August 5, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - PARTIAL WITHDRAWAL OF AMENDMENT REQUEST (TAC NO. MB2053)
Dear Mr. Skolds:
By letter dated May 21, 2001, AmerGen Energy Company, LLC, applied for an amendment to the Clinton Power Station, Facility Operating License No. NPF-62. The proposed change was to modify the facility technical specifications pertaining to the actions required if the refueling equipment interlocks become inoperable and to the frequency of the refueling equipment interlock inputs channel functional test.
The NRC staff issued an amendment dated April 4, 2002, approving the alternate actions if the refueling equipment interlocks become inoperable. The request to revise the frequency of the refueling equipment interlock inputs channel functional test was not addressed in that license amendment. Subsequently, by letter dated July 16, 2002, you withdrew the portion of the amendment request related to the channel functional test frequency.
The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
Notice of Partial Withdrawal cc w/encl: See next page
Clinton Power Station, Unit 1 cc:
Chief Operating Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Vice President - Mid-West Opns Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Senior Vice President - Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Manager Licensing - Clinton and LaSalle Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director-Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Document Control Desk-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Clinton Power Station Plant Manager AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Regulatory Assurance Manager - Clinton AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351
Clinton Power Station, Unit 1 cc:
Resident Inspector U.S. Nuclear Regulatory Commission RR#3, Box 229A Clinton, IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County c/o County Clerks Office DeWitt County Courthouse Clinton, IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603
August 5, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, Illinois 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - PARTIAL WITHDRAWAL OF AMENDMENT REQUEST (TAC NO. MB2053)
Dear Mr. Skolds:
By letter dated May 21, 2001, AmerGen Energy Company, LLC, applied for an amendment to the Clinton Power Station, Facility Operating License No. NPF-62. The proposed change was to modify the facility technical specifications pertaining to the actions required if the refueling equipment interlocks become inoperable and to the frequency of the refueling equipment interlock inputs channel functional test.
The NRC staff issued an amendment dated April 4, 2002, approving the alternate actions if the refueling equipment interlocks become inoperable. The request to revise the frequency of the refueling equipment interlock inputs channel functional test was not addressed in that license amendment. Subsequently, by letter dated July 16, 2002, you withdrew the portion of the amendment request related to the channel functional test frequency.
The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461 DISTRIBUTION:
PUBLIC
Enclosure:
Notice of Partial Withdrawal PD3-2 r/f A. Mendiola cc w/encl: See next page T. Harris J. Hopkins OGC ACRS ADAMS Accession Number: ML022070123 OFFICE PM:LPD3-2 LA:LPD3-2 SC:LPD3-2 NAME JHopkins CRosenberg for THarris GDick for AMendiola DATE 7/29/02 7/29/02 7/29/02 OFFICIAL RECORD COPY
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-461 NOTICE OF PARTIAL WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of AmerGen Energy Company, LLC (the licensee), to withdraw part of its May 21, 2001, application for proposed amendment to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No. 1, located in DeWitt County, Illinois.
The amendment application proposed revising the Technical Specifications to allow alternate actions if the refueling equipment interlocks become inoperable and to increase the frequency of the refueling equipment interlock inputs channel functional test from 7 to 31 days.
In partial response to the licensees request, the NRC staff issued an amendment dated April 4, 2002, approving the alternate actions if the refueling equipment interlocks become inoperable. The request to revise the frequency of the refueling equipment interlock inputs channel functional test was not addressed in that license amendment.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on December 26, 2001 (66 FR 66463).
However, by letter dated July 16, 2002, the licensee withdrew the portion of the proposed change pertaining to the channel functional test frequency.
For further details with respect to this action, see the application for amendment dated May 21, 2001, the license amendment dated April 4, 2002, and the licensee's letter dated July 16, 2002, which withdrew part of the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 5th day of August 2002.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Jon B. Hopkins, Senior Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation