Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/16/2002
From:
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML022060574 (54)


Text

Davis-Besse Nuclear Power Station Return to Service Plan Update July 16, 2002 FENOC I

Introduction Lew Myers FENOC Chief Operating Officer FENOC 2

Desired Outcomes

"* Demonstrate Return to Service Plan Implementation toward safe, reliible and sustainable operation

"* Provide status of several Building Blocks

"* Demonstrate closure of actions from the previous meeting

"* Introduce status of Management and Human Performance Excellence Plan FENOC

Basic Building Blocks Rjeturn to Service Plan]

Reactor Head Resolution Plan Bob Schrauder Containment Health Assurance Plan LRandy Fast M

Restart Overview Panel Restart Action Plan Howard Bergendahl Ir System Health Assurance Plan Jim Powers Restart and Post-Restart Test Plan Randy Fast Management and Human Performance Excellence Plan Lew Myers ll

/

Restart Overview Panel Reaulatory/NRC (Retired)

Joe Callan d Community Jere Witt (Ottawa County)

Company Nuclear Review Board Jack Martin L

History of DB j Lou Storz FENOC RESTART OVERVIEW PANEL I

FENOC Bob Saunders Lew Myers Gary leidich Bill Pearce Extended Outage Experience Chris Bakken Institute of Nuclear Power Operators (Industry Communication)

Elmer (Buzz) Galbraith 5

II I

I 1

DAVIS-BESSE SITE ORGANIZATION VICE PRESIDENT FENOC OVERSIGHT L. William Pearce I

FENOC CHIEF OPERATING OFFICER Low W. Myers L Executive Assist I Nora L.Flood EXECUTIVE VICE PRESIDENT - FENOC SGary R. Leidich GaryR.

LidlI MANAGER -OPERATIONS EFFECTIVENESS Michael J. Ross I-Hi VICE PRESIDENT NUCLEAR Howard W. Bergendahl A.t.,4..4 I

Susan-K Il i

t id K. Griffit B.... J..=

I I

V-----

I u**SS...*.

II PLANT MANAGER J. Randel Fast

-vI I

MANAGER - CHEMISTRY AND RADIATION PROTECTION Robert W. Pell MANAGER - PLANT OPERATIONS Michael J. Roder MANAGER - NUCLEAR TRAINING William A. Mugge 1 FEN I

FENOC I

DIRECTOR MAINTENANCE Michael J. Stevens Executive Assistant Rebecca S. Harsanje tI I

tf 7

lI

  • ~II MANAGER MAINTENANCE Michael J. Roder MANAGER -WORK CONTROL C. David Nelson MANAGER OUTAGE MANAGEMENT C. David Nelson (acting)

I DIRECTOR SUPPORT SERVICES Robert W. Schrauder Executive Assistant Jacqueline Gezo tt

-I MANAGER REGULATORY AFFAIRS' Patrick J. McCloskey PatrIck J. McCloskey 1 MANAGER - SECURITY Gary A. Skeel Gar A.Skel:

MANAGER HUMAN RESOURCES Deanna L. Haskins DenaL akn I

DIRECTOR-NUCLEA-ENGINEERING

_James J. Powers, III Executive Assistant Yvonne M. Leidorf Yvonne M. Leldorf I

MANAGER PLANT ENGINEERING Joseph W. Rogers Joseph W. Rogers 1 MANAGER -

John J. Grabnar I

SUPERVISOR - NUCLEAR ENGINEERING (SUPERVISOR - DESIGN JOINT ENGINEERING TEAM Glenn R. McIntyre 6

[

I

-I tI

-I MANAGER LEARNING ORGANIZATION Todd T. Pleune (acting)

MANAGER QUALITY SERVICES Linda M. Dohrmann n

I l

John J. Grabnar I

I I

I B

I LII r"

  • UVlSOr B,,

m H

u

]

I I

I IvaEx etufl-

-1&

_ýlll.,.

I Executive Assistant Leolla Mitchell H

m B

Reactor Head Resolution Plan Implementation Status'-__- __

Bob Schrauder Reactor Head Resolution Oversight FENOC 0

7

Reactor Head Resolution Plan Implementation Status_

Progress Replacement Head activities support safe and reliable plant return to service during Fourth Quarter 2002.

FENOC

Reactor Head Resolution Plan S.........ImplementationStatus Midland Activities

  • Containment access opening complete
  • Service Structure Inspection Access Modification complete
  • Final cleaning and preparation for shipping underway FENOC

Cutting Containment Liner I

.4%

FENOC

-oý 1

. I

Containment Access Opening FENOC 11

Reactor Head Resolution Plan Implementation Status A

Midland Activities

"* Containment access opening complete

"* Service Structure Inspection AcCES3S Modification complete

"* Non-Destructive Examinations satisfactorily completed

"* Final cleaning and preparation for shipping underway FENOC 12

FENOC 13

I I

FENOC 15

FENOC 17

00

L_

Reactor Head Resolution Plan

__Implementation Status' Davis-Besse Activities

"* RPV Head being prepared for removal

"* Construction procedures submitted to FENOC for review and approval

  • Engineering Packages nearing completion

"* Containment Building opening preparation underway

"* Containment restoration to include Containment Integrated Leak Rate Test to confirm Containment integrity FENOC 19

FENOC 20

Reactor Head Resolution Plan Implementation Status, Davis-Besse Activities

"* RPV Head being prepared for removal

"* Construction procedures submitted to FENOC for review and approval

"* Engineering Packages nearing completion

"* Containment Building opening preparation underway

"* Containment restoration to include Containment Integrated Leak Rate Test to confirm Containment integrity FENOC 21

A Containment Health Plan Implementation Status' Randy Fast Plant Manager Jim Powers Director - Engineering FENOC 23

