ML020600058

From kanterella
Jump to navigation Jump to search

Request for Additional Information, Proposed Alternatives to the Requirements of Section XI of the American Society of Mechanical Engineers Code.
ML020600058
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/01/2002
From: Stang J
NRC/NRR/DLPM/LPD3
To: Bakken A
Indiana Michigan Power Co
Stang, JF, NRR/DLPM/LPD III-1, 415-1345
References
TAC MB3551, TAC MB3552
Download: ML020600058 (4)


Text

March 1, 2002 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

SUBJECT:

DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION, PROPOSED ALTERNATIVES TO THE REQUIREMENTS OF SECTION XI OF THE AMERICAN SOCIETY OF MECHNICAL ENGINEERS CODE (TAC NOS. MB3551 AND MB3552)

Dear Mr. Bakken:

By letter dated December 6, 2001, Indiana Michigan Power Company, pursuant to 10 CFR 50.55a(a)(3)(i) and 10 CFR 50.55a(a)(3)(ii) submitted two alternatives to the requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code).

The Nuclear Regulatory Commission (NRC) staff has reviewed your request and concluded that it does not provide technical information in sufficient detail to enable the staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety.

Draft questions were discussed with Mr. J. Waters, et al., of your staff on February 20, 2002.

A mutually agreeable target date of April 12, 2002, for your response was established. The NRC staff will continue review of your proposed alternatives when your response to the enclosed questions is received.

If circumstances result in the need to revise the target date, please contact me at (301) 415-1345 at the earliest opportunity.

Sincerely,

/RA/

John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316

Enclosure:

Request for Additional Information cc w/encl: See next page

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III Drinking Water and Radiological U.S. Nuclear Regulatory Commission Protection Division 801 Warrenville Road Michigan Department of Lisle, IL 60532-4351 Environmental Quality 3423 N. Martin Luther King Jr Blvd Attorney General P.O. Box 30630, CPH Mailroom Department of Attorney General Lansing, MI 48909-8130 525 West Ottawa Street Lansing, MI 48913 Scot A. Greenlee Director, Nuclear Technical Services Township Supervisor Indiana Michigan Power Company Lake Township Hall Nuclear Generation Group P.O. Box 818 500 Circle Drive Bridgman, MI 49106 Buchanan, MI 49107 U.S. Nuclear Regulatory Commission David A. Lochbaum Resident Inspector's Office Union of Concerned Scientists 7700 Red Arrow Highway 1616 P Street NW, Suite 310 Stevensville, MI 49127 Washington, DC 20036-1495 David W. Jenkins, Esquire Site Vice President Indiana Michigan Power Company Indiana Michigan Power Company Nuclear Generation Group Nuclear Generation Group One Cook Place One Cook Place Bridgman, MI 49106 Bridgman, MI 49106 Mayor, City of Bridgman Michael W. Rencheck, Vice President P.O. Box 366 Strategic Business Improvements Bridgman, MI 49106 Indiana Michigan Power Company Nuclear Generation Group Special Assistant to the Governor 500 Circle Drive Room 1 - State Capitol Buchanan, MI 49107 Lansing, MI 48909 Joseph E. Pollock Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

ML020600058 OFFICE PDIII-1/PM PDIII-1/LA SC-EMCB PDIII-1/SC NAME JStang THarris TChan WReckley DATE 03/01/02 03/01/02 03/01/02 03/01/02 REQUEST FOR ADDITIONAL INFORMATION DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 SUBMITTAL C1201-02 PROPOSED ALTERNATIVES TO THE REQUIREMENTS OF SECTION XI OF THE AMERICAN SOCIETY OF MECHNICAL ENGINEERS CODE DATED DECEMBER 6, 2001 to C1201-02:

1) Para 4.0(b) - Define when it would be impractical to use ultrasonic methods.
2) Para 4.0(d) - Since the basis for the relief is designed around performing austenitic repairs, why was NB-5340, Magnetic Particle Acceptance Standards, referenced?
3) Para 4.0 (d) Explain why ultrasonic inspection acceptance standard Table IWB-3514-2 was used versus NB-5330 ultrasonic acceptance standards. to C1201-2:
1) Under proposed alternative, item 4, page 3, please explain how an unacceptable OD circumferential flaw above the attachment weld will be repaired.