MONTHYEARML0218000032002-07-0202 July 2002 Summary of Conference Calls with North Atlantic Energy Service Corp. Regarding 2002 Steam Generator Inspection Results Project stage: Other ML0225903282002-09-20020 September 2002 Summary of Conference Call with North Atlantic Energy Service Corporation the 2002 Steam Generator Inspection Results at Seabrook Station, Unit No. 1 Project stage: Other ML0230900022002-11-0101 November 2002 Meeting with FPL Energy Seabrook Re the Root Cause Evaluation for Axial Outside Diameter Indications Identified on Steam Generator Tubes at Seabrook During the May 2002, Refueling Outage Project stage: Request ML0233000412002-11-26026 November 2002 Summary of October 9, 2002, Conference Call with North Atlantic Energy Service Corp Regarding Seabrook Station Steam Generator Tube Lab Examination Results Project stage: Other ML0233004352002-11-26026 November 2002 Summary of 11/14/2002 Meeting with FPL Energy Seabrook, LLC (Fple Seabrook) to Discuss the Root Cause Evaluation for Axial Outside Diameter Indications on Steam Generator Tubes Project stage: Meeting 2002-11-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
July 2, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SUMMARY
OF CONFERENCE CALLS WITH NORTH ATLANTIC ENERGY SERVICE CORPORATION REGARDING THE 2002 STEAM GENERATOR INSPECTION RESULTS AT SEABROOK STATION, UNIT NO. 1 (SEABROOK)
(TAC NO. MB5299)
Dear Mr. Feigenbaum:
On May 20 and 23, 2002, the Nuclear Regulatory Commission staff participated in conference calls with North Atlantic Energy Service Corporation representatives regarding the ongoing steam generator tube inspection activities at Seabrook. Enclosed please find a summary of those conference calls.
Sincerely,
/RA/
Robert D. Starkey, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
As stated cc w/encl: See next page
July 2, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SUMMARY
OF CONFERENCE CALLS WITH NORTH ATLANTIC ENERGY SERVICE CORPORATION REGARDING THE 2002 STEAM GENERATOR INSPECTION RESULTS AT SEABROOK STATION, UNIT NO. 1 (SEABROOK)
(TAC NO. MB5299)
Dear Mr. Feigenbaum:
On May 20 and 23, 2002, the Nuclear Regulatory Commission staff participated in conference calls with North Atlantic Energy Service Corporation representatives regarding the ongoing steam generator tube inspection activities at Seabrook. Enclosed please find a summary of those conference calls.
Sincerely,
/RA/
Robert D. Starkey, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC BFu JZimmerman LLund DStarkey KKarwoski TClark DLew OGC ACRS SRichards (e-mail) CCowgill, RI Accession Number: ML021800003 *Concurrence via e-mail OFFICE PDI-2/PM PDI-2/LA* PDI-2/SC(A)
NAME DStarkey TClark JZimmerman DATE 7-2-02 07/02/02 7/2/02 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
William J. Quinlan, Esq. Mr. Stephen McGrail, Director Assistant General Counsel ATTN: James Muckerheide Northeast Utilities Service Company Massachusetts Emergency Management Agency P.O. Box 270 400 Worcester Road Hartford, CT 06141-0270 Framingham, MA 01702-5399 Mr. Peter Brann Philip T. McLaughlin, Attorney General Assistant Attorney General Steven M. Houran, Deputy Attorney State House, Station #6 General Augusta, ME 04333 33 Capitol Street Concord, NH 03301 Resident Inspector U.S. Nuclear Regulatory Commission Mr. Donald Bliss, Director Seabrook Nuclear Power Station New Hampshire Office of Emergency P.O. Box 1149 Management Seabrook, NH 03874 State Office Park South 107 Pleasant Street Town of Exeter Concord, NH 03301 10 Front Street Exeter, NH 03823 Mr. Daniel G. Roy Nuclear Training Manager Regional Administrator, Region I Seabrook Station U.S. Nuclear Regulatory Commission North Atlantic Energy Service Corp.
475 Allendale Road P.O. Box 300 King of Prussia, PA 19406 Seabrook, NH 03874 Office of the Attorney General Mr. James M. Peschel One Ashburton Place Manager - Regulatory Programs 20th Floor Seabrook Station Boston, MA 02108 North Atlantic Energy Service Corp.
P.O. Box 300 Board of Selectmen Seabrook, NH 03874 Town of Amesbury Town Hall Mr. Gene F. St. Pierre Amesbury, MA 01913 Station Director Seabrook Station Mr. Dan McElhinney North Atlantic Energy Service Corporation Federal Emergency Management Agency P.O. Box 300 Region I Seabrook, NH 03874 J.W. McCormack P.O. &
Courthouse Building, Room 401 Mr. Frank W. Getman, Jr.
