ML022000197
| ML022000197 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Oyster Creek, Limerick, Crane |
| Issue date: | 07/10/2002 |
| From: | Gallagher M Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2130-02-20186, 5928-02-20140, RIS-02-009 | |
| Download: ML022000197 (6) | |
Text
S~Exelen Exelon Nuclear www.exeloncorp.com Nuclear 2oo Exelon Way Kennett Square, PA 19348 RIS 2002-09 July 10, 2002 2130-02-20186 5928-02-20140 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-277 and 50-278 Three Mile Island Station, Unit 1 Facility Operating License No. DPR-50 Docket No. 50-289
Subject:
Response to NRC Regulatory Issue Summary 2002-09 "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary (RIS) 2002-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 6, 2002 In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.
Attachments 1 through 4 provide the responses to RIS 2002-09 for Limerick Generating Station (LGS), Oyster Creek Generating Station (Oyster Creek), Peach Bottom Atomic Power Station (PBAPS), and Three Mile Island Station, Unit 1 (TMI Unit 1), respectively. The operator licensing examination information for each facility is provided on a separate NRC Form 536.
During Calendar Year CY 2005, a total of 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in Attachment 1. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at LGS; the remainder of the operating exam will be completed at PBAPS. Since the o 03
Response to RIS 2002-09 Docket Nos. 50-219,289,277,278,352,353 July 10, 2002 Page 2 LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on for LGS only and Attachment 2 for PBAPS references Attachment 1.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, Michael P. Gallagher Director - Licensing Mid-Atlantic Regional Operating Group Attachments - Completed NRC Form 536 for LGS - Completed NRC Form 536 for Oyster Creek - Completed NRC Form 536 for PBAPS - Completed NRC Form 536 for TMI Unit 1 cc:
H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident Inspector, LGS R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS J. D. Orr, USNRC Senior Resident Inspector, TMI Unit 1 C. Gratton, USNRC Senior Project Manager, LGS P. S. Tam, USNRC Senior Project Manager, Oyster Creek J. P. Boska, USNRC Senior Project Manager, PBAPS T. G. Colburn, USNRC Senior Project Manager, TMI Unit 1 w/ attachments
Response to RIS 2002-09 Page 1 of 1
{PRIVATE}NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 0713112002 (8-2000)
Estimated burden per response to comply with this voluntary information collection request: I hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6) U S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to EXAMINATION DATA bjsl @nrc.gov, and to the Desk Officer, Office of Information and Regulatory
- Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 1
Facility Operating License Nos. NPF-39 and NPF-85 Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 2
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR 0
6 6
4 OPERATORS NUMBER OF SENIOR REACTOR 0
10 8
4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0
2 4
4 6
NUMBER OF SENIOR REACTOR 0
0 0
OPERATORS-LIMITED 06/06/05 PROPOSED DATES PRIMARY DATE NA 05/03/04 08/01/05 11/06/06 ALTERNATE DATE NA 05/17/04 08/15/05 11/13/06 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2003 CY 2004 I
Response to RIS 2002-09 Page 1 of 1
{PRIVATE)NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 07/3112002 (8-2000)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6) U S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to EXAMINATION DATA
%bsl
@nrc.gov, and to the Desk Officer, Office of Information and Regulatory
- Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oyster Creek Generating Station I
Facility Operating License No. DPR-16 Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR 6
0 4
0 OPERATORS NUMBER OF SENIOR REACTOR 10 0
0 0
OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2
0 4
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 12/2003 N/A 12/2005 N/A ALTERNATE DATE 11/2003 N/A 11/2005 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2003 CY 2004 I
,Response to RIS 2002-09 Page 1 of 1 (PRIVATE }NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 07/31/2002 (8-2000)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 ES) U S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to EXAMINATION DATA bjsl@nrc.gov, and to the Desk Officer, Office of Information and Regulatory
- Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 1
Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR OPERATORS 0
8 4
4 NUMBER OF SENIOR REACTOR 0
10 4
4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0
2 2
2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 4/5/04 7/18/05 11/13/06 ALTERNATE DATE N/A 4/12/04 7/25/05 11/20/06 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2003 CY 2004 See Attachment 1
,Response to RIS 2002-09 Page 1 of 1 (PRIVATE )NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 07/3112002 (8-2000)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6) U S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by intemet email to EXAMINATION DATA bjsl@nrc.gov, and to the Desk Officer, Office of Information and Regulatory
- Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Three Mile Island Station, Unit 1 1
Facility Operating License No. DPR-50 Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
2 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS I
I I
B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2003 CY 2004 CY 2005 CY 2006 NUMBER OF REACTOR OPERATORS 0
2 2
2 NUMBER OF SENIOR REACTOR 9
17 5
5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 02/17/03 04/04 & 11/04 10/05 11/06 ALTERNATE DATE N/A 12/04 11/05 12/06 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER L
CY 2003 CY 2004