Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 EntffAY RO. Box 249 Buchanan, NY 10511-0249 July 15, 2002 Re:

Indian Point Unit No. 2 Docket No. 50-247 NL-02-098 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report - June 2002

Dear Sir:

Enclosed is the Monthly Operating Report for Indian Point Unit No. 2 for June 2002.

There are no commitments contained in this letter.

Should you have any questions regarding this matter, please contact Mr. John McCann, Manager, Licensing, Indian Point Energy Center (914) 734-5074.

erly, Fred Dacimo Vice President - Operations Indian Point 2 Enclosure cc:

Mr. Hubert J. Miller Regional Administrator - Region I US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Senior Resident Inspector US Nuclear Regulatory Commission Indian Point Unit 2 PO Box 38 Buchanan, NY 10511 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

NL-02-098 Enclosure Page 1 of 4 OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-247 July 3, 2002 K. Krieger (914)734-5146 OPERATING STATUS

1.
2.
3.
4.
5.
6.
7.

8.

Unit Name:

INDIAN POINT UNIT No. 2 Notes Reporting Period:

June-2002 Licensed Thermal Power ( MWt):

3071.4 Nameplate Rating ( Gross Mwe ):

1008 Design Electrical Rating ( Net Mwe):

986 Maximum Dependable Capacity (Gross Mwe):

965 Maximum Dependable Capacity (Net Mwe ):

931 If Changes Occur in Capacity Ratings ( Items Number 3 Through 7 ) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any ( Net Mwe):
10. Reasons For Restrictions, If Any:

This Month

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated ( MWH)
17. Gross Electrical Energy Generated ( MWH)
18. Net Electrical Energy Generated ( MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor ( Using MDC Net)
22. Unit Capacity Factor ( Using DER Net)
23. Unit Forced Outage Rate 720 720 0

720 0

2,207,132 726,015 701,448 100.0 100.0 104.6 98.8 0

Yr.-to-Date 4,343 4,343 0

4,343 0

13,253,965 4,389,273 4,243,656 100.0 100.0 103.8 99.1 0

Cumulative 245,448 170,843.75 4,566.64 166,984.05 0

469,766,368 146,636,163 140,466,578 68.0 68.0 64.1 62.0 14.1

24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration Of Each ) :

Refueling and maintenance outage scheduled for October 26, 2002 for a duration of approximately 35 days.

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status ( Prior to Commercial Operation ) :

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast N/A N/A N/A Achieved N/A N/A N/A (9/77)

NL-02-098 Enclosure Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE July 3, 2002 COMPLETED BY K. Krieger TELEPHONE (914)734-5146 June-2002 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 979 2

981 3

980 4

979 5

979 6

980 7

981 8

981 9

979 10 980 11 979 12 977 13 977 14 978 15 978 16 978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 978 18 977 19 972 20 973 21 972 22 972 23 970 24 972 25 968 26 961 27 959 28 958 29 966 30 965 31 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

MONTH

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June-2002 DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE July 3, 2002 COMPLETED BY K. Krieger TELEPHONE (914)734-5146 2

F : Forced S : Scheduled 3

Reason:

A - Equipment Failure ( Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 4 Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other (Explain)

Exibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report ( LER ) File ( NUREG-0161) 5 Exibit I - Same Source (9/77)

"It.'i~L.

0

+-ý Licensee t

No.

Date 0 5 Event C.

Cause & Corrective Action to Prevent Recurrence

=

E U

V Report# #

o NONE 1

CD 0

M) ci,

-t 0

0o

NL-02-098 Enclosure Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE June 2002 Unit 2 operated at full power for the entire month of June 2002.

Major Safety Related Maintenance DATE W.O #

SYSTEM COMPONENT COMPLETED WORK PERFORMED 1P2-02-47093 6/12/02 P2-02-4749 ABD 6/18/02 Performed repairs on emergency diesel generator IP2-02-47622 B

6/18/02 building structural steel fireproofing.

IP2-02-47622 6/25/02 IP2-02-47634 6/19/02 Replaced Weld Channel and Containment SD FIT-1126-1 6Pressurization System Zone 1 and Zone 2 flow indication transmitter transfer relays.

IP2-02-02652 SD PCV-1 110-8 6/25/2002 Replaced Weld Channel and Containment Pressurization System pressure control valve.

IP2-02-01011 PC 23CHP 6/29/2002 Repair on charging pump suction line.