Boston, MA 02109 President and Chief Executive Officer BayCorp Holdings, LTD 20 International Drive, Suite 301 Portsmouth, NH 03801-6809
Seabrook Station, Unit No. 1 cc:
Mr. Bruce D. Kenyon President and Chief Executive Officer Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Steve Allen Polestar Applied Technology, Inc.
77 Franklin Street, Suite 507 Boston, MA 02110
SUMMARY
OF CONFERENCE CALLS WITH NORTH ATLANTIC ENERGY SERVICE CORPORATION REGARDING THE MAY 2002 STEAM GENERATOR INSPECTION RESULTS AT SEABROOK The Nuclear Regulatory Commission (NRC) staff participated in conference calls on May 20 and 23, 2002, with North Atlantic Energy Service Corporation (North Atlantic) representatives regarding the ongoing steam generator (SG) tube inspection activities at Seabrook Station, Unit No. 1 (Seabrook).
Topics discussed during the conference call consisted of: background, initial eddy current testing scope, scope expansion plans, indications identified to-date, repair/plugging plans, new degradation findings, and tube-pull analysis plans.
Background
Seabrook is a four-loop Westinghouse 1,198 MWe PWR unit. Commercial operation started in August of 1990. The unit has operated for approximately 9.67 effective full power years (EFPY).
Seabrook has four Westinghouse Model-F recirculating steam generators (A, B, C, and D).
Each steam generator contains 5,626 thermally treated Inconel 600 tubes, which are nominally 0.688 inch in diameter with a wall thickness of 0.040 inches. Prior to installation, the tubes in Rows 1 through 10 were treated in a furnace in order to relieve the stresses from bending the tubes. Each SG contains eight stainless steel tube support plates and six anti-vibration bars in the U-bend region. The first tube support plate is a partial plate which consists of only a plate ring with drilled tube holes (i.e., the plate only supports a limited number of tubes in the periphery). The remaining seven plates contain quatrefoil broached tube holes. Plates 1 - 4 are 0.75 inches in thickness; Plates 5 - 8 are 1.12 inches thick.
New Degradation Findings During the current refueling outage at Seabrook in May 2002, North Atlantic performed SG tube inspections as required by the technical specifications. The initial scope of the inspection included two of the four SGs -- A and D. While performing bobbin probe inspections of tubes in SG D, North Atlantic detected indications at a number of tube to tube support plate intersections. Subsequent plus-point probe inspection confirmed the indications as axially oriented linear indications, initiating on the outside diameter (OD) tube surface. North Atlantic also performed ultrasonic testing (UT) on a few of the indications, which further confirmed the findings. At this stage, North Atlantic classified these indications as axial OD cracking.
North Atlantic noted that all indications are confined to the intersection locations in the portion of the tube within the thickness of the tube support plates, opposite the broached tube hole lands.
As of May 23, 2002, North Atlantic found that 42 of these intersections contain axial OD Enclosure
indications. These 42 intersections are located in 15 tubes between Row 2 and Row 9 of SG D. The indications are located at tube support plates 2 through 6 on the hot leg side and 3 through 5 on the cold leg side. If a tube had an indication at a cold-leg tube support plate, it also had one or more indications at a hot-leg tube support plate. The maximum depth of the indications was estimated to be 62% through-wall (TW) using available techniques. Lengths range from 0.3 to 0.75 inches.
Based on the axial cracking indications found in SG D, North Atlantic re-trained the eddy current analysts to be sensitive to the characteristics of the signals and expanded the inspection to include 100% of the active tubes in SGs B and C. No similar degradation was found in these SGs.
Other Findings As a result of the inspections, North Atlantic plugged 13 tubes in SG A. Five were plugged due to anti-vibration bar (AVB) wear. One of the 13 plugged tubes was due to a volumetric indication above the top of the tube sheet. The volumetric indication was caused by foreign objects. As a precaution, North Atlantic plugged the tube and the seven surrounding tubes.
In addition to plugging the 15 tubes with axial indications in SG D, North Atlantic plugged 6 tubes as a result of AVB wear and one tube for a volumetric indication. The volumetric indication was near the top of the tubesheet in the periphery. The depth was measured to be 46% through-wall. The indication was attributed to a loose part. (Although no loose part was visually identified, sludge lancing may have removed the foreign object.)
North Atlantic inspected SGs B and C based on finding the crack-like indications in SG D.
North Atlantic inspected 100% of the tubes with bobbin probes, 50% of Row 1 and Row 2 U-bends with plus point probes, and tubesheet transition region with plus point probes. No crack-like indications were detected as a result of these inspections.
Tube-Pull Analysis As a result of the axial OD cracking findings, North Atlantic has pulled two tubes for metallurgical analysis to characterize the degradation and to identify its root cause. The pulled tubes contain four intersections with indications including the one with the maximum voltage amplitude and the one with the maximum measured depth. These two tubes and the rest of the affected tubes will be plugged.
North Atlantic indicated that the analysis will take about 4 weeks. As results from the root-cause analysis become available, North Atlantic will discuss them with the NRC staff.