 528 As Read <3E-9 As Read 925 As Read As Read As Read As Read 16 As Read 577 As Read <3E-9 As Read 926 As Read As Read As Read As Read 41 As Read 1,460 As Read <3E-9 As Read 927 As Read As Read As Read As Read 50 As Read 1,802 As Read <3E-9 As Read 928 As Read As Read As Read As Read 32 As Read 1,025 As Read <3E-9 As Read 929 As Read As Read As Read As Read 16 As Read 272 As Read <3E-9 As Read 958 As Read As Read As Read As Read As Read As Read 327 As Read <3E-9 As Read 959 As Read As Read As Read As Read 28 As Read 991 As Read <3E-9 As Read 960 As Read As Read As Read As Read 43 As Read 1,542 As Read <3E-9 As Read 961 As Read As Read As Read As Read 34 As Read 1,209 As Read <3E-9 As Read 962 As Read As Read As Read As Read 22 As Read 512 As Read <3E-9 As Read 992 As Read As Read As Read As Read 18 As Read 658 As Read <3E-9 As Read 993 As Read As Read As Read As Read 36 As Read 1,309 As Read <3E-9 As Read 994 As Read As Read As Read As Read 39 As Read 1,412 As Read <3E-9 As Read 995 As Read As Read As Read As Read 27 As Read 814 As Read <3E-9 As Read 996 As Read As Read As Read As Read As Read As Read 254 As Read <3E-9 As Read 1025 As Read As Read As Read As Read As Read As Read 405 As Read <3E-9 As Read 1026 As Read As Read As Read As Read 26 As Read 953 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-29 7/12/2002
I) I Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 13:45 Drill Time: 06:45 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3 C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) 7 (cpm) (net cpm) (uCi/ml) (net cpm) 1027 As Read As Read As Read As Read 37 As Read 1,331 As Read <3E-9 As Read 1028 As Read As Read As Read As Read 32 As Read 1,087 As Read <3E-9 As Read 1029 As Read As Read As Read As Read 27 As Read 543 As Read <3E-9 As Read 1058 As Read As Read As Read As Read As Read As Read 240 As Read <3E-9 As Read 1059 As Read As Read As Read As Read 18 As Read 648 As Read <3E-9 As Read 1060 As Read As Read As Read As Read 31 As Read 1,099 As Read <3E-9 As Read 1061 As Read As Read As Read As Read 32 As Read 1,131 As Read <3E-9 As Read 1062 As Read As Read As Read As Read 27 As Read 728 As Read <3E-9 As Read 1063 As Read As Read As Read As Read As Read As Read 283 As Read <3E-9 As Read 1092 As Read As Read As Read As Read As Read As Read 436 As Read <3E-9 As Read 1093 As Read As Read As Read As Read 24 As Read 862 As Read <3E-9 As Read 1094 As Read As Read As Read As Read 31 As Read 1,106 As Read <3E-9 As Read 1095 As Read As Read As Read As Read 29 As Read 911 As Read <3E-9 As Read 1096 As Read As Read As Read As Read 23 As Read 489 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-30 7/12/2002
I)
.Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 14:00 Drill Time: 07:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. O.W. C.W. 3'OW. Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 560 As Read As Read As Read As Read 221 797 7,511 As Read <3E-9 As Read 593 As Read As Read 6 5 471 1,694 16,942 As Read <3E-9 As Read 626 As Read As Read As Read As Read 217 782 7,821 As Read <3E-9 As Read 627 As Read As Read As Read As Read 73 263 2,362 As Read <3E-9 As Read 659 As Read As Read As Read As Read 92 330 3,300 As Read <3E-9 As Read 660 As Read As Read As Read As Read 166 599 5,981 As Read <3E-9 As Read 692 As Read As Read As Read As Read 32 As Read 1,146 As Read <3E-9 As Read 693 As Read As Read As Read As Read 157 565 5,652 As Read <3E-9 As Read 694 As Read As Read As Read As Read 27 As Read 848 As Read <3E-9 As Read 725 As Read As Read As Read As Read 18 As Read 649 As Read <3E-9 As Read 726 As Read As Read As Read As Read 111 398 3,979 As Read <3E-9 As Read 727 As Read As Read As Read As Read 83 300 2,987 As Read <3E-9 As Read 758 As Read As Read As Read As Read As Read As Read 283 As Read <3E-9 As Read 759 As Read As Read As Read As Read 67 239 2,394 As Read <3E-9 As Read 760 As Read As Read As Read As Read 90 326 3,257 As Read <3E-9 As Read 761 As Read As Read As Read As Read 23 As Read 692 As Read <3E-9 As Read 792 As Read As Read As Read As Read 33 As Read 1,177 As Read <3E-9 As Read 793 As Read As Read As Read As Read 83 300 3,003 As Read <3E-9 As Read 794 As Read As Read As Read As Read 44 As Read 1,572 As Read <3E-9 As Read 825 As Read As Read As Read As Read 20 As Read 730 As Read <3E-9 As Read 826 As Read As Read As Read As Read 63 226 2,259 As Read <3E-9 As Read 827 As Read As Read As Read As Read 63 225 2,251 As Read <3E-9 As Read 828 As Read As Read As Read As Read 22 As Read 651 As Read <3E-9 As Read 858 As Read As Read As Read As Read As Read As Read 364 As Read <3E-9 As Read 859 As Read As Read As Read As Read 40 As Read 1,452 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-31 7/12/2002
2002 Exercise Columbia Generatingl ww..
Station OFFSITE SURVEY AND SAMPLING DATA Drill Time: 07:00 Real Time: 14:00 Micro-R Meter Frisker Gross Gross Iodine Gross Survey Meter (RO-2A)
Iodine Conc. Part.
Field 3 feet Contact OW. C.W. O.W. C.W. 3 C.W. 3 Contact Monitor (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm)
Point (mR/hr) (mR/hr) (mR/hr)
As Read 60 215 2,153 As Read <3E-9 As Read 860 As Read As Read As Read 31 As Read 1,099 As Read <3E-9 As Read 861 As Read As Read As Read As Read As Read As Read 202 As Read <3E-9 As Read 862 As Read As Read As Read As Read As Read As Read As Read 210 As Read <3E-9 As Read 891 As Read As Read As Read 26 As Read 932 As Read <3E-9 As Read 892 As Read As Read As Read As Read As Read 53 As Read 1,903 As Read <3E-9 As Read 893 As Read As Read As Read As Read 43 As Read 1,553 As Read <3E-9 As Read 894 As Read As Read As Read 17 As Read 497 As Read <3E-9 As Read 895 As Read As Read As Read As Read 15 As Read 554 As Read <3E-9 As Read 925 As Read As Read As Read As Read As Read 39 As Read 1,404 As Read <3E-9 As Read 926 As Read As Read As Read As Read 48 As Read 1,733 As Read <3E-9 As Read 927 As Read As Read As Read As Read 28 As Read 978 As Read <3E-9 As Read 928 As Read As Read As Read As Read As Read As Read 257 As Read <3E-9 As Read 929 As Read As Read As Read As Read As Read As Read 315 As Read <3E-9 As Read 958 As Read As Read As Read As Read 26 As Read 953 As Read <3E-9 As Read 959 As Read As Read As Read As Read As Read 41 As Read 1,483 As Read <3E-9 As Read 960 As Read As Read As Read As Read 32 As Read 1,161 As Read <3E-9 As Read 961 As Read As Read As Read As Read 18 As Read 478 As Read <3E-9 As Read 962 As Read As Read As Read As Read 18 As Read 633 As Read <3E-9 As Read 992 As Read As Read As Read As Read 35 As Read 1,259 As Read <3E-9 As Read 993 As Read As Read As Read As Read 38 As Read 1,358 As Read <3E-9 As Read 994 As Read As Read As Read As Read 23 As Read 771 As Read <3E-9 As Read 995 As Read As Read As Read As Read As Read As Read As Read 244 As Read <3E-9 As Read 996 As Read As Read As Read As Read As Read As Read As Read 389 As Read <3E-9 As Read 1025 1026 As Read As Read As Read As Read 25 As Read 916 As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players)
- Page 9.4-32 7/12/2002
Columbia Generating Station 2002 Exercise OFFSITE SURVEY AND SAMPLING DATA Real Time: 14:00 Drill Time: 07:00 Survey Meter (RO-2A) Micro-R Meter Frisker Gross Gross Iodine Gross Field 3 feet Contact Iodine Conc. Part.
Monitor O.W. C.W. OW. C.W. 3' C.W. 3' Contact Point (mR/hr) (mR/hr) (mR/hr) (mR/hr) (uR/hr) (cpm) (cpm) (net cpm) (uCi/ml) (net cpm) 1027 As Read As Read As Read As Read 36 As Read 1,280 As Read <3E-9 As Read 1028 As Read As Read As Read As Read 29 As Read 1,041 As Read <3E-9 As Read 1029 As Read As Read As Read As Read 21 As Read 506 As Read <3E-9 As Read 1058 As Read As Read As Read As Read As Read As Read 231 As Read <3E-9 As Read 1059 As Read As Read As Read As Read 17 As Read 624 As Read <3E-9 As Read 1060 As Read As Read As Read As Read 29 As Read 1,058 As Read <3E-9 As Read 1061 As Read As Read As Read As Read 30 As Read 1,088 As Read <3E-9 As Read 1062 As Read As Read As Read As Read 22 As Read 688 As Read <3E-9 As Read 1063 As Read As Read As Read As Read As Read As Read 278 As Read <3E-9 As Read 1092 As Read As Read As Read As Read As Read As Read 419 As Read <3E-9 As Read 1093 As Read As Read As Read As Read 23 As Read 830 As Read <3E-9 As Read 1094 As Read As Read As Read As Read 30 As Read 1,066 As Read <3E-9 As Read 1095 As Read As Read As Read As Read 25 As Read 871 As Read <3E-9 As Read 1096 As Read As Read As Read As Read 20 As Read 468 As Read <3E-9 As Read OTHERS As Read As Read As Read As Read As Read As Read As Read As Read <3E-9 As Read
- FOR CONTROLLER/OBSERVER USE ONLY *
(Not to be provided to players) :
Page 9.4-33 7/12/2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 10.0 EQUIPMENT OPERATION AND REPAIR DATA This section contains the equipment repair information modeled to coincide with the scenario sequence of events. It is designed to be provided to the repair teams who are dispatched from the Operations Support Center (OSC) during the course of the Drill. Equipment data only is provided in this section. For in-plant radiation levels that personnel may encounter during repair activities, Controllers must refer to Table 8.4 of this manual.
The data in this section is to be used to explain both equipment out of service during the initial conditions, and malfunctions that occur later during the response and recovery stages of the Drill. In either case, these events are usually centered on one particular piece of equipment. Thus for this Drill, the following equipment sections have been prepared:
10.1 Equipment Casualties
"* EQ-01 Transformer TR-S Ground
"* EQ-02 RRC-P- 1A/B Vibrations
"* EQ-03 Security report of smoke from A SWPH
"* EQ-04 HPCS-P-2 Motor and Cabling FIRE
"* EQ-05 Closing air start valves for HPCS Diesel Generator
"* EQ-06 SLC-V-lA and SLC-V-1B fail to open
"* EQ-07 Deleted
"* EQ-08 RHR-P-2C motor over-current fault, breaker fails to trip (results in lockout on SM-8)
- EQ-09 RHR-P-2A breaker fails to close due to closing fuse failure
- EQ-10 CEP-V-3A and 4A fail to close
- EQ-11 CAS Air Compressors are reset
- EQ-12 RPS A is reset and the bus is re-powered
- EQ- 14 Transponder Card Failure
- EQ-15 Individual C.R. Scrams (2 controllers)
- EQ-16 Alternate Boron Injection (2 controllers)
- EQ 17 Security Event
- EQ 18 Man Down event Caution: Drill tags are to be hung at the Simulator only. No drill tags are to be displayed or placed on any components in the plant!
