ML021980209
| ML021980209 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire |
| Issue date: | 07/08/2002 |
| From: | Tuckman M Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-02-009 | |
| Download: ML021980209 (6) | |
Text
"Duke Duke Power t'
Power~w 526 South Church St. EC07H LW N twWeN Charlotte, NC 28202 A Duke Energy Company P.O. Box 1006 EC07H Charlotte, NC 28201-1006 M. S. Tuckman (704) 382-2200 OFFICE Executive Vice President (704) 382-4360 FAX Nuclear Generation July 8, 2002 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2002-09 Preparation and Scheduling of Operator Licensing Examinations On June 6, 2002, the NRC issued Regulatory Issue Summary (RIS) 2002-09, "Preparation and Scheduling of Operator Licensing Examinations". The subject RIS requested facility licensees to update the NRC on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations for calendar years 2003 through 2006 and the NRC's generic fundamentals examinations (GFEs) for calendar years 2003 and 2004.
Attachments 1, II, and III contains the responses to this RIS for Oconee Nuclear Station, McGuire Nuclear Station, and Catawba Nuclear Station, respectively.
Please direct any questions to L. B. Jones at (704) 382-4753.
M. S. Tuckman Attachments
U. S. Nuclear Regulatory Commission July 8, 2002 Page 2 xc:
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan (addressee only)
NRC Senior Project Manager (ONS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 R. E. Martin (addressee only)
NRC Senior Project Manager (MNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 C. P. Patel (addressee only)
NRC Senior Project Manager (CNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station S. M. Shaeffer NRC Senior Resident Inspector McGuire Nuclear Station D. J. Roberts NRC Senior Resident Inspector Catawba Nuclear Station
U. S. Nuclear Regulatory Commission July 8, 2002 Page 3 bxc:
L. E. Nicholson - ON03RC C. J. Thomas - MG01 RC G. D. Gilbert - CN01 RC NCMPA-1 SREC PMPA NCEMC ONS Master File - ON03DM (File OS 801.01)
MNS Master File - MG01DM CNS Master File - CN01 DM ELL - EC050
29 ol 93 N) CD L
CD 10 RIS 2002-09 Page 1 of 1 INrC FORM 63X U.S. NUCLEAR REGULATORY COMM=ESON APMROVED1YaO N(O.3Ms-01311 Expums Cmura ad smourm for eplmwo meawululias.
S sM co"O I pa b
?
OPERATOR LICENSING ieu imel im W:necmd Uueren 205Eanl. I y
0a4 EXAMINATION DATA 1012 (3 of man3Mami rd 2 jawd de*div.
no4 ~w4o Vmmatid 40Mda Comb of fumb~i.to NROm.wy not ontto-pror sad a atoon Is ami wq.*md to roycd (a. Me Wn FAILt~
rrW NC&14 A. PROPOSED EXAMINATION PREPARATION SCHEDUL PROPOSED NUMBER y-20 CY 2-4 )CY4,46 cvyQO~
LIE ENSEE-PIREPARED EXALUNArhONS E3TIIMATID 14UMBER OF~
INRC-PREPARW
/
B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPO:SED NUMBER Cy 0OO3 cy QO01 lya D04cvOO 14UMBEIR OF REACTOR OPERATORS
.5 15 NUM BER OF SENIOR REACTOR OPERATORS - INSTAN[T NUM&ER Of SENI0R REACTOR OPERATORS - UPGRADE5" NIUMBER OF SENI9DA REACTOR OPERATORS - UMITED PROPO~SP-b bATES
(//0_
PRIMARY DATE
~
/
0 0 ALTERNTEDAT 71D 3 1/ID1)05-
/,/ZO 1C. PROPOSED GENERIC FUNDAMENTAL$ EXAMINATION (GFE) SCHED2ULE PROPOSED NUMEIER microwdsR (&Mm CY"3 CY a00A, 1 I
I I
-tk &11 vi i0vj I W,-,
Attachment III PC FORm u00IuMAE "oIILA10UWmom4m Noojwlyew
==731
- tVOWAM, WM@=
OPERATOR LICENSING W"7 "t l&*'=4 f.
EXAMINATION DATA 0"1.
Catawba II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY 2_003 CY 2004 CY 2005 CY2006 ES1MATED MMBE OF UCNEE44R9PARED 16 9
99 COTMMATRO*M 0
0 0
0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER Cy 2003 CV_2004 CYQ05 CY22.06 NWOUR OF REACTOR OPEMATORS 7
5 5
5 NUWA OF SENIOR PEACTOR OPERATORS. NtsTNr 4222
?MA8R~f OP,SENIO R REACTOR OPERATORS-UPGRAOE 5
2 2
2 WMER OF SENIOR REACTOR O*ERATORS-LUEED 0
0 0
0 PROPOSED DATES
______DATE 3/31/03 10/1/04 10/15/05 10/15/06 LUTERNATE DATE 4/14/03 10/15/04 10/31/05 10/31/06 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2003 P'Sc amn ftnwi~
Pf CY 2004 I
I I
I 10C ftV0A!"d 0,V"