Containment Health Plan Implementation Status

" Plan scope increased to encompass overall Containment Health

- Containment Vessel Evaluation

- Environmental Qualification Equipment Evaluation

- Containment Emergency Sump Evaluation

- Decay Heat Valve Pit

- Containment Air Coolers

" System Health Plan revised to include systems outside Containment that contain boric acid FENOC 24

Containment Health Pla.i Implementation Status

"* Revised Field Inspector Training-Program

"° Procedures in place for inspections

° Validation of inspections in progress

  • Independent inspections with qualified personnel FENOC 2

LM 0

LC

Qualifying Painters FENOC 27

System Health Assurance Plan Implementation Status Howard BergendahJ Vice President - Nuclear FENOC

- System Health Assurance ['Ian Implementation Status Operational Readiness Reviews

  • Complete System Readiness Reviews
  • Risk Significant Maintenance Rule Systems
  • Focus on material condition
  • Include system walkdowns FENOC 30

System Health Assurance Plan Implementation Status" Latent Issues Reviews Detailed look at system design and inciude detailed system walkdowns

- Reactor Coolant System

- Auxiliary Feedwater System

- Component Cooling Water System

- Emergency Diesel Generators

- Service Water System FENOC 31

Lm 0

E

0)

CL of Lac

Scaffold I FENOC 33

Program Compliance Pk F

Implementation Status

,Phase I - Program Readiness

  • Baseline assessment of plant prc jT"r;Ams!
  • Results presented to the Program Review Board Phase 2 - Detailed Program Reviews;
  • Expectations have been establishd f;-%

In-Depth systematic review of programs related to degradation of head FENOC 3

Program Compliance Plan Implementation Status, Phase 2 - Reviews Include:

"* Pilot Review: Probabilistic Safety Assessment Program

Boric Acid Corrosion Control Program

"° Inservice Inspection Program

"* Plant Modification Program

"* Corrective Action Program

"* Reactor Coolant System Unidentified Leakage Program

"* Operating Experience FENOC 35

Management and Human Performance Excellence Plan Introduction Lew Myers Chief Operating Officer FENOC 36

Management Root Cause Introduction

==

Conclusion:==

  • Management ineffectively implemented processes, and thus failed to detect and address plant problems as opportunities arose Four Key Focus Areas Identified:

"* Ownership

"* Oversight

- Standards

Management Root Caus3.

Introduction Initial Assessments:

"* Standards have existed for many ye;.:s thcA lacked rigor in problem solving

"* Strong management I leadership tends to improve performance, teamwork and ownership

"* Lack of management oversight has rtsuited in lax rigor in process implementation Questioning attitude is not evident in decision making FENOC 38

Management Root Cause Approach:

"* Baseline from Technical Root Cause

"° Outside Experts Utilized

"* Dedicated Investigation Team FENOC 39

Management Root Cause Steve Loehlein Root Cause Team Leader FENOC 40

Management Root Cause

Purpose:

Understand why, over a period of years, Davis-Besse personnel failed to identify corrosion of the Reactar Pressure Vessel Head base metal.

FENOC 41

Management Root Cause Team Composition:

- Technical Root Cause Leader

- Root Cause qualified FENOC employees

- FENOC Oversight Support

- Process Expertise -- Conger & Elsea

- Davis-Besse Management Personnel Overview:

- INPO Organizational Effectiveness Expert FENOC 42

Root Cause Team i.am r

W-. -~

-- e FENOC f

W-A-w I

Management Root Cause Approach and Status:

Scope Development

- Technical Root Cause results

- Four Focused areas for review:

"* RPV Head Pressurizer Spray Valve (RC-2)

"° Containment Air Coolers

  • Radiation Monitor Filters FENOC 44

Management Root Cause In-De th Evaluations:

  • Event and Causal Factors chart and Ba. rier Analysis techniques are being employed

MORT Analysis Sections

- Technical Information Systems

- Corrective Action Program

- Hazard Analysis Process

- Task Performance Errors

- Management Support I Oversight

"* Corrective Actions will be recommended based on conclusions of data analysis FENOC 45

MORT Analysis

Management Root Cause Preliminary Insights:

"* Standards have existed for many years that lacked rigor in problem solving

"* Strong management / leadership tends to improve performance, teamwork and ownership

  • Lack of management oversight has resulted in lax rigor in process implementation
  • Questioning attitude is not evident in decision making FENOC 47

Closing Remarks Lew Myers FENOC Chief Operating Officer 48 FENOC

Closing Remarks

  • Demonstrated movement of our Build hug Blocks from Planning,. Discovery, and into Implementation

"° We have taken strong actions to incorporate comments from our Restart Oversight Panel and the NRC

"* We are taking management actions that are substantial and demonstrative FENOC 49

Closing Remarks Management Action:

  • New positions of Chief Operating Officer, Executive Vice President of Engineering, and Vice President of Nuclear Oversight to ensure good operation and performance standards
  • New Senior Management Team and a str,. ýng management team is now present with proven leadership FENOC 50

Closing Remarks Management Action:

  • We are providing a case study with all of our employees to set an expectation that a change in ownership and standards are required
  • We are re-baselining our standards and t:iearIl reinforcing these standards in each department

- New Engineering Standards of Excellence

- New Engineering Assessment Board

- Plant Manager now chairing our Corrective Action Review Board

- New Operations leadership to ensure a plant operational focus FENOC 51

Closing Remarks Management Action:

1 Building Teamwork between managers and supervisors/line workers FENOC 52 "00"

IF Conclusions We continue to be committed to a comprehensive approach. to ensure Davis-Besse is ready for safe and reliable operation and sustainable performance.

FENOC 53 11.