ML021770229

From kanterella
Jump to navigation Jump to search
May 2002 Monthly Operating Report for Nine Mile Point Unit 2
ML021770229
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/12/2002
From: Peckham M
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L 2062
Download: ML021770229 (9)


Text

P.O. Box 63 Lycoming, New York 13093 Constellation Nuclear Nine Mile Point Nuclear Station A Member of the Constellation Energy Group June 12, 2002 NMP2L 2062 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Monthly Operating Report for May 2002 Gentlemen:

Submitted herewith is the Operating Data Report, the Unit Shutdowns, Operating Experience for May, 2002.

and Summary of Very truly yours, Michael F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management Pr

Subject:

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2

SUMMARY

OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 102.13% and an availability factor of 100% for the month of May 2002.

On May 12, 2002, at 1726 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.56743e-4 months <br />, an unplanned power change was performed in response to feedwater heating level control problems. Reactor power was lowered to 75% of rated in accordance with plant operating procedures to a condition where feedwater heater level controls were more stable. Repairs were made to feedwater heater level control valves 2HDL-LV24B, and 25C. Level transmitter 2HDL-LT4C was replaced. All repairs were completed and the plant was returned to full power operation at 2257 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.587885e-4 months <br /> on May 13, 2002.

There were no challenges to the safety relief valves during this reporting period.

UNIT SHUTDOWNS DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 06/04/02 APPENDIX B REPORTING PERIOD - May 2002 Prepared by: T. McMahon TELEPHONE: (315) 349-4045 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

OPERATING DATA REPORT DOCKET NO.: 50-410 DATE: 06/04/02 PREPARED BY: T. McMahon TELEPHONE: (315) 349-4045 OPERATING STATUS Unit Name:

Reporting Period:

Design Electrical Rating (MWe)

Maximum Dependable Capacity (Net MWe):

3. Number of Hours Reactor was Critical
4. Hours Generator On-Line
5. Reactor Reserve Shutdown Hours
6. Net Electrical Energy Gen. (MWH)

Nine Mile Point Unit #2 May 2002 1143.3 1119.8 This Month 744.0 744.0 0.0 850,844.0

1.

2.

Yr-to-Date 2,899.2 2,847.1 0.0 3,222,993.4 Cumulative 98,102.5 95,228.0 0.0 99,281,326.1

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM flnri impnt A) /4  2 r---i...

Applicability:

Li Unit 1

References:

DER Prepared: -;-7/ a**" e.S A

sV,,f-.

4a Print ir-nit 2 11 Site NCTS Signature Name Developmental Review E5 Ucensing EC Engineering DueDae04

~

~

Due Date: K.t,1'1O &

QflierZilZL/

Date

_Signature TechnicallSafety Reviews Technical Review El N/R Designees:

SORC:

El N/R SRAB:

LI NIR Final Review EO Engineering Manager I] Generation:

Operations Manager Tech Support Manager Maintenance Manager o lAttomey i

Ucensing Manager SPlant Manager C Other ol Proofreader El Tech Spec 6.5.2 (CTS)

QATR (ITS)

C. 6v-Verification

[] Other Meeting No.:

Meeting No.:

1.Pe, k h, a, m-.

Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El WR El N/R 11 N/R LDCR #

NCTS #s 01 Completed per NLAP-RPR-01 on (date)

Page 17 Nj Z j

'9-Generation E] Other NIP-IRG-01 Rev 17 D-ument:

A-JMI 'Z F.

6,- -e L,- 4 -- V-1 -e U12 6 #1 be, w

e &,,e

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Docum Applicability:

References:

DER Prepared: /'*5c'kfl Print Developmental Review El Licensing El Engineering ent

,QAI/0 2 I-,

El Unit 1 IJ nit 2 pz

Name El Site Due Date:

NCTS OOfer

-5Z-,

Signature Date//

Signature SGeneration El Other TechnicallSafety Reviews Technical Review El N/R Designees:

SORC:

El N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

D.

as

/.

El Tech Spec 6.5.2 (CTS)

C. cavaCc/o El Other Meeting No.:

Meeting No.:

to.

Operations Manager Tech Support Manager Maintenance Manager El RAttorney U]

Lcensing Manager SPlant Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence ElN/R El NIR El N/R LDCR #

NCTS#'s El Completed per NLAP-RPR-01 on (date)

Page 17

-/0-- I2, NIP-IRG-01 Rev 17 ent:

A,,) NA 2,

=

W

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM NZM DL fliment: AJ 40 2-Applicability:

El Unit 1

References:

DER Prepared:

0" 14.,

,,3'7$

lt*,

Print Developmental Review El Licensing E-Engineering 1i Generation El Other Technical/Safety Reviews Technical Review:. El N/R Designees:

SORC:

El N/R SRAB:

El N/R RTJnit 2 11 Site NCTS Signature Name D,

V-IA % - wJ e C. S L.,

El Tech Spec 6.5.2 (CTS)

C.

Cae-aCCio Meeting No.:

Meeting No.:

Final Review El Engineering Manager El Generation:

Operations Manager Tech Support Manager Maintenance Manager El Attorney El Licensing Manager

[

Plant Manager El Other El Proofreader

/-1.

Pe,,k A a n,-,

Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El NIR El N/R El N/R LDCR#

NCTS #s El Completed per NLAP-RPR-01 on (date)

Page 17 Due Date:

-//

QSter Z

,e7, S.

Date I

/

Sijgnature E] Other NIP-IRG-01 Rev 17 SVA" 4ýt el

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Document A.,

2l, SA040-ý04 Applicability:

References:

DER Prepared: "i ek'me.S Print Developmental Review El Licensing El Engineering 1

Generation El Other Technical/Safety Reviews Technical Review: El N/R Designees:

SORC:

E] N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

Operations Manager Tech Support Manager Maintenance Manager

[] Attomey Li Ucensing Manager SPlant Manager El Other El Proofreader Disposition El Unit I 5"Jnit 2 Name ol Tech Spec 6.5.2 (CTS)

QATR (ITS)

C. Cae 13 Site DueDate:

NCTS O__er Z

_,_._5, Signature Dater

/

Signature 19 Verification El Other Meeting No.:

Meeting No.:

FSAR Change:

NCTS Commitments:

Post Correspondence El N/R El NIR MlN/R LDCR #

NCTS IFS El Completed per NLAP-RPR-01 on (date)

Page 17 MUMM NIP-IRG-01 Rev 17 m r

=

=

F.

Q.

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Document A,QAjI/

2Z SV "0,0i i..i

!tý tA'il '

Applicability:

El Unit 1

References:

DER Prepared: "h y-ei A,,*

Print 51Onit 2 El Site NCTS Signature Name Developmental Review El Ucensing El Engineering Due Date: 6/1

-Z0 Date 1*1 Generation F.

--t4ý El Other TechnicallSafety Reviews Technical Review. El N/R Designees:

SORC:

El N/R SRAB:

11 N/R El Tech Spec 6.5.2 (CTS) 19 Verification QATR (ITS)

C.

Cav6C/Cio El Other Meeting No.:

Meeting No.:

Final Review El Engineering Manager El Generation:

Operations Manager Tech Support Manager Maintenance Manager El [Attorney El Ucensing Manager Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El N/R El N/R El N/R LDCR #

NCTS #s El Completed per NLAP-RPR-01 on Page 17 (date)

NIP-IRG-01 Rev 17 N Z 1" ~"