Section 10 Page I of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT -TRANSFORMER TR-S Out of Service (EO-01)
Primary discipline: Electrical Initial Controller Instructions:
As part of the initial failure condition:
Transformer TR-S is out of service due to a ground discovered on the 6.9 KV X winding.
BPA electrical maintenance has located the problem. Parts have been ordered are scheduled to be on site at 1800, Tuesday September 17. BPA estimates TR-S will be returned to service by 2100, Tuesday September 17.
If asked about the possibility of expediting the return of TR-S to service inform the individual that everything has already been done to get the parts delivered and replaced as soon as possible.
Nothing more can be done to return TR-S to service any sooner than planned.
Player Instructions:
None Follow-up Controller Instructions:
None NOTE: This repair is not to be completed during the duration of the exercise.
TR-S will NOT be returned to service.
Section 10 Page 2 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - RRC-P-1A (B) VIBRATION (EQ-02)
Primary discipline: Operations Initial Controller Instructions:
As part of the failure sequence:
The Control Room receives a vibration alarm on P602-A6, 2-4 (and 2-8). An Equipment Operator may be dispatched to the RRC-VMP-l panel on RB 522' elevation.
Refer to Figure EQ-02 #1.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
As the EO arrives at RRC-VMP- 1, inform him/her:
"This is a Drill.
These are the alarming channels on RRC-VMP-1:
RRC-VBI-P1A!XS/XY is Around 12 Mils.
RRC-VBI-P1A/MUBXY is about 4 PK-Gs.
RRC-VBI-P1B/XS/XY is Around 13 Mils.
RRC-VBI-P1A!MUBXY is about 4.5 PK-Gs.
Additionally, the rest of the readings for RRC-P-1A and RRC-P-1B are below alarm levels but seem to be elevated from the last log readings.
This is a Drill."
The above information may be issued to the player by showing Figure EQ-2 #1.
Follow-up Controller Instructions:
The EO should be observed communicating this information to the Control Room or OSC/TSC using drill phone numbers.
Section 10 Page 3 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Figure EQ-02 #1 RRC Pump Vibration Monitor Panel RRC-VMP-1 I
SJLi ** M. 0,
[] ~ *0 1 11108] co cc*llm l~*
r~E N NEW 40n Q)0kF-I 0 f 0Q IeG4(;
The following readings are displayed on the above meters:
C =V BI -P 1A /X S / XY SRR is r ea di n g a b o ut 12 Mils .
@ RRC-VB -P1A/MUBXY is reading about 4 PK=Gs.
a RRC-VBI-P1B/XS/XY is reading about 13 Mils.
@ RRC-VBI=P1A/MUBXY is reading about 4.5 PK-Gso oAdditionally, the rest of the readings for RRC-P-1A and RRC-P=IB are below alarm levels but seem to be elevated from the last log readings taken.
Section 10 Page 4 of 42 ,July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - 'A' SWPH SMOKE REPORT (EQ-03)
Primary discipline: N/A Initial Controller Instructions:
As part of the failure sequence:
Control Room Operators receive a FIRE alarms on P601, FCP 1 for SW-A Pumphouse.
Controller Instructions:
Security will notice smoke coming from the "A" Service Water Pump House.
Initiate a call to extension 8832 (Simulator Control Room) and repeat the following:
"This is a Drill.
This is Officer King. There is smoke coming from the ALPHA Service Water Pump House.
This is a Drill."
Follow-up Controller Instructions:
None Section 10 Page 5 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - HPCS-P-2 Motor and Cabling Fire (EO-04)
Primary discipline: Operations/Maintenance Initial Controller Instructions:
As part of the failure sequence:
Control Room Operators receive a FIRE alarms on FCP 1 for SW-A Pumphouse.
Additionally, a call from security will be received in the Control Room with a report of smoke coming from the Pumphouse.
Refer to Figures EQ-04 SW A Pump House, HPCS-P-2 and Electrical Panel Players Instructions:
Once the Fire Brigade has arrive to respond to the fire, the controller at the "A" SW Pump House will inform them:
"This is a Drill.
Looking at the 'A' Service Water Pumphouse you see smoke coming from the relief damper above the personnel access door. The smoke is heavy but seems to be diminishing.
Upon entering the door you see smoke coming from the HPCS SW Pump area and note that it is diminishing. There is no flame; the fire is out.
This is a Drill."
If asked about the condition of SW-P-lA, inform them there is no visible damage to SW-P-lA.
Section 10 Page 6 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Section 10 Page 7 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Section 10 Page 8 of 42 Ju!y 12, 200)2
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - CLOSING OF THE AIR START VALVES FOR THE HPCS DIESEL GENERATOR (E0O-05)
Primary discipline: Operations Initial Controller Instructions:
The Control Room will contact an Equipment Operator and dispatch him/her to the HPCS Diesel Generator Room to close the air start valves. This will prevent a start of the HPCS DG.
Refer to Figures EQ-05 HPCS starting air valve locations Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
Per procedure ABN-SW an EO should be dispatched to close DSA valves to prevent auto start of DG-3. A controller should observe the EO to SIMULATE closing DG-V-2C1/1 and 2C1/2 in the HPCS DG room. When the controller observes the EO simulating closure of each of the air isolation valves he should inform the EO that:
"This is a Drill.
DSA-V-2C 1/1 is simulated closed" and then "DSA-V-2C 1/2 is simulated closed.
This is a Drill."
Follow-up Controller Instructions:
Contact The Lead Controller and inform him that the DSA valves have been simulated closed.
The lead controller will inform the simulator operator who will activate a trigger to simulate the actions taken.
Section 10 Page 9 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE East side isolation valve DSA-V-2C1/t SeVt01n !10 Page 10 of 42 July 12, 20032
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE S
DSA-V-2C1/2 Starting Air Isolation valve is located below grating level here
": *DSA-V-2C1/2 West side isolation valve DSA-V-2C1/2 Section 10 Page II of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - SLC-V-1A and SLC-V-1B FAILS TO OPEN (EQ-06)
Primary discipline: Operations Initial Controller Instructions:
As part of the failure sequence:
When the reactor is scrammed a hydraulic ATWS will occur. Reactor power will be greater than 5% and the crew will initiate Standby Liquid Control. When SLC is initiated as required by PPM 5.1.2, the SLC pump suction valves, SLC-V-lA and IB, fail to open resulting in a failure of SLC-P-lA /1B to start. An EO should be sent to investigate the cause of the failure and to open one or both of the suction valves.
Refer to figures EQ-06.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
When the Equipment Operator arrives at the SLC pump suction valves he/she will be permitted to simulate opening either (or both) valve(s) manually. (Both valves have failed to electrically open.) When the EO has SIMULATED fully opening either SLC-V-1A or 1B, the controller will inform the EO that both of the SLC pumps have started.
"This is a Drill.
The SLC-V-1A or SLC-V-1B is SIMULATED open and both of the SLC pumps are running.
This is a Drill."
The controller must then inform the Lead Controller in the simulator of which valve has been simulated open so the malfunction can be removed to give the simulator proper indication. If both valves are eventually opened the controller needs to supply information when each valve is simulated open.
If the EO chooses to go to the breakers (MC-7Bfor SLC-V-]A and MC-8B for SLC-V-1B) for the valves first they will be informed:
"This is a Drill.
You observe nothing wrong with either one of the breakers. Each breaker appears to be in a normal lineup with each breaker open.
This is a Drill."
Section 10 Page 12 of42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Follow-up Controller Instructions:
None Figure EQ-06 6Lu pit overview To operate the valve manually the blue arm needs to be pushed downward to engage the handwheel. The handwheel then should be turned counter clockwise until the valve is 100% open as indicated by the position indicating device or picking up of the open limit sw'tch.
Section 10 Page 13 of42 Ju[N i2, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE SLC-V-1B SLC-VolA section i0 Page 14 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Deleted Section 10 Page 15 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - RHR-P-2C MOTOR OVER-CURRENT FAULT; BREAKER FAILS TO OPEN; LOCKOUT ON SM-8 (EQ-OS)
Primary discipline: Electrical Initial Controller Instructions:
As part of the failure sequence:
At 1040 a fault of the RHR-P-2C motor will cause an over-current condition in the pump motor. The RHR-P-2C breaker on SM-8 will fail to open. Consequently, a lockout on SM-8 will occur. The Control Room/OSC should request a repair team be dispatched to investigate the RHR-P-2C breaker and the subsequent SM-8 lockout.
Refer to figures EQ-08.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
When the repair team investigates the REHR-P-2C breaker inform them that the breaker for RHR P-2C is still closed. The red light on the front of the breaker is illuminated. If asked about the status of the 86 lockout, inform them that it is in the tripped position.
If the Repair Team attempts to open the breaker for RHR-P-2C by depressing the trip plunger, inform them that the breaker is still closed.
If the repair team attempts to rack out the RHR-P-2C breaker inform them that the racking tool cannot be turned. If more force is applied inform the Repair Team that the pin on the racking bar has sheared off.
Follow-up Controller Instructions:
NOTE: This repair is not to be completed during the duration of the exercise.
The breaker for RHR=P-2C will not be racked out during the exercime, Section 10 Page 16 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE SM-8 Switchgear section 10 Page 17 of42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RHR-P-2C breaker front indications Section 10 Page 18 of 42 30y 12, 20102
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - RHR-P-2A FAILURE TO START (EO-09)
Primary discipline: Electrical/Operations Initial Controller Instructions:
As part of the failure sequence:
On the ECCS start signal, RHR-P-2A will fail to auto start. Control Room operators will note no light indication for the pump on their control room panel. The failure is a blown close power fuse at the breaker on SM-7. They should request a repair team be dispatched to investigate the breaker for RHR-P-2A.
Refer to Figures EQ-09.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
After the Repair Team players arrive at the SM-7 switchgear and locate the RHR-P-2A breaker cubicle and when initially asked what do they see, perform the following:
Show the players Fig. EQ-09 #2, representation of the front of the RHR-P-2A Cubicle and inform them:
"This is a drill.
The green light is illuminated on the front of the cubicle. Additionally the 86 device is NOT tripped.
This is a drill."
When the Repair Team indicates they would open the cubicle door show them picture EQ-09 #3.
The Repair Team should inform you that they would pull the Trip and then the Close fuse block and perform a continuity check on them. When they do inform them:
"This is a drill.
The continuity check revealed no continuity in the fuses in the close fuse block.
This is a drill."
Section 10 Page 19 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information they now have.
They should be instructed to replace the fuses with a like for like replacement.
When the Repair Team returns with the replacement fuses and replaces the Close fuses (they may also replace the trip fuses) inform them that the repair has been successful.
Then inform them that due to the timeline of the scenario that they need to wait to report the completion of the task until 1150. Keep all members of the Repair Team in the SM-7 switchgear room.
At 1150 allow the Repair Team to contact the Control Room or OSC with the information that the fuse has been successfully replaced and the fuse blocks have been reinstalled. There may be some communication between the simulator control room and the Repair Team to coordinate fuse replacement. If this coordination occurs, inform the Lead Controller in the Simulator when the team simulates installing the fuse block so the malfunction can be deleted at the correct time.
Additionally, contact the lead Controller in the Simulator and inform him that the Repair Team has completed the repair on the RHR-P-2A breaker.
