June 2002 Monthly Operating Report for Watts Bar
ML021980163
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/12/2002
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021980163 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 50.4 rJUL 1 2 2002 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)

JUNE 2002 REPORT Docket Nos.

50-390 MONTHLY OPERATING Enclosed is the June 2002 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

If you have any questions concerning this matter, please call me at (423) 365-1824.

Sincerely, Pace Manager, Site Licensing and Industry Affairs Enclosure cc:

See page 2 Printed on recycled paper

) )

U.S. Nuclear Regulatory Commission Page 2 JUL 12 2002 PLP:RAS Enclosure cc (Enclosures):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.

L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT JUNE 2002 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-390 WBN Unit 1 July 3, 2002 D. K. Flournoy (423) 365-3803 June 2002

1.

Design Electrical Rating (MWe-Net):

2.

Maximum Dependable Capacity (MWe-Net):

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month 720 720 Year-to-Date 3672.1 3612.9 Cumulative 48771.0 48513.5 0.0 0.0 0.0 812577 4092629 53479345 E-2 1155 1125

UNIT SHUTDOWNS 50-390 WBN-1 July 3, 2002 D. K. Flournoy (423) 365-3803 The unit operated at or near full power for the entire month of June 2002. No significant power reductions or shutdowns occurred during this reporting period.

F: Forced 2 Reason:

3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER)

C-Refueling 3-Automatic Trip/Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Summary:

The unit operated at or near full power for the entire month of June 2002. No significant power reductions or shutdowns occurred during this reporting period.

There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month of June 2002.

E-3 REPORT PERIOD: May 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE: