P.O. Box 63 Lycoming, New York 13093 Constellation Nuclear Nine Mile Point Nuclear Station A Member of the Constellation Energy Group June 12, 2002 NMP2L 2062 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Monthly Operating Report for May 2002 Gentlemen:
Submitted herewith is the Operating Data Report, the Unit Shutdowns, Operating Experience for May, 2002.
and Summary of Very truly yours, Michael F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management Pr
Subject:
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2
SUMMARY
OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 102.13% and an availability factor of 100% for the month of May 2002.
On May 12, 2002, at 1726 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.56743e-4 months <br />, an unplanned power change was performed in response to feedwater heating level control problems. Reactor power was lowered to 75% of rated in accordance with plant operating procedures to a condition where feedwater heater level controls were more stable. Repairs were made to feedwater heater level control valves 2HDL-LV24B, and 25C. Level transmitter 2HDL-LT4C was replaced. All repairs were completed and the plant was returned to full power operation at 2257 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.587885e-4 months <br /> on May 13, 2002.
There were no challenges to the safety relief valves during this reporting period.
UNIT SHUTDOWNS DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 06/04/02 APPENDIX B REPORTING PERIOD - May 2002 Prepared by: T. McMahon TELEPHONE: (315) 349-4045 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
OPERATING DATA REPORT DOCKET NO.: 50-410 DATE: 06/04/02 PREPARED BY: T. McMahon TELEPHONE: (315) 349-4045 OPERATING STATUS Unit Name:
Reporting Period:
Design Electrical Rating (MWe)
Maximum Dependable Capacity (Net MWe):
- 3. Number of Hours Reactor was Critical
- 4. Hours Generator On-Line
- 5. Reactor Reserve Shutdown Hours
- 6. Net Electrical Energy Gen. (MWH)
Nine Mile Point Unit #2 May 2002 1143.3 1119.8 This Month 744.0 744.0 0.0 850,844.0
- 1.
2.
Yr-to-Date 2,899.2 2,847.1 0.0 3,222,993.4 Cumulative 98,102.5 95,228.0 0.0 99,281,326.1
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM flnri impnt A) /4 2 r---i...
Applicability:
Li Unit 1
References:
DER Prepared: -;-7/ a**" e.S A
sV,,f-.
4a Print ir-nit 2 11 Site NCTS Signature Name Developmental Review E5 Ucensing EC Engineering DueDae04
~
~
Due Date: K.t,1'1O &
QflierZilZL/
Date
_Signature TechnicallSafety Reviews Technical Review El N/R Designees:
SORC:
El N/R SRAB:
LI NIR Final Review EO Engineering Manager I] Generation:
Operations Manager Tech Support Manager Maintenance Manager o lAttomey i
Ucensing Manager SPlant Manager C Other ol Proofreader El Tech Spec 6.5.2 (CTS)
[] Other Meeting No.:
Meeting No.:
1.Pe, k h, a, m-.
Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El WR El N/R 11 N/R LDCR #
NCTS #s 01 Completed per NLAP-RPR-01 on (date)
Page 17 Nj Z j
'9-Generation E] Other NIP-IRG-01 Rev 17 D-ument:
A-JMI 'Z F.
6,- -e L,- 4 -- V-1 -e U12 6 #1 be, w
e &,,e
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Docum Applicability:
References:
DER Prepared: /'*5c'kfl Print Developmental Review El Licensing El Engineering ent
,QAI/0 2 I-,
El Unit 1 IJ nit 2 pz
Name El Site Due Date:
NCTS OOfer
-5Z-,
Signature Date//
Signature SGeneration El Other TechnicallSafety Reviews Technical Review El N/R Designees:
SORC:
El N/R SRAB:
El N/R Final Review El Engineering Manager El Generation:
D.
as
/.
El Tech Spec 6.5.2 (CTS)
C. cavaCc/o El Other Meeting No.:
Meeting No.:
to.
Operations Manager Tech Support Manager Maintenance Manager El RAttorney U]
Lcensing Manager SPlant Manager El Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence ElN/R El NIR El N/R LDCR #
NCTS#'s El Completed per NLAP-RPR-01 on (date)
Page 17
-/0-- I2, NIP-IRG-01 Rev 17 ent:
A,,) NA 2,
=
W
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM NZM DL fliment: AJ 40 2-Applicability:
El Unit 1
References:
DER Prepared:
0" 14.,
,,3'7$
lt*,
Print Developmental Review El Licensing E-Engineering 1i Generation El Other Technical/Safety Reviews Technical Review:. El N/R Designees:
SORC:
El N/R SRAB:
El N/R RTJnit 2 11 Site NCTS Signature Name D,
V-IA % - wJ e C. S L.,
El Tech Spec 6.5.2 (CTS)
C.
Cae-aCCio Meeting No.:
Meeting No.:
Final Review El Engineering Manager El Generation:
Operations Manager Tech Support Manager Maintenance Manager El Attorney El Licensing Manager
[
Plant Manager El Other El Proofreader
/-1.
Pe,,k A a n,-,
Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El NIR El N/R El N/R LDCR#
NCTS #s El Completed per NLAP-RPR-01 on (date)
Page 17 Due Date:
-//
QSter Z
,e7, S.
Date I
/
Sijgnature E] Other NIP-IRG-01 Rev 17 SVA" 4ýt el
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Document A.,
2l, SA040-ý04 Applicability:
References:
DER Prepared: "i ek'me.S Print Developmental Review El Licensing El Engineering 1
Generation El Other Technical/Safety Reviews Technical Review: El N/R Designees:
SORC:
E] N/R SRAB:
El N/R Final Review El Engineering Manager El Generation:
Operations Manager Tech Support Manager Maintenance Manager
[] Attomey Li Ucensing Manager SPlant Manager El Other El Proofreader Disposition El Unit I 5"Jnit 2 Name ol Tech Spec 6.5.2 (CTS)
C. Cae 13 Site DueDate:
NCTS O__er Z
_,_._5, Signature Dater
/
Signature 19 Verification El Other Meeting No.:
Meeting No.:
FSAR Change:
NCTS Commitments:
Post Correspondence El N/R El NIR MlN/R LDCR #
NCTS IFS El Completed per NLAP-RPR-01 on (date)
Page 17 MUMM NIP-IRG-01 Rev 17 m r
=
=
F.
Q.
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Document A,QAjI/
2Z SV "0,0i i..i
!tý tA'il '
Applicability:
El Unit 1
References:
DER Prepared: "h y-ei A,,*
Print 51Onit 2 El Site NCTS Signature Name Developmental Review El Ucensing El Engineering Due Date: 6/1
-Z0 Date 1*1 Generation F.
--t4ý El Other TechnicallSafety Reviews Technical Review. El N/R Designees:
SORC:
El N/R SRAB:
11 N/R El Tech Spec 6.5.2 (CTS) 19 Verification QATR (ITS)
C.
Cav6C/Cio El Other Meeting No.:
Meeting No.:
Final Review El Engineering Manager El Generation:
Operations Manager Tech Support Manager Maintenance Manager El [Attorney El Ucensing Manager Manager El Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El N/R El N/R El N/R LDCR #
NCTS #s El Completed per NLAP-RPR-01 on Page 17 (date)
NIP-IRG-01 Rev 17 N Z 1" ~"