The lead controller will inform the simulator booth operator to delete the malfunction on RHR-P 2A breaker which will give back control of the pump to the Control Room.
Section 10 Page 20 of 42 Muy 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Figures EQ-09 SM-7 switchgear Section 10 Page 21 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE JAUTIO RHR-P-2A breaker front (EQ-09 #2)
Section t Pagee222 of 42 July 12, 21C02
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 13 f o mg b i ubc Trip and Close fuse block in R-HR-P-2A cubicle (EQ-09 #3)
Section 10 Page 23 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - CEP-V-3A and CEP-V-4A FAIL TO CLOSE (EQ-10)
Primary discipline: Electrical/Operations Initial Controller Instructions:
As part of the failure sequence:
When the signal for automatic closure (F,A, or Z signal) of CEP-V-3A and CEP-V-4A is received both valves will fail to close.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
If a Repair Team is sent to the Reactor Building elevation 471' North East comer, they would have to look up into the overhead to see CEP-V-3A and CEP-V-4A. The valves are at the 491' elevation. If asked the Repair Team can see nothing wrong with the valves from the floor.
If the Repair Team is in the Reactor Building: At 1045 (at that time the simulator booth operator will be activating a leak between CEP-V-3A and CEP-V-4A) inform them that a leak has just formed on the downstream side of CEP-V-4A from a crack in the piping and they need to evacuate the area immediately.
MAKE THEM LEAVE IMMEDIATELY!!
Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information they now have on the leak in the Reactor Building.
Section 10 Page 24 of 42 Juiy 12, 20102
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - RESETTING THE CAS AIR COMPRESSOR TRIPS (EQ-11)
Primary discipline: Operations Initial Controller Instructions:
As part of the scenario, the CAS Air Compressors will become de-energized. To restart them the local reset pushbuttons for each compressor needs to be depressed.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
If a Repair Team is sent to the Turbine Building elevation 441' South East comer to reset the air compressors allow them to reset them per procedure. You should have a marked up copy of the procedure to follow their actions.
Once they have completed required actions inform them that the air compressors have been reset and are running as system configuration in the Control Room dictates.
Inform the Lead Controller in the simulator that the air compressors have been reset. The lead controller will inform the booth operator who will insert the appropriate trigger to simulate the actions of the Repair Team.
Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information they reset the CAS air compressors and the A CAS Air Compressor is running.
Section 10 Page 25 of 42 July 12, 20)02
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE PICTURE OF CAS A]
PICTURE OF RESET PUSHBUTTON ON CAS COMPRESSOR LOCAL PANEL Donotpermitair
='thdi S..0n ru.1cot (bodstuffox In tull complýapt FDA
=lft d 2trFIV17a.3m.
and all other blaetuand' local, codes.
standardsand regulations.
Section 10 Page 26 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - RESTART RPS A AND CLOSE ASSOCIATED EPA BREAKERS (EQ-T2)
Primary discipline: Operations Initial Controller Instructions:
As part of the scenario SM-7 will become de-energized and re-powered from TR-B. When the transfer occurs, the RPS MG set will lose power and have to be restarted.
Refer to figures for EQ-12.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
If a Repair Team is sent to the Vital Island to restart the A RPS MG set allow them to perform the actions per PPM 2.7.6 sections 5.1 and 5.3.
As the operator proceeds with each step of the sections, provide the necessary cues that the step has been completed satisfactorily.
When the operator has completed Section 5.1, inform the operator that the A RPS MG set is running.
When the operator has completed Section 5.3, inform the operator that the EPA breakers are closed and the A RPS Bus has been re-energized.
Inform the Lead Controller that the Repair Team has re-energized the A RPS MG bus.
The Lead Controller will inform the booth operator who will insert the appropriate steps to restart and re-power the A RPS bus.
Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information that they have re-powered the A RPS bus.
Section 10 Page 27 of 42 M3,ly12, 20102
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RPS MC SET A IS LOCATED IN THIS ROOM Fi ure #1 LO(?AL PANEL FOR RPS A MG SET Fi ure #2
- . 1U Section 18 Page 28 of42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE INITIAl, T1."VA1 PANJTVIN TCV'%dATTCnNTQ IW TInNq AFTER- CnMPI FWTTfN nOV Q1WTl9bnTV I t E-CP-C72/Soo1A ~ .
Section 10 Page 29 of 42Juy2,02 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RPS-EPA BREAKER 3A - AS FOUND - Figure #6 LIGHT ON *:;' LIGHT OUT 17 1
SLIGHTS OUT mm C7-
ŽŽs 03A DIV-A .
. 11 Seetion ! 0 Page 30 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RPS-EPA BREAKER 3A - AFTER COMPLETION OF STEP 5.3.3 - Figure #7 LIGHT ON * <LIGHT ON1 F
U S2 C SO03-A fl 4 44L
- RPS-EPA BREAKER 3C - AS FOUND - Figure #8 LIGHT ON < LIGHT OFF I
>1 sI S2 07 j-*SOO 3-C r-\- \ I - A Section 10 Page 31 of 42 Ju!y 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RPA EPA BREAKER 3C AFTER COMPLETION OF STEP 5.3.4 - Figure #9
-I 11-1 1; LIGHT ON HToON LIG...
RPS I,%' - 14 SI S2 /¢ 07 SS 0 0 3C r"<T\/ __ A Section 10 Page 32 of 42 Ju~y 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - FAILURE OF MET-CPL-1A (EQ-13)
Primary discipline: I&C Initial Controller Instructions:
During the initial response to the ALERT, the Control Room will note that they have experienced a loss of Wind Speed and Wind Direction indication on BOARD L.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
A Repair team could be sent to the Control Room or to the MET Tower.
If a Repair Team is sent to the Control Room they will find nothing wrong with any of the meters except that none of the four meters are receiving an input. All other indications are normal.
The Repair Team sent to the MET tower will be shown Figure EQ-13 Figure #1 when they ask what they see when looking at MET-CPL-1A.
The Repair Team should SIMULATE an attempt to re-seat the Analog Input PLC Card for the card with the light out. When the card is SIMULATED as being re-seated give the Repair Team Figure #2 and inform them that the light is now illuminated and all indications and readings are normal.
Inform the Lead Controller that the Repair Team has re-seated the PLC card.
The Lead Controller will inform the booth operator who will delete the appropriate malfunctions.
Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information that they have.
Section 10 Page 33 of 42 July 12, 200)2
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EQ-13 Figure #1 Section 10/ Page 34 of 42 July 12, 200{2
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EQ-13 Figure #2 Section 10 Page 35 of 42 July I2, 20)02
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - TRANSPONDER CARD FAILURE (EQ-14)
Primary discipline: I&C Initial Controller Instructions:
A Failure of a transponder card will occur at 0900.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
A Repair team could be sent to the Control Room to investigate, or to the MET Tower.
If a Repair Team is sent to the Control Room they will find nothing wrong with any of the meters except that none of the four meters are receiving an input. All other indications are normal.
The Repair Team sent to the MET tower will be shown Figure EQ- 13 Figure #I when they ask what they see when looking at MET-CPL- 1A.
The Repair Team should SIMULATE an attempt to re-seat the Analog Input PLC Card for the card with the light out. When the card is SIMULATED as being re-seated give the Repair Team Figure #2 and inform them that the light is now illuminated and all indications and readings are normal.
Inform the Lead Controller that the Repair Team has re-seated the PLC card.
The Lead Controller will inform the booth operator who will delete the appropriate malfunctions.
Follow-up Controller Instructions:
The Repair Team should contact the Control Room or OSC with the information that they have.
Section N0 Page 36 of 42 July 12, 20072
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE RDCS CONTROL ROOM PANEL OVERVIEW - F Il,, A Y Il :
- I i J4i~i
ALTLOCAIONMA IN*DICATIONSI l TRANSPONDER lIAFTERCARD FAILUE-Fiue#
oWým 2.m2l0 ll 62 6 -
35 ~ mm - -s,-4.---I.
-9 sl 5? L1 L;: 64 L15 - n1 3 D ES . . .. , ....... *i Section 10 Page 37 of 42 J!uly 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - Venting of CRD Over-Piston Area (EQ-6)
Primary discipline: Operations Initial Controller Instructions:
As part of the sequence of events, the control rods fail to automatically insert (SCRAM) and shut down the reactor. The Control Room receives an alarm, "SDV NOT DRAINED" on P603.A8.6-2.
A Repair Team may be dispatched to individually insert control rods (one at a time) by manually venting CRDM over-piston area per PPM 5.5.11, Section H.
Refer to PPM 5.5.11, Sections G, H & I for details.
Refer to Table 8.4 for radiation dose rates in the area of the affected equipment.
Player Instructions:
Inform the players that their actions are to be simulated and that they should walk through their actions and describe to the Controller what they would do and how they would do it.
Follow-up Controller Instructions:
NOTE: The time between simulated manual insertions of control rods must be controlled by the Controller to between 5 and 10 minutes for each control rod. This effort must be closely coordinated with the Simulator Lead Controller.
As each control rod is inserted, the Controller should inform the Simulator Lead Controller of the control rod number inserted prior to allowing the players to contact the Control Room.
References:
PPM 5.5.11, Sections G, H, & I.
section 10 Page 38 of 42 Suly 12, 20102
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - Venting of CRD Over-Piston Area (EQ-15)
Section 10 Page 39 of 42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - Venting of CRD Over-Piston Area (EQ-15) section 10 Page 40 of42 july 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - EXPLOSIVE DEVICE DISCOVERED IN BRIEF CASE VIA X-RAY (EQ-17)
Primary discipline: Security Event - Drill player will enter the search area in the PAAP. Upon completing the search by the explosive detector, the player will place a brief case on the X-ray unit. Inside the brief case will be a non-operable, training explosive device. The briefcase will be X-rayed by the unit operator. Upon discovery of the explosive device, the operator will take the appropriate action.
Initial Controller Instructions:
The controller will be standing next to the X-ray unit operator. The station is in an Emergency event at this time.
Player Instructions:
As the player with the briefcase enters the explosive detector, inform the X-ray unit operator and other security personnel in the area:
"This is a drill" "This is a drill" "The briefcase that the person is carrying contains a training explosive device. After you see the explosive device in the X-ray unit, take the necessary appropriate action. DO NOT DRAW YOUR HANDGUN OR RIFLE."
"This is a drill" Follow-up Controller Instructions:
The security officers should be observed using verbal commands to the player, isolating the explosive device in the X-ray unit, controlling the player, and communicating with the CAS, SCC and security supervisor.
Additional Controllers:
Central Alarm Station Upon initiation of event, inform CAS operators that this is a drill. Also inform the security supervisor in CAS that this is a drill and take appropriate action.
Security Communications Center Coordinate with the controller in the search area. Inform the SCC operators that this is a drill and take appropriate action.
Section 10 Page 41 of42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE EVENT - Contaminated Injured Man (EQ-18)
Primary discipline: PET Initial Controller Instructions:
Event begins with an injured and potentially contaminated person discovered lying on the floor of the 437' Radwaste Building near the entrance to the elevator. The individual is in great pain do to a broken right arm. The individual was carrying a container of approximately 500 ml of potentially contaminated fluid, which was to be delivered to the Chemistry lab. The individual's Back and left shoulder areas are wet.
Controller Instructions:
The event will be initiated by a call to the Simulator Control Room x8832.
"This is a drill" "This is a drill" There is an injured person near the elevator on the Radwaste 437 elevation. The person appears to be in great pain and requires medical assistance.
"This is a drill" Player Instructions Plant Emergency Team should respond to the injured person and address both the injury and potential contamination.
