Text

AmerGen AmerGen Energy Company, LLC Telephone: 717-944-7621 An Exelon/British Energy Company Three Mile Island Unit i Route 441 South, P.O. Box 480 Middletown, PA 17057 June 11, 2002 5928-02-20127 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND UNIT I (TMI UNIT 1)

OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289

SUBJECT:

MONTHLY OPERATING REPORT FOR MAY 2002 Enclosed are two copies of the May 2002 Monthly Operating Report for Three Mile Island Unit 1. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

Sincerely, George H. Gellrich Plant Manager GHG/awm

Enclosure:

Appendix A, and Appendix B cc: Administrator, Region I TMI-1 Senior Resident Inspector File 02001 7$

Document Control Desk 5928-02-20127 Page 2 of 3 APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-289 DATE June 11,2002 COMPLETED BY A. W. MILLER TELEPHONE (717) 948-8128 REPORTING PERIOD: May 2002 YEAR TO MONTH DATE CUMULATIVE

1. DESIGN ELECTRICAL RATING (MWe NET). 819.0 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. MAXIMUM DEPENDABLE CAPACITY (MWe NET). 802.0 The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3. NUMBER OF HOURS REACTOR WAS CRITICAL. 744.0 3,623.0 162,109.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4. HOURS GENERATOR ON LINE. 744.0 3,623.0 160,524.0 (Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of the hours that the generator was on line plus the total outage hours in the reporting period.
5. UNIT RESERVE SHUTDOWN HOURS. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6. NET ELECTRICAL ENERGY (MWH). 622,103.0 3,057,954.0 127,267,361.4 The gross electrical output of the unit measured at the output terminals of the turbine generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
    • Design values have no "Year to Date" or "Cumulative" significance.

Document Control Desk 5928-02-20127 Page 3 of 3 APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-289 DATE June 11,2002 COMPLETED BY A. W. MILLER TELEPHONE (717) 948-8128 REPORTING PERIOD: May 2002 Method of Cause &Corrective No Date Type1 Duration Reason 2 Shutting Action to (Hours) Down Prevent Recurrence ReactorN None 2 3 F Forced Reason Method S Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The plant entered May at 100% power and remained at 100% until approximately 03:00 on 5/27/02, when power was reduced to approximately 95% to allow for troubleshooting of a reactor demand control module. Power was restored to 100% at approximately 06:00 on 5/27/02. The plant remained at full power until approximately 00:30 on 5/31/02, when power was reduced to approximately 90% for planned main turbine control valve testing. Power was restored to 100% at approximately 06:30 on 5/31/02.