July 12, 2002 Mr. John T. Conway Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - CORRECTION OF SAFETY EVALUATION ON ALTERNATIVE REGARDING EXCESS FLOW CHECK VALVE TESTING FREQUENCY (TAC NO. MB1491)
Dear Mr. Conway:
By letter dated September 17, 2001, the Nuclear Regulatory Commission (NRC) staff authorized a relief for certain excess flow check valves (EFCVs) as a result of your application dated March 27, 2001. Subsequently, by a letter dated June 28, 2002, Mr. B. S. Montgomery of your company informed the NRC of two inadvertent errors in the March 27, 2001, application for relief. Specifically, valves 2RCS*EFV44A and B should not have been included in the list of EFCVs for the subject relief. The list was reproduced in the NRC staffs safety evaluation accompanying the relief.
Enclosed please find a corrected page 2 of the safety evaluation, showing deletion of valves 2RCS*EFV44A and B. Please use this to correct your records.
Sincerely,
/RA by PTam for RLaufer/
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
As stated cc w/encl: See next page
July 12, 2002 Mr. John T. Conway Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - CORRECTION OF SAFETY EVALUATION ON ALTERNATIVE REGARDING EXCESS FLOW CHECK VALVE TESTING FREQUENCY (TAC NO. MB1491)
Dear Mr. Conway:
By letter dated September 17, 2001, the Nuclear Regulatory Commission (NRC) staff authorized a relief for certain excess flow check valves (EFCVs) as a result of your application dated March 27, 2001. Subsequently, by a letter dated June 28, 2002, Mr. B. S. Montgomery of your company informed the NRC of two inadvertent errors in the March 27, 2001, application for relief. Specifically, valves 2RCS*EFV44A and B should not have been included in the list of EFCVs for the subject relief. The list was reproduced in the NRC staffs safety evaluation accompanying the relief.
Enclosed please find a corrected page 2 of the safety evaluation, showing deletion of valves 2RCS*EF44VA and B. Please use this to correct your records.
Sincerely,
/RA by PTam for RLaufer/
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
As stated cc w/encl.: See next page DISTRIBUTION:
PUBLIC S. Little ACRS G. Hill (2)
PDI-1 Reading File P. Tam B. Platchek, RGI OGC Y. S. Huang S. Richards R. Laufer T. Bergman, EDO RI B. Platchek Accession Number: ML021970360 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME PTam SLittle RLaufer DATE 7/12/02 7/12/02 7/12/02 OFFICIAL RECORD COPY from the bienniel requirement to verify that the valve position is accurately indicated. The NRC staff has completed its review of the relief request and is providing the following evaluation.
2.0 VALVE RELIEF REQUEST GVRR-8 The licensee requests relief for the following EFCVs from the ASME Code inservice tests that are required to be performed every refueling outage as specified in OM-10, Paragraph 4.3.2.2, and from the bienniel requirements (Paragraph 4.1 of OM-10) of verifying that the valve position is accurately indicated. The relief request allows that a representative sample of the affected EFCVs be tested each refueling cycle (approximately 24 months) such that each EFCV will be tested at least once every 10 years.
Excess Flow Check Valves Included in Relief Request GVRR-8 2CSH*EFV3 2ISC*EFV26 2ISC*EFV8 2RCS*EFV46B 2CSL*EFV1 2ISC*EFV27 2MSS*EFV1A 2RCS*EFV47A 2ICS*EFV1 2ISC*EFV28 2MSS*EFV1B 2RCS*EFV47B 2ICS*EFV2 2ISC*EFV29 2MSS*EFV1C 2RCS*EFV48A 2ICS*EFV3 2ISC*EFV3 2MSS*EFV1D 2RCS*EFV48B 2ICS*EFV4 2ISC*EFV30 2MSS*EFV2A 2RCS*EFV52A 2ICS*EFV5 2ISC*EFV31 2MSS*EFV2B 2RCS*EFV52B 2ISC*EFV1 2ISC*EFV32 2MSS*EFV2C 2RCS*EFV53A 2ISC*EFV10 2ISC*EFV33 2MSS*EFV2D 2RCS*EFV53B 2ISC*EFV11 2ISC*EFV34 2MSS*EFV3A 2RCS*EFV62A 2ISC*EFV13 2ISC*EFV35 2MSS*EFV3B 2RCS*EFV62B 2ISC*EFV14 2ISC*EFV36 2MSS*EFV3C 2RCS*EFV63A 2ISC*EFV15 2ISC*EFV37 2MSS*EFV3D 2RCS*EFV63B 2ISC*EFV17 2ISC*EFV38 2MSS*EFV4A 2RHS*EFV5 2ISC*EFV18 2ISC*EFV39 2MSS*EFV4B 2RHS*EFV6 2ISC*EFV2 2ISC*EFV4 2MSS*EFV4C 2RHS*EFV7 2ISC*EFV20 2ISC*EFV40 2MSS*EFV4D 2WCS*EFV221 2ISC*EFV21 2ISC*EFV41 2WCS*EFV222
2ISC*EFV22 2ISC*EFV42 2WCS*EFV223
2ISC*EFV23 2ISC*EFV5 2RCS*EFV45A 2WCS*EFV224 2ISC*EFV24 2ISC*EFV6 2RCS*EFV45B 2WCS*EFV300 2ISC*EFV25 2ISC*EFV7 2RCS*EFV46A 2.1 Basis for Relief The licensee states:
Pursuant to 10 CFR 50.55a(a)(3)(i), authorization is requested to implement an alternative to the requirements of OM-10, paragraph 4.1 and 4.3.2.2(e), which specify that position indication of valves be verified at least once every two years; and full-stroke exercising of check valves be conducted during each refueling outage, respectively.
The proposed alternative is to conduct exercising and valve position verification tests on a representative sample of reactor instrumentation line EFCVs in accordance with the proposed amendment for Technical Specification (TS) Surveillance Requirement (SR) 3.6.1.3.9 submitted in letter NMP2L 1996 dated February 5, 2001. The representative Corrected by letter dated 7/12/02
Nine Mile Point Nuclear Station Unit No. 2 cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector Nine Mile Point Nuclear Station P.O. Box 126 Lycoming, NY 13093 Mr. John V. Vinquist, MATS Inc.
P.O. Box 63 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW.
Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group 250 W. Pratt Street - 24th Floor Baltimore, MD 21201-2437 Mr. Raymond L. Wenderlich Senior Constellation Nuclear Officer Responsible for Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 James M. Petro, Jr., Esquire Counsel Constellation Power Source, Inc.
111 Market Place Suite 500 Baltimore, MD 21202 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399