Hanford Fire and Rescue should be called to transport the individual via ambulance.
Follow-up Controller Instructions:
The drill will be terminated when the individual has been placed in the Hanford Ambulance for transport.
References:
PPM Section 10 Page 42 of42 July 12, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 11.0 CONTROL CELL MESSAGES The following messages will be delivered from the Control Cell to the other emergency centers to simulate rumors and misinformation reported by other organizations, the media or discovered by the Phone Teams.
Section 11 Page I of 15 Muy 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE GENERAL INSTRUCTIONS: Do not accept system acronyms or Columbia Generating Station jargon. Demand that 'RIHR' be described, i.e., 'Residual Heat Removal System.' If you feel that the called agency might not understand what Residual Heat Removal means, play ignorant and ask for an explanation.
11.1 CONTROL CELL MESSAGES Time-Critical Messages:
Verify scenario progress with the Lead Controller before issuing the following messages.
0730 Message 3, Section 7. May be performed by Lead Controller in Simulator.
1000 Message TV Deliver in person to TV/Radio Monitor in JIC Phone Team Room.
1115 Message TV Deliver in person to TV/Radio Monitor in JIC Phone Team Room.
1154 Message TV Deliver in person to TV/Radio Monitor in JIC Phone Team Room.
1230 Message TV Deliver in person to TV/Radio Monitor in JIC Phone Team Room.
Verify scenario progress with the Lead Controller before issuing the above messages.
Section 11 Page 2 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE GENERAL INSTRUCTIONS: Do not accept system acronyms or Columbia Generating Station jargon. Demand that 'RHR' be described, i.e., 'Residual Heat Removal System.' If you feel that the called agency might not understand what Residual Heat Removal means, play ignorant and ask for an explanation.
Bonneville Power Authority Location: Control Cell Time Response 0930: First,verify with Lead Controller that reactorpower has droppedmore thanplanned.Call Control Room at 8978, identify yourself as __ from BPA, Dittmer dispatch center, and ask why plant is down. (Powershould have been lowered to only 60% by 1000.)
1100: First,verify with Lead Controllerthatplant is at a GeneralEmergency. Call Control Room at 8978, now that you know that plant is in a General Emergency. Ask how long they think the plant will be off line. (This is a nuisance call. They should refer you to the EOF Manager or someone else in the EOF.)
If you get referred to the JIC, remind the caller that you are the BPA and you need power, not news.
Call the EOF Manager at 8180 and ask the same question. The EOF manager should give you a brief synopsis of the situation. If he is not cooperative, remind him that you are BPA, it's hot, and we need the power.
Contingency: If asked to expedite getting TR-S back on-line, tell the caller that the replacement parts for the ground bus monitors are en route from Utah. Expected time of arrival is around 1700.
Installation and testing are a minimum of four hours.
Section 11 Page 3 of 15 Muy 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE GENERAL INSTRUCTIONS: Do not accept system acronyms or Columbia Generating Station jargon. Demand that 'RHR' be described, i.e., 'Residual Heat Removal System.' If you feel that the called agency might not understand what Residual Heat Removal means, play ignorant and ask for an explanation.
INPO About 1130 - Call EOF Manager at 8180. "This is at INPO. We just heard about your General Emergency. What help do you need from us?"
Contingency: If asked by EOF Engineering to provide assistance, get details on what they need.
Wait approximately one hour and make up a story about which plants are sending what people or material. Call that 'information' back to the EOF Manager (8180) or EOF Engineering Manager (8185).
Take notes on above calls and briefly record responses. They will be compared to the expected responses for this scenario. Thank you for your participation.
Section 11 Page 4 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE GENERAL INSTRUCTIONS: Do not accept system acronyms or Columbia Generating Station jargon. Demand that 'RHR' be described, i.e., 'Residual Heat Removal System.' If you feel that the called agency might not understand what Residual Heat Removal means, play ignorant and ask for an explanation.
ENGINEERING, GENERAL ELECTRIC, Other Outside Contacts This is both an active and a passive role: players should simulate calls for assistance to vendors, etc., by calling your control cell number. If asked for assistance, give reasonable answer, depending on who is being called (GE, Engineering, ANI, vendor, etc.)
Example scripts:
GE: For request for assistance - "We'll have our team there by 7:00 p.m. tonight."
Vendor: "We can have it on the plane by this afternoon."
FFTF: About 1030, call Control Room Shift Manager at 8978. - "This is at FFTF.
Are you guys in trouble? Good thing we're shut down. Let us know if you've got a problem we can help with. My number is 376-5555."
Cooper Station: between 1105 and 1125 - Call Control Room at 8978. "This is Albert Jackson at Cooper. We heard you guys are at a Site Area Emergency. What's going on?"
The above is a nuisance call. Expected response should be to ask you to call the EOF Manager or call back in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
You may also be called as the following:
Chemistry - See Section 8 of the Drill Manual. Delay issuing requested information for 45 minutes. Chemistry personnel are assigned to the OSC and should be contacted for sample analysis. If the Control Room or TSC calls you, notify the Lead Controller.
Energy Northwest Corporate officers - EOF or JIC may call requesting that Vic Parrish, Greg Smith, or Rod Webring address media or some government official. Take a message and agree to call back. Discuss request with Lead Controller.
FAA - Agree to requests for airspace closures Hanford Fire Department - Agree to roll units from FFTF. Give an ETA of approximately 10 minutes from the time of the call. Accept call from either CAS (Security) or Control Room. Ask for details such as location of victim, fire, etc.
Section 11 Page S of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE GENERAL INSTRUCTIONS: Do not accept system acronyms or Columbia Generating Station jargon. Demand that 'RHR' be described, i.e., 'Residual Heat Removal System.' If you feel that the called agency might not understand what Residual Heat Removal means, play ignorant and ask for an explanation.
(NOTE: most of this detail will be handled by radio after the response units are en route.)
Local Law Enforcement Agency - You may be asked to send an officer or deputy to the plant to take custody of an offender. Agree to do so and give an ETA of 15 minutes from the time of the call.
National Weather Service - weather report, see page 9-1 of controller manual for forecast information.
US Coast Guard - Agree to place river closures in Notice to Mariners. Do not agree to physically close the Columbia River. If so requested, remind the caller that this is the responsibility of the counties.
Do NOT accept calls for the following:
State of Washington State of Oregon Benton County Franklin County Any EN Emergency Center If you have a question as to how to frame an answer, contact the Lead Controller.
Take notes on above calls and briefly record responses. They will be compared to the expected responses for this scenario. Thank you for your participation.
Section 11 Page 6 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE NRC ENS (Emergency Notification System)
Your role is to act as the NRC respondent at NRC Headquarters and later as the Region IV response team. During the first call, ask only the most basic questions from the EVENT NOTIFICATION WORKSHEET, NRC Form 361, SS Form 968-25665. The NRC responders manning the response center are very qualified and have worked at various nuclear power plants. Acting as one of these persons, you may use as much of your own expertise as necessary to pose relevant questions to the ENS caller, using the guidance in the letter below.
The first call should be from the Control Room. Do NOT let the ENS caller hang up without your permission. They should give you a callback number on the first call. After the first call, NRC Headquarters will notify Region IV, who will call the number given in the first call. The TSC NRC Liaison should answer the call, if the first caller gave the correct number. NRC HQ will have briefed the Region IV team on the status as of the end of the first call.
The Response Team at Region IV is initially trying to assess the situation and determine whether additional NRC resources are required, up to and including dispatching a response team to Columbia Generating Station. Work with the Lead Controller to determine the progress of the scenario. If you believe that the TSC NRC Liaison should know a major piece of information, ask a leading question, such as, "What is the current reactor water level?" The NRC Liaison should be able to obtain or should received significant status information with 15 minutes of its occurrence. Let the Lead Controller know if the NRC Liaison is consistently unaware of significant plant events or status.
Demand that acronyms be sounded out, e.g., "Valve 24Alpha." Also request the caller to sound out system and equipment names., e.g., "Residual Heat Removal" instead of"RHIR". Also insist that the caller walk you through the Emergency Action Level classification. You may accept "RHR", etc., later if the caller has been consistent in using the full system name.
You should always ask whether there is a release path to the environment. If there is, ask CGS if they are disclosing to the media that there is or was a release. Regardless of the answer, if there is a path to the environment, advise the caller that the NRC will announce that Columbia Generating Station is releasing to the environment. You will want to know the projected dose rate at the site boundary.
Section 11 Page 7 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE G12-98-026 Received 3/2/98 March 2, 1998 NRC INFORMATION NOTICE 98-08: INFORMATION LIKELY TO BE REQUESTED IF AN EMERGENCY IS DECLARED Addressees:
All Parts 30, 40, 70, 72, and 76 licensees and certificate holders required to have a Nuclear Regulatory Commission-approved Emergency Plan.
Purpose:
NRC is issuing this information notice to provide the addressees with the information expected by NRC when an Alert or Site Area Emergency is declared, in accordance with an NRC-approved Emergency Plan. It is expected that the recipients will review the information for applicability to their facilities and consider actions, as appropriate. However, suggestions contained in this information notice are not NRC regulations; therefore, no specific action nor written response is required.
Description of Circumstances:
NRC participated in a gaseous diffusion plant emergency exercise in September 1997. During the lessons-learned session, the NRC identified the need to promptly obtain certain essential time sensitive information from the affected facility to independently assess potential health and safety consequences, to evaluate the facility's condition, and to determine the adequacy of the facility's protective measures.
Discussion:
When the NRC Operations Center is activated, the NRC emergency response teams will be called in to staff the Operations Center. The NRC emergency response teams monitor the licensee's/certificate holders' response to ensure timely communication and coordination of safety or safeguards significant information; evaluate the licensee's/certificate holders' current and longer term response to the event; and ensure the protection of the worker, the public, and the environment.
Information Notice 93-60 and its Supplement were issued to alert the addressees of issues associated with the initial reporting of safety-related events to the NRC Operations Center. After the initial reporting, if the NRC Operations Center is activated, NRC will request additional information from the regulatee. The regulatee's personnel communicating with NRC should be knowledgeable with the facility's operation and with the event to provide and update information about the evolving incident. The level of communication between NRC and the regulatee will Section 11 Page 8 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE depend on the development and the significance of the event. The following is a list of sample questions, which are not exhaustive, that may be asked during an emergency:
- 1. Is there any change to the classification of the event? If so, what is the reason?
- 2. What is the ongoing/imminent damage to the facility, including affected equipment and safety features?
- 3. Have toxic or radiological releases occurred or been projected, including changes in the release rate? If so, what is the projected onsite and offsite releases, and what is the basis of assessment?
- 4. What are the health effect/consequences to onsite/offsite people? How many onsite/offsite people are/will be affected and to what extent?
- 5. Is the event under control? When was control established, or what is the planned action to bring the event under control? What is the mitigative action underway or planned?
- 6. What onsite protective measures have been taken or planned?
- 7. What offsite protective actions have been recommended to State/local officials?
- 8. What is the status of State/local/other Federal agencies' responses, if known?
- 9. If applicable, what is the status of public information activities, such as alarm, broadcast, or press releases (regulatee/State/local/other Federal agencies)? Has a Joint Information Center been activated?
Related Generic Communications:
The following related communications and correspondence are noted:
"* NRC Information Notice 93-60, "Reporting Fuel Cycle and Materials Event to the NRC Operations Center," August 4, 1993.
"* NRC Information Notice 93-60, Supplement 1, "Reporting Fuel Cycle and Materials Event to the NRC Operations Center," October 20, 1994.
