0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 July 11, 2002 L-2002-133 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operatinq Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the June 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please co act us should there be any questions regarding this information.
Ve~ry t
- yours, Donald E. Jer an Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit 1 July 1, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: June 2002
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximum Dependable Capacity (Mwe-Net).
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH).
830 839 MONTH 720 720 0.0 611470
-YTD 4343 4343 0.0 3717209 CUMULATIVE 180943.5 179130 0.0 146393948
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie #1 July 1, 2002 J. A. Rogers (772) 467-7296 REPORT MONTH June 2002 Unit 1 operated at essentially full power through the entire month of June.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie #1 July 1, 2002 J.A.Rogers (772) 467-7296 REPORT MONTH June 2002 Reason A -
Equipment Failure (Explain)
B - Maintenance or Test C
Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 -
Manual 2 -
Manual Scram 3 - Automatic Scram 4
Continued 5
Load Reduction 9
- Other (Explain)
Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor 3 Prevent Recurrence Unit I operated at essentially full power for the entire month of June.
1 F
Forced S
Scheduled 091587 PPL
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 July 1, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: June 2002
- 1. Design Electrical Rating (Mwe-Net).
- 2. Maximum Dependable Capacity (Mwe-Net)_
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH) 830 839 MONTH 720 720 0.0 609805
-YTD 4328.4 4325.6 0.0 3685563 CUMULATIVE 144341.6 142583.3 0.0 117416209
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie #2 July 1, 2002 J. A.Rogers (772) 467-7296 REPORT MONTH June 2002 Unit 2 operated at essentially full power through the entire month of June.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie #2 July 1, 2002 J.A.Rogers (772) 467-7296 REPORT MONTH June 2002 Reason A - Equipment Failure (Explain)
B - Maintenance or Test C -
Refueling D - Regulatory Restriction E - Operator Training & License Examination F
Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 -
Manual 2 - Manual Scram 3 - Automatic Scram 4
Continued 5 - Load Reduction 9 - Other (Explain) 091587 PPL Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor 3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of June.
1 F
Forced S
Scheduled 2