This information notice requires no specific action nor written response. If you have any question about the information in this notice, please contact one of the technical contacts listed below or the appropriate regional office.
/s/'d Elizabeth Ten Eyck, Director Division of Fuel Cycle Safety and Safeguards July 3, 2002 Section Page 9 of IS SectIon 11 11 Page 9 of 15 July 3,2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Office of Nuclear Material Safety and Safeguards Technical contacts:
Yen-Ju Chen, NMSS (301) 415-5615 e-mail: yjc@nrc.gov Kevin M. Ramsey, NMSS (301) 415-7887 e-mail: kmr@nrc.gov Section 11 Page 10 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE 11.2 MEDIA AND RUMOR CONTROL MESSAGES MESSAGE NO.: TV-1 TIME: 1000 MESSAGE FOR: JIC TV/Radio Monitor FROM: Lead Controller LOCATION: Joint Information Center XXXXXXXXXXXXXXXXXX THISISADRILL 3CXXXXXXXSCXC CXXXXX PLAYER INSTRUCTIONS:
The following simulates a broadcast of news regarding an emergency at Columbia Generating Station on September 17, 2002.
You saw and heard the following on local television, KNDU, NBC Channel 25, at about 10:00 am:
"This is George Clueless with NBC affiliate KNDU in the Tri-Cities of Washington state. I'm here at the border between Richland and its next-door neighbor, the Hanford Atomic Reservation, where most of the nation's cold war atomic waste is either buried or stored in leaky tanks.
"A nuclear reactor operated by Energy Northwest suffered a major fire earlier today. So far, only the Hanford reservation, with its many goverunent workers, has been evacuated. None of the nearby towns, such as Richland, have been ordered to evacuate their citizens. The question now is why hasn't this been done and when will it be done?
"Back to you, Charlie."
"That was George Clueless, at Hanford. Stay tuned for an update as soon as we get more details on this unfolding tragedy."
Further Player Instructions: you may re-read this message to other players to simulate replaying a videotape. Do not give this message to anyone else. If you need to pass on the message, do so by rewriting a brief synopsis in your own words.
CONTROLLER INSTRUCTIONS
- 1. Deliver this message to the individuals monitoring TV and radio broadcast at the appointed time. Do not deliver this message unless the radio and TV monitoring is active.
XXXXXXXXXXXXXXCXXIXXXXX THIS ISA DRILL XXXXXXXXXXXXXXXXXXXXXXI*X DO NOT INITIATE ACTIONS THAT MAY AFFECT PLANT OPERATIONS DO NOT INITIATE ACTIONS THAT MAY VIOLATE SAFETY RULES X3XKKXKX 33XXXXXCKI XXXXX THIS ISADRILL XXXSCXXXXXXXX33CXXXXXXXXXXXXX Section 11 Page 11 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE MESSAGE NO.: TV-2 TIME: 1115 MESSAGE FOR: JIC TV/Radio Monitor FROM: Lead Controller LOCATION: Joint Information Center XXX3CXXXXXX XXX THISISADRILL 3C2C3XXXX3CXXXXXXXX PLAYER INSTRUCTIONS:
The following simulates a broadcast of news regarding an emergency at Columbia Generating Station on September 17, 2002.
You saw and heard the following on local television, KEPR, CBS Channel 19, at about 11:15 am:
"I'm standing here in front of the City Hall in downtown Richland, Washington, site of the plutonium production for the world's first atomic bomb. As you can see, the traffic to my right, on George Washington Way, the principal thoroughfare from the Hanford Works through Richland, is crowded with stop-and-go traffic headed south.
"Sources at the local counties tell us that they are under evacuation orders due to the accident at the state's only nukular power plant, only ten miles north of here. Citizens here near City Hall tell me they have heard nothing about any evacuation. It makes one wonder what kind of plans were in place for just this kind of accident.
"KONA, one of the local radio stations, has broadcast a message about evacuation, but it only applies to a sparsely populated area along the Yakima river about ten miles from the troubled nuke plant. This city of about 35,000 has been ignored for the time being. Officials here in Richland tell us that Benton County, which maintains an emergency center a few miles from here, will tell them if they need to leave.
"With a 1200-megawatt reactor so close by, you'd think that all of Richland would have emptied out as soon as the first alarm went off.
"This is Amanda Nonuke, KEPR, in downtown Richland."
Further Player Instructions: you may re-read this message to other players to simulate replaying a videotape. Do not give this message to anyone else. If you need to pass on the message, do so by rewriting a brief synopsis in your own words.
CONTROLLER INSTRUCTIONS
- 1. Deliver this message to the individuals monitoring TV and radio broadcast at the appointed time. Do not deliver this message unless the radio and TV monitoring is active.
XXXXXXXXXXXXXXXXXXXX THIS ISA DRILL XXXXXCXXXXXXX XXXXXXXXXXXX DO NOT INITIATE ACTIONS THAT MAY AFFECT PLANT OPERATIONS DO NOT INITIATE ACTIONS THAT MAY VIOLATE SAFETY RULES XX3CXXXXXXXXXXXXXXX3XXX THISISADRILL X3CX3CXX3CCXXXXXXX2CXXXXXXXXX Section 11 Page 12 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE MESSAGE NO.: TV-3 TIME: 1145 MESSAGE FOR: JIC TV/Radio Monitor FROM: Lead Controller LOCATION: Joint Information Center X2CXXXXXXXXXXXXXX3C THISISADRILL XX XXXX*cXXXXXXXX PLAYER INSTRUCTIONS:
The following simulates a broadcast of news regarding an emergency at Columbia Generating Station on September 17, 2002.
You heard the following on local radio, KXRX, 97.1 FM, at about 11:45 am:
"Breaking from our usual music repertoire, here's a little late-breaking news about the situation with the reactor at Hanford.
"Governor Locke has declared a state of emergency at Hanford and Benton and Franklin Counties. The Governor's office had no further details. A Spokesman for Washington Emergency Management mentioned to us that the state Emergency Center at Camp Murray was staffed up and that state people were on the scene at Hanford.
"Sounds like the US Department of Energy has let another nuke plant go downhill.
"We'll break into our regular schedule of the latest in today's music to keep you up-to-date on the accident at the old 'Whoops' plant."
Further Player Instructions: you may NOT re-read this message to other players, since there is no mechanism for recording radio broadcasts. Do not give this message to anyone else. If you need to pass on the message, do so by rewriting a brief synopsis in your own words.
CONTROLLER INSTRUCTIONS
- 1. Deliver this message to the individuals monitoring TV and radio broadcast at the appointed time. Do not deliver this message unless the radio and TV monitoring is active.
XXXXXX XX3CXXX3CXSCXXXXIXXX THIS ISA DRILL X3XXICXXXX*XX2XXXXXXCXXXXXXXXX DO NOT INITIATE ACTIONS THAT MAY AFFECT PLANT OPERATIONS DO NOT INITIATE ACTIONS THAT MAY VIOLATE SAFETY RULES 8XXXCgC2CXX3XXXXXXXXCXXXX THISISA DRILL XXX2CXXX*g XXXXXXXXXXXXXXXX Section 11 Page 13 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE MESSAGE NO.: TV-4 TIME: 1230 MESSAGE FOR: JIC TV/Radio Monitor FROM: Lead Controller LOCATION: Joint Information Center X* XXXX*3*gX 3X3CX§CX3XXX gXX THISISADRILL XXX3C3XX 3CSCXXX§CXCCXXX PLAYER INSTRUCTIONS:
The following simulates a broadcast of news regarding an emergency at Columbia Generating Station on September 17, 2002.
You saw and heard the following on local television, KEPR, CBS Channel 19, at about 12:30 p.m.:
"This is George Clueless with NBC affiliate KNDU in the Tri-Cities of Washington state. I'm here outside the Benton County Emergency Center, about two miles west of Richland, Washington. Just a few minutes ago, one of the workers here said that they had been told that workers at the troubled 'Whoops' power plant north of here had finally closed off the leak from their reactor. For the last three or four hours, the reactor, now owned by a consortium called Energy Northwest, has been spewing radioactive fluid all over the surrounding area.
"Although Energy Northwest officials contend that the plant is no longer leaking radiation, according to our resident meteorologist Brad Windscale, the winds continue to spread contamination over a wide swath of the Columbia Basin. So far, only Benton County has stated that they have evacuated their citizens. However, that evacuation order affected only a few citizens in the Horns Rapids area. None of the remaining 35,000 citizens of Richland have received any instructions. The affected area also borders Adams, Grant, Benton and Yakima Counties.
We contacted officials in all of those counties and found that none of them have issued any evacuation orders. Also, the Horse Heave Hills, a major agricultural area, is only a few miles further downwind of the accident in Benton County. If current weather conditions prevail, this vital wheat-growing land could be next in line for a dose of deadly radiation. If the winds change, which they do frequently in this part of the country, the other counties may face the same fate.
"Back to you, Charlie."
"That was George Clueless, at Hanford. Stay tuned for an update as soon as we get more details on this continuing tragedy."
Further Player Instructions: you may re-read this message to other players to simulate replaying a videotape. Do not give this message to anyone else. If you need to pass on the message, do so by rewriting a brief synopsis in your own words.
CONTROLLER INSTRUCTIONS
- 1. Deliver this message to the individuals monitoring TV and radio broadcast at the appointed time. Do not deliver this message unless the radio and TV monitoring is active.
X*9XXXXXXXXXXXXXXXXXXX THISISADRILL XXXXXXXXXICICXXXXXXXXXXXXXXI DO NOT INITIATE ACTIONS THAT MAY AFFECT PLANT OPERATIONS DO NOT INITIATE ACTIONS THAT MAY VIOLATE SAFETY RULES XXXCXXXXXXXXXXXXXXXXCX THIS ISA DRILL CXXXXXXXXXXXXXXXXXXXXXXXXX Section 11 Page 14 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 EMERGENCY EXERCISE Section 11 Page 15 of 15 July 3, 2002
COLUMBIA GENERATING STATION 2002 INGESTION EXERCISE 12.0 INGESTION PHASE This section of the Exercise Manual discusses the Day 2 ingestion activities. This timeline is a description of the expected flow of events depicting activities that would take place over several weeks. The timeline integrates activities of Energy Northwest and participating off-site agencies.
NOTE: The data following this section is a summary of the values to be used to develop simulated environmental sample results and field survey results. The actual data derived from these summaries will be delivered to the players as they earn the information.
Clock Time Detcrintinn 0700 EOF Briefing delivered by state health liaison. Controller input includes:
"* Final PARs/CNF for day one.
"* QEDPS2 printout for day one.
"* EDPS projection.
"* Air space closure form for day one.
"* Data points placed on ten-mile EPZ map for day one and overnight activities.
Note: Simulated Day Two activities.
0715 Initial return PAR activities begin.
0900 County and State briefings for ingestion phase activities at EOCs.
0930 Initial return PAR package completed and faxed to offsite EOCs. EOF briefing delivered by state health liaison.
0945 Crash call initiated by state health liaison to offsite EOCs. Relocation and revised return PAR activities begin with isopleth planning and survey process. Controller input includes:
"* AMS flyover data (1000 microR/hr - 100 microR/hr).
"* Field team control cell for verification of 500 microR/hr isopleth (5 data points).
"* Pre-generated map indicating complete 500 microR/hr isopleth.
Note: Simulated Day Two through Day Three activities 1130 Relocation and revised return PAR package completed and faxed to offsites. EOF briefing delivered by state health liaison.
1145 Crash call initiated by state health liaison to EOCs. Food control PAR activity begins. Controller input includes:
"* Pre-generated map indicating 500 microR/hr and 20 microR/hr isopleths.
"* Field team control cell to continue providing field team controller with verification data.
"* One page of laboratory sample results. The limiting isotope will be Iodine 131. Back calculation for food control area PAR performed.
"* Pre-generated map indicating food control area PAR.
Note: Simulated Day Four through Day Seven activities.
1230 Food control PAR completed and faxed to offsite EOCs. EOF briefing delivered by state heath liaison.
1245 Crash call initiated by state health liaison. Detailed sampling plan discussion initiated.
Note: Simulated Day Seven and beyond.
Section 12 12-1 July 3,2002
COLUMBIA GENERATING STATION 2002 INGESTION EXERCISE Clock Time Description 1300 Revised Relocation Area activities begin 1345 Revised Relocation Area PAR completed and faxed to offsite EOCs. EOF briefing delivered by state heath liaison.
1400 Crash call initiated by state health liaison.
Note: Simulated Day Seven and beyond.
1415 Revised Food Control Area activities begin 1500 Revised Food Control Area PAR completed and faxed to offsite EOCs. EOF briefing delivered by state heath liaison.
1515 Crash call initiated by state health liaison.
1530 Terminate exercise and conduct exercise critique.
This section contains the following information:
"* Ground Shine/Gross Deposition tables for 9-17-2002, 9-18-2002, and 9-22-2002. All other data tables and simulated output is derived from these tables.
- Ingestion Footprint 9-18-2002 (map)
"* Sample Points 9-18-2002 (map)
"* Food Control Calculation 2002 (map)
Most of the data below will be developed from the tables indicated in the first bullet above. The below data is not included in this submittal.
"* EDPS2 plot for projected plume dispersion as of 2230 on September 17, 2002.
"* Field Team Survey Results for 9-18-2002
"* Airborne Monitoring System Data
"* Washington State Department of Health sample analysis results
"* Oregon State University Radiation Protection Laboratory Sample analysis results
"* Ingestion Flyover Pass A 9-19-2002 (map)
"* Ingestion Flyover Pass B 9-19-2002 (map)
"* Ingestion Flyover Pass C 9-19-2002 (map)
"* Ingestion Flyover Pass D 9-19-2002 (map)
"* Relocation Area PAR 9-18-2002 (map)
"* Food Control Area PAR (map)
"* Draft News Release for:
Washington State Emergency Management State of Oregon.
Benton County Emergency Management Franklin County Emergency Management Nuclear Regulatory Commission Federal Emergency Management Agency Energy Northwest Joint Information Center
"* Control Cell injects for simulated plant status, recovery and re-entry activities, etc., for media inquiries and rumor control. Includes reference to post-accident sampling results from Section 8.3.
NOTE: Many of the above documents, such as the draft news releases, may be revised following the completion of Day 1 activities to better represent the results of the Plume Phase of the exercise.
Section 12 12-2 July 3,2002
Ground ShinelGross Deposition 9/18/2002 A B C D E F G Ground Dose Rate 1.92E+03 1.06E+03 378 196 25 13 bkg at 1 meter (uR/hr)
Frisker at 1 meter (cpm) 103 57 20 11 1 bkg bkg Frisker at 1 cm (cpm) 3.84E+03 2.12E÷03 757 393 49 25 2 Smears (dpm/100 cm2) 4.46E+04 2.47E+04 8.79E+03 4.56E+03 573 295 21 Surface (uCi/m2) 2.01 E+02 1.11E+02 3.96E+01 2.05E+01 2.58E+00 1.33E+00 9.43E-02 IA B C D E F G Soil (uCi/m2) 1-131 6.47E+01 3.58E+01 1.28E+01 6.61E+00 8.31E-01 4.28E-01 3.04E-02 1-132 4.OOE+00 2.21E+00 7.88E-01 4.09E-01 5.14E-02 2.64E-02 1.88E-03 1-133 6.05E+01 3.35E+01 1.19E+01 6.19E+00 7.78E-01 4.OOE-01 2.84E-02 1-135 8.43E+00 4.67E+00 1.66E+00 8.62E-01 1.08E-01 5.57E-02 3.96E-03 Cs-134 5.45E+00 3.01E+00 1.07E+00 5.57E-01 7.OOE-02 3.60E-02 2.56E-03 Cs-137 1.70E+00 9.39E-01 3.35E-01 1.74E-01 2.18E-02 1.12E-02 7.97E-04 Te-132 3.88E+00 2.15E+00 7.65E-01 3.97E-01 4.99E-02 2.57E-02 1.82E-03 Ba-140 1.17E+01 6.46E+00 2.30E+00 1.19E+00 1.50E-01 7.71E-02 5.48E-03 La-140 5.87E+00 3.25E+00 1.16E+00 6.OOE-01 7.54E-02 3.88E-02 2.75E-03 Ru-103 3.80E-01 2.10E-01 7.49E-02 3.89E-02 4.88E-03 2.51 E-03 1.78E-04 Ru-106 3.43E+01 1.90E+01 6.77E+00 3.51 E+O0 4.41 E-O1 2.27E-O1 1.61 E-02 Contact Dose Rate (uR/hr) 247 137 49 25 3 2 bkg Greater than Relocation PAG No No No No No No No 10-1 Rev 7/3/2002
Sample Analysis Results 9/18/2002 A B C D E F G Vegetables (uCi/kg) 1-131 8.05E+01
- 4.45E+01
- 1.59E+01 - 8.23E+00
- 1.03E+00
- 5.32E-01
- 3.78E-02
- 1-132 9.95E-01 5.51E-01 1.96E-01 1.02E-01 1.28E-02 6.58E-03 4.67E-04 1-133 7.54E+01
- 4.17E+01 - 1.49E+01
- 7.71E+00
- 9.68E-01
- 4.98E-01 - 3.54E-02 1-135 1.05E+01 5.81E+00 2.07E+00 1.07E+00 1.35E-01 6.94E-02 4.93E-03 Cs-134 1.48E+00
- 8.20E-01
- 2.92E-01
- 1.52E-01
- 1.91E-02 9.80E-03 6.96E-04 Cs-137 4.62E-01
- 2.56E-01
- 9.11E-02
- 4.73E-02
- 5.94E-03 3.05E-03 2.17E-04 Te-132 1.06E+00
- 5.84E-01
- 2.08E-01
- 1.08E-01 1.36E-02 6.98E-03 4.96E-04 Ba-140 3.18E+00
- 1.76E+00
- 6.26E-01
- 3.25E-01
- 4.08E-02 2.1OE-02 1.49E-03 La-140 6.29E+00 3.48E+00 1.24E+00 6.43E-01 8.08E-02 4.16E-02 2.95E-03 Ru-103 1.03E-01
- 5.72E-02
- 2.04E-02
- 1.06E-02
- 1.33E-03
- 6.84E-04
- 4.86E-05 Ru-106 9.34E+00 5.17E+00
- 1.84E+00
- 9.56E-01
- 1.20E-01
- 6.18E-02
- 4.39E-03 Contact Dose Rate (uR/hr) 4.46E+03 2.47E+03 880 456 57 30 2 Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes A B C D E F G Leafy Vegetables (uCi/kg) 1-131 3.94E+01
- 2.18E+01
- 7.77E+00
- 4.03E+00 5.06E-01
- 2.61E-01
- 1.85E-02 1-132 4.87E-01 2.70E-01 9.61 E-02 4.98E-02 6.26E-03 3.22E-03 2.29E-04 1-133 3.69E+01
- 2.04E+01
- 7.27E+00
- 3.77E+00
- 4.74E-01
- 2.44E-01
- 1.73E-02 1-135 5.14E+00 2.84E+00 1.01E+00 5.26E-01 6.60E-02 3.40E-02 2.41E-03 Cs-134 7.26E-01 4.01E-01
- 1.43E-01
- 7.42E-02
- 9.33E-03 4.80E-03 3.41E-04 Cs-137 2.26E-01
- 1.25E-01
- 4.46E-02
- 2.31E-02
- 2.91E-03 1.50E-03 1.06E-04 Te-132 5.17E-01
- 2.86E-01
- 1.02E-01 5.29E-02 6.64E-03 3.42E-03 2.43E-04 Ba-140 1.56E+00
- 8.60E-01
- 3.07E-01
- 1.59E-01 2.OOE-02 1.03E-02 7.30E-04 La-140 3.08E+00 1.70E+00 6.07E-01 3.15E-01 3.96E-02 2.03E-02 1.44E-03 Ru-103 5.06E-02
- 2.80E-02
- 9.99E-03
- 5.18E-03
- 6.51E-04
- 3.35E-04
- 2.38E-05 Ru-106 4.57E+00 2.53E+00
- 9.02E-01
- 4.68E-01
- 5.88E-02
- 3.02E-02
- 2.15E-03 Contact Dose Rate (uR/hr) 2.18E+03 1.21 E+03 431 223 28 14 1 Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes
- Exceeds Derived Intervention Level (DIL) 10-2 Rev 7/3/2002
Sample Analysis Results 9118/2002 A B C D E F G Dairy Milk (uCi/kg) 1-131 0.OOE+00 3.1OE400
- 1.10E+00
- 5.73E-01
- 7.20E-02
- 3.70E-02 2.63E-03 1-132 2.82E-04 1.56E-04 5.56E-05 2.88E-05 3.62E-06 1.86E-06 1.32E-07 1-133 5.24E+00
- 2.90E+00
- 1.03E+00
- 5.36E-01
- 6.74E-02 3.46E-02 2.46E-03 1-135 7.30E-01 4.04E-01 1.44E-01 7.47E-02 9.38E-03 4.83E-03 3.43E-04 Cs-134 4.95E-01 2.74E-01
- 9.76E-02
- 5.06E-02
- 6.36E-03 3.27E-03 2.32E-04 Cs-137 1.54E-01
- 8.54E-02
- 3.04E-02
- 1.58E-02
- 1.98E-03 1.02E-03 7.25E-05 Te-132 3.53E-01 1.95E-01
- 6.96E-02 3.61E-02 4.53E-03 2.33E-03 1.66E-04 Ba-140 1.06E+00
- 5.87E-01
- 2.09E-01
- 1.08E-01 1.36E-02 7.01E-03 4.98E-04 La-140 7.41E-01 4.10E-01 1.46E-01 7.58E-02 9.52E-03 4.90E-03 3.48E-04 Ru-103 3.46E-02
- 1.91E-02
- 6.81E-03
- 3.53E-03
- 4.44E-04
- 2.28E-04
- 1.62E-05 Ru-106 3.12E+00 1.73E+00
- 6.15E-01
- 3.19E-01
- 4.01E-02
- 2.06E-02
- 1.46E-03 Contact Dose Rate (uR/hr) 375 254 90 47 6 3 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes No A B C D E F G Surface Water (uCiIkg) 1-131 2.82E-02
- 1.56E-02 5.55E-03
- 2.88E-03 3.62E-04 1.86E-04 1.32E-05 1-132 1.74E-03 9.63E-04 3.43E-04 1.78E-04 2.24E-05 1.15E-05 8.17E-07 1-133 2.64E-02 1.46E-02 5.20E-03 2.69E-03 3.39E-04 1.74E-04 1.24E-05 1-135 3.67E-03 2.03E-03 7.24E-04 3.75E-04 4.72E-05 2.43E-05 1.72E-06 Cs-134 2.59E-03 1.43E-03 5.11E-04 2.65E-04 3.33E-05 1.71 E-05 1.22E-06 Cs-137 8.08E-04 4.47E-04 1.59E-04 8.26E-05 1.04E-05 5.34E-06 3.79E-07 Te-132 1.85E-03 1.02E-03 3.64E-04 1.89E-04 2.37E-05 1.22E-05 8.67E-07 Ba-140 5.55E-03 3.07E-03 1.09E-03 5.68E-04 7.14E-05 3.67E-05 2.61 E-06 La-140 2.79E-03 1.54E-03 5.50E-04 2.85E-04 3.59E-05 1.85E-05 1.31 E-06 Ru-103 1.81E-04
- 1.00E-04 3.57E-05 1.85E-05 2.32E-06 1.20E-06 8.49E-08 Ru-106 1.63E-02
- 9.04E-03 3.22E-03 1.67E-03 2.1OE-04 1.08E-04 7.67E-06 Contact Dose Rate (uR/hr) 2 1 bkg bkg bkg bkg bkg Response Level Exceeded Yes Yes Yes No No No No
- Exceeds Derived Intervention Level (DIL) 10-3 Rev 7/3/2002
Ground ShinelGross Deposition 912012002 A B C D E F G Ground Dose Rate 1.21 E+03 668 238 123 16 8 bkq at 1 meter (uR/hr)
Frisker at 1 meter (cpm) 60 33 12 6 bkg bkg bkg Frisker at 1 cm (cpm) 2.41 E+03 1.34E+03 476 247 31 16 1 Smears (dpmrlO0 cm2) 2.95E+04 1.63E+04 5.81 E+03 3.01 E+03 379 195 1.38E+03 Surface (uCi/m2) 1.33E+02 7.34E+01 2.62E+01 1.36E+01 1.71E+00 8.78E-01 6.23E-02 A B C D E F G Soil (uCi/m2) 1-131 5.44E+01 3.01 E+01 1.07E+01 5.57E+00 7.OOE-01 3.60E-01 2.56E-02 1-132 2.61 E+00 1.45E+00 5.15E-01 2.67E-01 3.36E-02 1.73E-02 1.23E-03 1-133 1.22E+01 6.76E+00 2.41E+00 1.25E+00 1.57E-01 8.08E-02 5.74E-03 1-135 5.33E-02 2.95E-02 1.05E-02 5.46E-03 6.86E-04 3.53E-04 2.50E-05 Cs-134 5.44E+00 3.01 E+00 1.07E+00 5.56E-01 6.99E-02 3.59E-02 2.55E-03 Cs-137 1.70E+00 9.39E-01 3.35E-01 1.74E-01 2.18E-02 1.12E-02 7.97E-04 Te-132 2.54E+00 1.40E+00 5.OOE-01 2.59E-01 3.26E-02 1.68E-02 1.19E-03 Ba-140 1.05E+01 5.79E+00 2.06E+00 1.07E+00 1.35E-01 6.92E-02 4.92E-03 La-140 8.74E+00 4.84E+00 1.72E+00 8.94E-01 1.12E-01 5.78E-02 4.1OE-03 Ru-103 3.67E-01 2.03E-01 7.23E-02 3.75E-02 4.72E-03 2.43E-03 1.72E-04 Ru-106 3.42E+01 1.89E+01 6.74E+00 3.50E+00 4.39E-01 2.26E-01 1.61 E-02 Sr-89 1.84E+00 1.02E+00 3.62E-01 1.88E-01 2.36E-02 1.21 E-02 8.62E-04 Sr-90 3.01E+00 1.66E+00 5.93E-01 3.08E-01 3.87E-02 1.99E-02 1.41 E-03 Contact Dose Rate (uR/hr) 170 94 34 17 2 1 bkg 10-4 Rev 7/3/2002
Sample Analysis Results 9/20/2002 A B C D E F G Vegetables (uCilkg) 1-131 5.14E+01
- 2.84E+01
- 1.01E+01
- 5.25E+00
- 6.60E-01 3.39E-01 2.41E-02 1-132 1.08E-01 5.96E-02 2.13E-02 1.10E-02 1.39E-03 7.12E-04 5.06E-05 1-133 1.15E+01
- 6.38E+00
- 2.27E+00
- 1.18E+00
- 1.48E-01 7.63E-02 5.42E-03 1-135 5.03E-02 2.78E-02 9.92E-03 5.15E-03 6.47E-04 3.33E-04 2.36E-05 Cs-134 2.68E-01
- 1.48E-01
- 5.29E-02
- 2.74E-02
- 3.45E-03 1.77E-03 1.26E-04 Cs-137 8.37E-02
- 4.63E-02
- 1.65E-02
- 8.56E-03
- 1.08E-03 5.53E-04 3.93E-05 Te-132 1.25E-01
- 6.92E-02 2.47E-02 1.28E-02 1.61E-03 8.27E-04 5.87E-05 Ba-140 5.16E-O1
- 2.86E-01
- 1.02E-01 5.28E-02 6.63E-03 3.41 E-03 2.42E-04 La-140 2.18E+00 1.21 E+00 4.30E-01 2.23E-01 2.80E-02 1.44E-02 1.02E-03 Ru-103 1.81 E-02
- 1.OOE-02
- 3.57E-03
- 1.85E-03
- 2.32E-04
- 1.20E-04 8.49E-06 Ru-106 1.69E÷00
- 9.33E-01
- 3.32E-01
- 1.72E-01
- 2.17E-02
- 1.11E-02 7.92E-04 Sr-89 9.05E-02
- 5.01E-02
- 1.78E-02 9.26E-03 1.16E-03 5.98E-04 4.25E-05 Sr-90 1.48E-01
- 8.21E-02
- 2.92E-02
- 1.52E-02
- 1.91 E-03 9.80E-04 6.96E-05 Contact Dose Rate (uR/hr) 1.29E+03 711 253 131 17 8 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes A B C D E F G Leafy Vegetables (uCi/kg) 1-131 2.51E+01
- 1.39E+01
- 4.96E+00
- 2.57E+00
- 3.23E-01
- 1.66E-01 1.18E-02 1-132 5.28E-02 2.92E-02 1.04E-02 5.40E-03 6.78E-04 3.49E-04 2.48E-05 1-133 5.65E+00
- 3.12E+00
- 1.11E+00
- 5.78E-01
- 7.26E-02 3.73E-02 2.65E-03 1-135 2.46E-02 1.36E-02 4.86E-03 2.52E-03 3.17E-04 1.63E-04 1.16E-05 Cs-134 1.31 E-01
- 7.26E-02
- 2.59E-02
- 1.34E-02 1.69E-03 8.67E-04 6.16E-05 Cs-137 4.10E-02
- 2.27E-02 8.08E-03
- 4.19E-03 5.27E-04 2.71E-04 1.92E-05 Te-132 6.12E-02 3.39E-02 1.21 E-02 6.26E-03 7.87E-04 4.05E-04 2.87E-05 Ba-140 2.53E-01
- 1.40E-01 4.98E-02 2.58E-02 3.25E-03 1.67E-03 1.19E-04 La-140 1.07E+00 5.90E-01 2.10E-01 1.09E-01 1.37E-02 7.05E-03 5.01E-04 Ru-103 8.86E-03
- 4.90E-03
- 1.75E-03
- 9.06E-04
- 1.14E-04 5.85E-O5 4.16E-06 Ru-106 8.25E-01
- 4.57E-01
- 1.63E-01
- 8.44E-02
- 1.06E-02 5.46E-03 3.88E-04 Sr-89 4.43E-02
- 2.45E-02 8.74E-03 4.53E-03 5.69E-04 2.93E-04 2.08E-05 Sr-90 7.26E-02
- 4.02E-02
- 1.43E-02
- 7.43E-03
- 9.33E-04 4.80E-04 3.41E-05 Contact Dose Rate (uR/hr) 629 348 124 64 8 4 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes
- Exceeds Derived Intervention Level (DIL) 10-5 Rev 7/3/2002
Sample Analysis Results 9/20/2002 A B C D E F G Dairy Milk (uCi/kg) 1-131 7.OOE+00
- 3.87E+00
- 1.38E+00
- 7.16E-01
- 9.OOE-02
- 4.63E-02
- 3.29E-03 1-132 1.92E-10 1.06E-10 3.80E-11 1.97E-11 2.47E-12 1.27E-12 9.04E-14 1-133 1.57E+00
- 8.70E-01
- 3.10E-01
- 1.61E-01 2.02E-02 1.04E-02 7.39E-04 1-135 6.86E-03 3.80E-03 1.35E-03 7.02E-04 8.82E-05 4.54E-05 3.22E-06 Cs-134 8.28E-01
- 4.58E-01
- 1.63E-01
- 8.47E-02
- 1.06E-02 5.47E-03 3.89E-04 Cs-137 2.59E-01
- 1.43E-01
- 5.10E-02
- 2.64E-02
- 3.32E-03 1.71E-03 1.21E-04 Te-132 3.86E-01
- 2.14E-01
- 7.62E-02 3.95E-02 4.97E-03 2.55E-03 1.81E-04 Ba-140 1.59E+00
- 8.82E-01
- 3.14E-01
- 1.63E-01 2.05E-02 1.05E-02 7.49E-04 La-140 5.44E-01 3.01 E-01 1.07E-01 5.56E-02 6.99E-03 3.59E-03 2.55E-04 Ru-103 5.59E-02
- 3.09E-02
- 1.10E-02
- 5.72E-03
- 7.18E-04
- 3.69E-04
- 2.62E-05 Ru-106 5.21E+00
- 2.88E+00
- 1.03E+00
- 5.33E-01
- 6.69E-02
- 3.44E-02
- 2.45E-03 Sr-89 2.80E-01
- 1.55E-01
- 5.51 E-02
- 2.86E-02 3.59E-03 1.85E-03 1.31 E-04 Sr-90 4.58E-01
- 2.54E-01
- 9.04E-02 - 4.69E-02
- 5.89E-03
- 3.03E-03 2.15E-04 Contact Dose Rate (uR/hr) 439 243 87 45 6 3 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes No A B C D E F G Surface Water (uCi/kg) 1-131 8.98E-06 4.97E-06 1.77E-06 9.18E-07 1.15E-07 5.93E-08 4.22E-09 1-132 4.71E-07 2.61E-07 9.29E-08 4.82E-08 6.05E-09 3.11E-09 2.21E-10 1-133 2.02E-06 1.12E-06 3.98E-07 2.06E-07 2.59E-08 1.33E-08 9.47E-10 1-135 8.80E-09 4.87E-09 1.73E-09 9.OOE-10 1.13E-10 5.82E-11 4.13E-12 Cs-134 1.17E-06 6.48E-07 2.31 E-07 1.20E-07 1.51 E-08 7.74E-09 5.50E-10 Cs-137 3.66E-07 2.02E-07 7.21 E-08 3.74E-08 4.70E-09 2.42E-09 1.72E-10 Te-132 5.47E-07 3.02E-07 1.08E-07 5.59E-08 7.02E-09 3.61E-09 2.57E-10 Ba-140 2.26E-06 1.25E-06 4.45E-07 2.31E-07 2.90E-08 1.49E-08 1.06E-09 La-140 1.88E-06 1.04E-06 3.71E-07 1.93E-07 2.42E-08 1.24E-08 8.84E-10 Ru-103 7.91E-08 4.37E-08 1.56E-08 8.09E-09 1.02E-09 5.23E-10 3.71 E-1I Ru-106 7.37E-06 4.08E-06 1.45E-06 7.54E-07 9.47E-08 4.87E-08 3.46E-09 Sr-89 3.96E-07 2.19E-07 7.80E-08 4.05E-08 5.08E-09 2.61 E-09 1.86E-10 Sr-90 6.48E-07 3.59E-07 1.28E-07 6.63E-08 8.33E-09 4.29E-09 3.04E-10 Contact Dose Rate (uR/hr) bkg bkg bkg bkg bkg bkg bkg Response Level Exceeded No No No No No No No
- Exceeds Derived Intervention Level (DIL) 10-6 Rev 7/3/2002
Ground Shine/Gross Deposition 9/24/2002 A B C D E F G Ground Dose Rate 925 512 182 95 12 6 bkg at 1 meter (uR/hr)
Frisker at 1 meter (cpm) 44 25 9 5 bkg bkg bkg Frisker at 1 cm (cpm) 1.85E+03 1024 365 189 24 12 bkg Smears (dpm/lO0 cm2) 2.22E+04 1.23E+04 4.38E+03 2.27E+03 286 147 1.04E+03 Surface (uCi/m2) 1.OOE+02 5.54E+01 1.97E+01 1.02E+01 1.29E+00 6.62E-O1 4.70E-02 A B C D E F G Soil (uCi/m2) 1-131 3.86E+01 2.13E+01 7.60E+00 3.94E+00 4.95E-01 2.55E-01 1.81E-02 1-132 1.12E+00 6.17E-01 2.20E-01 1.14E-01 1.43E-02 7.38E-03 5.24E-04 1-133 4.99E-01 2.76E-01 9.84E-02 5.10E-02 6.41E-03 3.30E-03 2.34E-04 1-135 2.13E-06 1.18E-06 4.21E-07 2.18E-07 2.74E-08 1.41E-08 1.OOE-09 Cs-134 5.42E+00 3.OOE+00 1.07E+00 5.54E-01 6.96E-02 3.58E-02 2.54E-03 Cs-137 1.70E+00 9.39E-01 3.35E-01 1.74E-01 2.18E-02 1.12E-02 7.97E-04 Te-132 1.08E+00 5.99E-01 2.14E-01 1.11E-01 1.39E-02 7.16E-03 5.09E-04 Ba-140 8.42E+00 4.66E+00 1.66E+00 8.61E-01 1.08E-O1 5.57E-02 3.95E-03 La-140 9.06E÷00 5.01E+00 1.79E+00 9.27E-01 1.16E-01 5.99E-02 4.26E-03 Ru-103 3.42E-01 1.89E-01 6.74E-02 3.50E-02 4.39E-03 2.26E-03 1.61 E-04 Ru-106 3.39E+01 1.88E+01 6.69E+00 3.47E+00 4.36E-01 2.24E-01 1.59E-02 Sr-89 1.74E+00 9.61E-01 3.43E-01 1.78E-01 2.23E-02 1.15E-02 8.16E-04 Sr-90 3.01 E+00 1.66E+00 5.93E-01 3.08E-01 3.87E-02 1.99E-02 1.41 E-03 Contact Dose Rate (uR/hr) 133 74 26 14 2 bkg bkg 10-1 Rev 7/3/2002
Sample Analysis Results 9/24/2002 A B C D E F G Vegetables (uCi/kg) 1-131 2.09E+01
- 1.16E+01
- 4.12E+00 2.14E+00 2.68E-01
- 1.38E-01 9.81E-03 1-132 2.64E-02 1.46E-02 5.21 E-03 2.70E-03 3.40E-04 1.75E-04 1.24E-05 1-133 2.70E-01
- 1.50E-01 5.33E-02 2.76E-02 3.47E-03 1.79E-03 1.27E-04 1-135 1.16E-06 6.40E-07 2.28E-07 1.18E-07 1.49E-08 7.65E-09 5.43E-1o Cs-134 2.19E-O1
- 1.21E-O1 4.32E-02 2.24E-02 2.82E-03 1.45E-03 1.03E-04 Cs-137 6.86E-02
- 3.80E-02 1.35E-02
- 7.02E-03 8.82E-04 4.54E-04 3.22E-O5 Te-132 4.38E-02 2.42E-02 8.64E-03 4.48E-03 5.63E-04 2.90E-04 2.06E-05 Ba-140 3.41E-01
- 1.88E-01
- 6.72E-02 3.48E-02 4.38E-03 2.25E-03 1.60E-04 La-140 2.41E+00 1.33E+00 4.75E-01 2.47E-O1 3.10E-02 1.59E-02 1.13E-03 Ru-103 1.38E-02
- 7.65E-03
- 2.73E-03
- 1.41E-03
- 1.78E-04
- 9.14E-05 6.49E-06 Ru-106 1.37E+00
- 7.60E-01
- 2.71E-01 1.40E-01
- 1.76E-02
- 9.08E-03 6.45E-04 Sr-89 7.03E-02
- 3.89E-02
- 1.39E-02 7.19E-03 9.03E-04 4.65E-04 3.30E-05 Sr-90 1.22E-01
- 6.73E-02
- 2.40E-02 1.24E-02
- 1.56E-03 8.04E-04 5.71E-05 Contact Dose Rate (uR/hr) 568 314 112 58 7 4 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes A B C D E F G Leafy Vegetables (uCi/kg) 1-131 1.02E+01
- 5.66E+00
- 2.02E+00 1.05E+00 1.31E-01
- 6.76E-02
- 4.80E-03 1-132 1.29E-02 7.16E-03 2.55E-03 1.32E-03 1.66E-04 8.56E-05 6.08E-06 1-133 1.32E-01 7.32E-02 2.61 E-02 1.35E-02 1.70E-03 8.75E-04 6.21 E-05 1-135 5.66E-07 3.13E-07 1.12E-07 5.79E-08 7.28E-09 3.74E-09 2.66E-10 Cs-134 1.07E-01
- 5.93E-02 2.11E-02 1.10E-02 1.38E-03 7.09E-04 5.04E-05 Cs-137 3.36E-02 1.86E-02 6.63E-03 3.44E-03 4.32E-04 2.22E-04 1.58E-05 Te-132 2.15E-02 1.19E-02 4.23E-03 2.19E-03 2.76E-04 1.42E-04 1.01E-05 Ba-140 1.67E-01 9.23E-02 3.29E-02 1.71E-02 2.14E-03 1.1OE-03 7.83E-05 La-140 1.18E+00 6.53E-01 2.33E-01 1.21E-01 1.52E-02 7.80E-03 5.54E-04 Ru-103 6.77E-03
- 3.74E-03 1.33E-03
- 6.92E-04
- 8.70E-05 4.47E-05 3.18E-06 Ru-106 6.72E-01
- 3.72E-01
- 1.33E-01
- 6.87E-02
- 8.64E-03 4.44E-03 3.16E-04 Sr-89 3.44E-02 1.90E-02 6.78E-03 3.52E-03 4.42E-04 2.27E-04 1.62E-05 Sr-90 5.96E-02
- 3.29E-02
- 1.17E-02 6.09E-03
- 7.65E-04 3.94E-04 2.80E-05 Contact Dose Rate (uElhr) 278 154 55 28 4 2 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes Yes
- Exceeds Derived Intervention Level (DIL) 10-2 Rev 7/3/2002
Sample Analysis Results 9/24/2002 A B C D E F G Dairy Milk (uCilkg) 1-131 3.70E+00
- 2.05E+00
- 7.29E-01
- 3.78E-01
- 4.75E-02
- 2.44E-02
- 1.74E-03 1-132 3.03E-23 1.68E-23 5.98E-24 0.00 3.90E-25 2.01 E-25 1.42E-26 1-133 4.79E-02 2.65E-02 9.44E-03 4.89E-03 6.15E-04 3.16E-04 2.25E-05 1-135 2.05E-07 1.13E-07 4.04E-08 2.09E-08 2.63E-09 1.35E-09 9.61 E-11 Cs-134 8.26E-01
- 4.57E-01
- 1.63E-01
- 8.45E-02
- 1.06E-02 5.46E-03 3.88E-04 Cs-137 2.59E-01
- 1.43E-01
- 5.10E-02
- 2.65E-02
- 3.33E-03 1.71E-03 1.21E-04 Te-132 1.65E-01
- 9.14E-02 3.26E-02 1.69E-02 2.12E-03 1.09E-03 7.76E-05 Ba-140 1.28E+00
- 7.10E-01
- 2.53E-01
- 1.31 E-01 1.65E-02 8.49E-03 6.03E-04 La-140 1.04E-01 5.77E-02 2.06E-02 1.07E-02 1.34E-03 6.89E-04 4.89E-05 Ru-103 5.21E-02
- 2.88E-02
- 1.03E-02
- 5.33E-03
- 6.70E-04
- 3.45E-04 2.45E-05 Ru-106 5.18E+00
- 2.86E+00
- 1.02E+00
- 5.29E-01
- 6.65E-02
- 3.42E-02
- 2.43E-03 Sr-89 2.65E-N1
- 1.47E-01
- 5.22E-02
- 2.71 E-02 3.40E-03 1.75E-03 1.24E-04 Sr-90 4.59E-01
- 2.54E-01
- 9.04E-02
- 4.69E-02
- 5.89E-03
- 3.03E-03 2.15E-O4 Contact Dose Rate (uR/hr) 292 161 57 30 4 2 bkg Response Level Exceeded Yes Yes Yes Yes Yes Yes No A B C D E F G Surface Water (uCVkg) 1-131 3.65E-06 2.02E-06 7.20E-07 3.74E-07 4.69E-08 2.41 E-08 1.71 E-09 1-132 1.16E-07 6.39E-08 2.28E-08 1.18E-08 1.49E-09 7.64E-10 5.43E-11 1-133 4.73E-08 2.61E-08 9.32E-09 4.83E-09 6.07E-10 3.12E-10 2.22E-11 1-135 2.02E-13 1.12E-13 3.99E-14 2.07E-14 2.60E-15 1.34E-15 9.49E-17 Cs-134 9.58E-07 5.30E-07 1.89E-07 9.79E-08 1.23E-08 6.33E-09 4.50E-10 Cs-137 3.OOE-07 1.66E-07 5.92E-08 3.07E-08 3.86E-09 1.98E-09 1.41E-10 Te-132 1.92E-07 1.06E-07 3.78E-08 1.96E-08 2.46E-09 1.27E-09 8.99E-11 Ba-140 1.49E-06 8.24E-07 2.94E-07 1.52E-07 1.91 E-08 9.84E-09 6.99E-10 La-140 1.60E-06 8.86E-07 3.16E-07 1.64E-07 2.06E-08 1.06E-08 7.52E-10 Ru-103 6.04E-08 3.34E-08 1.19E-08 6.18E-09 7.77E-10 4.OOE-10 2.84E-11 Ru-106 6.OOE-06 3.32E-06 1.18E-06 6.14E-07 7.71E-08 3.97E-08 2.82E-09 Sr-89 3.07E-07 1.70E-07 6.06E-08 3.14E-08 3.95E-09 2.03E-09 1.44E-10 Sr-90 5.32E-07 2.94E-07 1.05E-07 5.44E-08 6.83E-09 3.51 E-09 2.50E-10 Contact Dose Rate (uR/hr) bkg bkg bkg bkg bkg bkg bkg Response Level Exceeded No No No No No No No
- Exceeds Derived Intervention Level (DIL) 10-3 Rev 7/3/2002
7,_________
Plme Footprint, 9-18-2002 2GM Ac g l~r and Ve P, c2 /
-"aa Gra~d l CW Spar Dat. Reýions adiP
- Red Pe 0rrd ia B'0 nSRIlrisy g
~y ]. <~(!, Hnnde 0 l~8ks~rmeSteetAtasUSA c0
Crop Sample Location, 9-18-2002 a'
Outook . ..d° Fa~l Crop Co
'?to~to a,3/4 Sa lco 0 St n[flal
© 1998 DeLoe. S t Atlas USA
C03